Rain days in Pantego, Texas

Pantego averages 56 rain days a year, counting days with at least 0.10 in of precipitation in the PRISM 4 km grid cell that contains it (1991-2020 normals). May is the wettest month at 6.7 rain days and August the driest at 3.6. That is close to the Texas median of 56.

Quick answers

How many rain days does Pantego get a year?

About 56: that many days in a normal year bring 0.10 in or more of rain or melted snow. That makes Pantego the 431st wettest of 784 Texas cities and towns.

What is the wettest month in Pantego?

May, with 6.7 rain days in a normal year. To cover 9 years in 10, plan for 11.

What is the driest month?

August, with 3.6 rain days (plan for 6).

How many heavy-rain days does Pantego get?

26 a year with 0.50 in or more, most often in May (3.2).

Why these counts are lower than some weather sites': a rain day here means 0.10 in or more. Counts based on 0.01 in (NOAA's "days with precipitation") or 0.04 in (WeatherSpark) also include drizzle and trace days.

Rain days by month

The wettest three months are April-June, with 16.6 rain days combined; the driest are July-September, with 11.9. November swings the most from year to year: it averages 4.3 rain days, but covering 9 years in 10 takes 9. The most rain days in a single month since 1981 was 18, in May 2015.

051015JanFebMarAprMayJunJulAugSepOctNovDec
Month Normal rain days Plan for
9 of 10 yrs
Heavy days
≥ 0.50 in
Precip (in) Record (year)
January 4.2 7 1.7 2.63 9 (1993)
February 4.3 8 2.0 2.77 10 (2018)
March 5.1 9 2.4 3.51 11 (2020)
April 4.5 6 2.5 3.23 10 (1990)
May 6.7 11 3.2 4.51 18 (2015)
June 5.4 10 2.5 3.67 13 (2004)
July 3.9 7 1.5 2.33 9 (2010)
August 3.6 6 1.6 2.38 9 (2016)
September 4.4 9 1.8 3.44 14 (2018)
October 5.0 7 2.8 4.72 14 (2009)
November 4.3 9 1.8 2.70 11 (2004)
December 4.1 6 1.9 2.94 10 (1991)
Year 55.5 25.9 38.83

Rain day: at least 0.10 in. Plan for: the 90th percentile of 1991-2020 yearly counts, rounded up to a whole day. Record: 1981 to date.

The last 12 months vs normal

From November 2025 through October 2026, Pantego had 44 rain days against a normal of 55.5: a dry stretch, 11.5 days below normal. 4 of 12 months came in above normal and 7 below. The biggest departure was April 2026, with 9 rain days against a normal of 4.5. Precipitation totaled 31.82 in against 38.83 in normally.

MonthRain daysNormalDifferencePrecip (in)Normal (in)
Nov 2025 6 4.3 +1.7 5.57 2.70
Dec 2025 0 4.1 -4.1 0.02 2.94
Jan 2026 2 4.2 -2.2 1.41 2.63
Feb 2026 1 4.3 -3.3 1.17 2.77
Mar 2026 3 5.1 -2.1 3.16 3.51
Apr 2026 9 4.5 +4.5 5.31 3.23
May 2026 7 6.7 +0.3 4.30 4.51
Jun 2026 4 5.4 -1.4 2.77 3.67
Jul 2026 4 3.9 +0.1 2.28 2.33
Aug 2026 0 3.6 -3.6 0.06 2.38
Sep 2026 3 4.4 -1.4 1.00 3.44
Oct 2026 5 5.0 +0.0 4.77 4.72

Pantego rain days month by month

Against the median Texas location, Pantego gets more rain days in May and fewer in August, by half a day or more; other months are within half a day.

Rain days in January

Pantego averages 4.2 rain days in January, 1.7 of them heavy, with 2.63 in of precipitation. Plan for 7 to cover 9 years in 10; the record is 9 (1993). January 2026 had 2, 2.2 below normal.

Rain days in February

Pantego averages 4.3 rain days in February, 2.0 of them heavy, with 2.77 in of precipitation. Plan for 8 to cover 9 years in 10; the record is 10 (2018). February 2026 had 1, 3.3 below normal.

Rain days in March

Pantego averages 5.1 rain days in March, 2.4 of them heavy, with 3.51 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 11 (2020). March 2026 had 3, 2.1 below normal.

