Rain-Day Report Pricing: $99 per Site, Free Preview First
A RainDayRecord report costs $99 for one job site and one period. There are no subscriptions, accounts or per-day charges. Check the headline count free on the home page first, then pay only if you need the PDF.
What $99 buys
One Rain-Day Report is a PDF for:
- One site: a street address, or latitude and longitude for a site with no address yet, anywhere in the contiguous 48 states and DC.
- One period: any dates from January 1, 1981 to the latest PRISM day, up to 1,096 days (three years) in one report.
- One rain-day threshold: 0.10 in by default, or anything from 0.01 to 2.00 in to match your contract.
The PDF holds the rain days in your period against the 1991-2020 normal for the same calendar window, how many of the 30 baseline years had fewer, a month-by-month chart and table, counts at five thresholds (0.01, 0.10, 0.25, 0.50 and 1.00 in), the daily record in inches and millimetres, and a method statement ready to attach to a claim. The claim report page explains each part, and the sample below shows the layout.
Free and paid, side by side
| Free preview | Free rain-day pages | $99 report | |
|---|---|---|---|
| Location | Any address or coordinates | 13,348 US cities and counties | Any address or coordinates |
| Period | Your dates | 30-year normals and the last 12 months | Your dates, up to 1,096 days |
| What you get | Rain days vs normal and years beaten | Monthly normals, plan-for counts, heavy days, records | Full PDF: daily record, monthly table and chart, 5 thresholds, method |
| Cost | Free | Free | $99 per site and period |
The rain-day pages are the quickest way to plan a schedule; for example, Houston averages 9.0 rain days in June, with 15 to plan for in a wet year. The report is for documenting what actually happened at one site.
What counts as one report
A different site, a different period or a different threshold is a separate report. Some common cases:
- A long project. A job that ran from March 1, 2024 to August 31, 2026 is 914 days, so one $99 report covers the whole of it. A longer project needs one report per stretch of up to 1,096 days.
- Two delay periods on one job. If the dates fit inside 1,096 days, order one report covering both; the monthly table shows each month, so you can read each delay period off it. Otherwise order one per period.
- A linear project. A pipeline or highway job can cross several 4 km grid cells. Rain can differ a lot between cells, so order a report for each location you need to document.
- A different contract threshold. The report always includes five standard thresholds, so a second report is only needed if your contract uses another value, such as 0.20 in.
Paying and getting the PDF
You pay on Stripe's checkout page, by card or another method Stripe offers there, and Stripe emails a receipt. Your order page builds the PDF straight after payment, usually within seconds. The order link is your access to download it again; there is no account or password.
Before sending you to Stripe, we check that the report can be built. If you paid and it still fails, or the PDF does not match the site and dates you ordered, send us the order link within 30 days and we will regenerate it or refund what you paid. The full rules are in our terms of sale, and how the data works covers the data source and its limits.
Frequently asked questions
Is there a subscription or volume price?
No. Every report is $99 per site and period, paid when you order it. There is nothing to cancel.
Can I see the result before I pay?
Yes. The free preview on the home page gives the rain-day count for your site and dates, the 1991-2020 normal for the same calendar window and how many of the 30 baseline years had fewer. You pay only for the PDF.
How does $99 compare with station-based reports?
Our claim report page lists other providers, the data each uses and their published prices. Station-based reports rely on the nearest gauge, which can be tens of miles from a rural site; ours uses the 4 km grid cell at the site.
Does the report prove my weather delay claim?
No report can do that on its own. It gives the weather data a claim needs: rain at the site against the normal for that period. The effect on your schedule comes from your own daily logs. See how to document weather delays. This is not legal advice.