Rain days in April

Pantego averages 4.5 rain days in April, 2.5 of them heavy, with 3.23 in of precipitation. Plan for 6 to cover 9 years in 10; the record is 10 (1990). April 2026 had 9, 4.5 above normal.

Rain days in May

Pantego averages 6.7 rain days in May, 3.2 of them heavy, with 4.51 in of precipitation. Plan for 11 to cover 9 years in 10; the record is 18 (2015). That is 0.8 more than the median Texas location (5.9). May 2026 had 7, right on normal.

Rain days in June

Pantego averages 5.4 rain days in June, 2.5 of them heavy, with 3.67 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 13 (2004). June 2026 had 4, 1.4 below normal.

Rain days in July

Pantego averages 3.9 rain days in July, 1.5 of them heavy, with 2.33 in of precipitation. Plan for 7 to cover 9 years in 10; the record is 9 (2010). July 2026 had 4, right on normal.

Rain days in August

Pantego averages 3.6 rain days in August, 1.6 of them heavy, with 2.38 in of precipitation. Plan for 6 to cover 9 years in 10; the record is 9 (2016). That is 0.6 fewer than the median Texas location (4.2). August 2026 had 0, 3.6 below normal.

Rain days in September

Pantego averages 4.4 rain days in September, 1.8 of them heavy, with 3.44 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 14 (2018). September 2026 had 3, 1.4 below normal.

Rain days in October

Pantego averages 5.0 rain days in October, 2.8 of them heavy, with 4.72 in of precipitation. Plan for 7 to cover 9 years in 10; the record is 14 (2009). October 2026 had 5, right on normal.

Rain days in November

Pantego averages 4.3 rain days in November, 1.8 of them heavy, with 2.70 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 11 (2004). November 2025 had 6, 1.7 above normal.

Rain days in December

Pantego averages 4.1 rain days in December, 1.9 of them heavy, with 2.94 in of precipitation. Plan for 6 to cover 9 years in 10; the record is 10 (1991). December 2025 had 0, 4.1 below normal.

Using these numbers in a construction schedule

For Pantego, the normal column is the expected count: 56 days over a full year, 34 of them from April through October. Put those days in the schedule as non-work days or float before the job starts, not after it slips.

Average or plan-for? An average is exceeded about half the time. If May work has no float, carry 11 weather days for it rather than 6.7: Pantego had that many or fewer in 9 of 10 years from 1991 to 2020. Use the normals across a long job and the plan-for figure only for months on the critical path.

Heavy days. Pantego averages 26 days a year with 0.50 in or more, most often in May (3.2). Those are the days most likely to stop earthwork, paving and concrete outright.

Claiming time for abnormal weather. Under AIA A201-2017 §15.1.6.2, a claim for extra time because of adverse weather has to show the conditions were abnormal for the period, could not have been reasonably anticipated, and had an adverse effect on the scheduled work. The normals above show what could be anticipated in Pantego; the claim also needs the day-by-day record for your site and dates.

Price a rain-day report for a site in Pantego. Enter your dates to see actual rain days against this normal for free. The full PDF ($99) adds the daily record, a month-by-month comparison and a method statement you can attach to a schedule update or claim.

Check rain days near Pantego

What the weather delay claim report includes

Nearby

Pantego is in Tarrant County, which averages 56 rain days a year across the county. The two numbers are close but measure different things: the county figure averages all 130 of the county's grid cells, while Pantego's is the single 4 km cell at its Census point. A site elsewhere in Tarrant County can differ from both.

The nearest larger city, Arlington (2 mi away), averages 55 rain days a year, about the same as Pantego.

Closest other areas in Texas:

All Texas cities and counties

Related guides

Method and source

A rain day is a day with at least 0.10 in (2.54 mm) in PRISM's daily estimate, which covers the 24 hours ending 12:00 UTC. Heavy days use 0.50 in. Normals are 1991-2020 averages. Records run from 1981 to the last complete month. Figures are for the 4 km cell containing the Census point for Pantego (32.714884, -97.153882). Data through 2026-11-24; page updated 2026-11-25. How we count rain days.

Source: PRISM Group, Oregon State University, https://prism.oregonstate.edu. These are gridded estimates, not gauge readings; conditions at a particular site can differ.