RainDayRecord

Rain days in Bellflower, California

Bellflower averages 24 rain days a year, counting days with at least 0.10 in of precipitation in the PRISM 4 km grid cell that contains it (1991-2020 normals). February is the wettest month at 5.4 rain days and August the driest at 0.0. That is 8 fewer than the median California location (32).

Quick answers

How many rain days does Bellflower get a year?

About 24: that many days in a normal year bring 0.10 in or more of rain or melted snow. That makes Bellflower the 350th wettest of 449 California cities and towns.

What is the wettest month in Bellflower?

February, with 5.4 rain days in a normal year. To cover 9 years in 10, plan for 10.

What is the driest month?

August, with 0.0 rain days (plan for 0).

How many heavy-rain days does Bellflower get?

8 a year with 0.50 in or more, most often in January (2.2).

Why these counts are lower than some weather sites': a rain day here means 0.10 in or more. Counts based on 0.01 in (NOAA's "days with precipitation") or 0.04 in (WeatherSpark) also include drizzle and trace days.

Rain days by month

The wettest three months are December-February, with 14.1 rain days combined; the driest are June-August, with 0.3. January swings the most from year to year: it averages 5.0 rain days, but covering 9 years in 10 takes 11. The most rain days in a single month since 1981 was 16, in February 1998.

051015JanFebMarAprMayJunJulAugSepOctNovDec
Month Normal rain days Plan for
9 of 10 yrs
Heavy days
≥ 0.50 in
Precip (in) Record (year)
January 5.0 11 2.2 2.91 15 (1993)
February 5.4 10 2.1 3.07 16 (1998)
March 3.6 7 1.2 1.89 16 (1983)
April 1.6 4 0.5 0.72 9 (1983)
May 0.9 3 0.1 0.26 4 (2019)
June 0.2 0 0.0 0.07 3 (1995)
July 0.1 0 0.0 0.04 2 (2015)
August 0.0 0 0.0 0.00 2 (2023)
September 0.2 1 0.1 0.08 3 (1982)
October 1.1 2 0.2 0.41 5 (2010)
November 1.9 4 0.3 0.75 8 (1983)
December 3.7 6 1.3 2.08 12 (1984)
Year 23.7 7.9 12.27

Rain day: at least 0.10 in. Plan for: the 90th percentile of 1991-2020 yearly counts, rounded up to a whole day. Record: 1981 to date.

The last 12 months vs normal

From November 2025 through October 2026, Bellflower had 23 rain days against a normal of 23.7, close to normal overall. 4 of 12 months came in above normal and 6 below. The biggest departure was March 2026, with 0 rain days against a normal of 3.6. Precipitation totaled 14.83 in against 12.28 in normally.

MonthRain daysNormalDifferencePrecip (in)Normal (in)
Nov 2025 5 1.9 +3.1 4.57 0.75
Dec 2025 2 3.7 -1.7 2.61 2.08
Jan 2026 5 5.0 +0.0 2.42 2.91
Feb 2026 5 5.4 -0.4 3.07 3.07
Mar 2026 0 3.6 -3.6 0.00 1.89
Apr 2026 2 1.6 +0.4 0.63 0.72
May 2026 0 0.9 -0.9 0.05 0.26
Jun 2026 0 0.2 -0.2 0.00 0.07
Jul 2026 0 0.1 -0.1 0.00 0.04
Aug 2026 0 0.0 +0.0 0.00 0.00
Sep 2026 1 0.2 +0.8 0.65 0.08
Oct 2026 3 1.1 +1.9 0.83 0.41

Bellflower rain days month by month

Against the median California location, Bellflower gets fewer in January, February, March, April, November and December, by half a day or more; other months are within half a day.

Rain days in January

Bellflower averages 5.0 rain days in January, 2.2 of them heavy, with 2.91 in of precipitation. Plan for 11 to cover 9 years in 10; the record is 15 (1993). That is 1.0 fewer than the median California location (6.0). January 2026 had 5, right on normal.

Rain days in February

Bellflower averages 5.4 rain days in February, 2.1 of them heavy, with 3.07 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 16 (1998). That is 0.9 fewer than the median California location (6.3). February 2026 had 5, right on normal.

Rain days in March

Bellflower averages 3.6 rain days in March, 1.2 of them heavy, with 1.89 in of precipitation. Plan for 7 to cover 9 years in 10; the record is 16 (1983). That is 1.4 fewer than the median California location (5.0). March 2026 had 0, 3.6 below normal.

Rain days in April

Bellflower averages 1.6 rain days in April, 0.5 of them heavy, with 0.72 in of precipitation. Plan for 4 to cover 9 years in 10; the record is 9 (1983). That is 1.2 fewer than the median California location (2.8). April 2026 had 2, right on normal.

Rain days in May

Bellflower averages 0.9 rain days in May, 0.1 of them heavy, with 0.26 in of precipitation. Plan for 3 to cover 9 years in 10; the record is 4 (2019). May 2026 had 0, 0.9 below normal.

Rain days in June

Bellflower averages 0.2 rain days in June, 0.0 of them heavy, with 0.07 in of precipitation. Plan for 0 to cover 9 years in 10; the record is 3 (1995). June 2026 had 0, right on normal.

Rain days in July

Bellflower averages 0.1 rain days in July, 0.0 of them heavy, with 0.04 in of precipitation. Plan for 0 to cover 9 years in 10; the record is 2 (2015). July 2026 had 0, right on normal.

Rain days in August

Bellflower averages 0.0 rain days in August, 0.0 of them heavy, with 0.00 in of precipitation. Plan for 0 to cover 9 years in 10; the record is 2 (2023). August 2026 had 0, right on normal.

Rain days in September

Bellflower averages 0.2 rain days in September, 0.1 of them heavy, with 0.08 in of precipitation. Plan for 1 to cover 9 years in 10; the record is 3 (1982). September 2026 had 1, 0.8 above normal.

Rain days in October

Bellflower averages 1.1 rain days in October, 0.2 of them heavy, with 0.41 in of precipitation. Plan for 2 to cover 9 years in 10; the record is 5 (2010). October 2026 had 3, 1.9 above normal.

Rain days in November

Bellflower averages 1.9 rain days in November, 0.3 of them heavy, with 0.75 in of precipitation. Plan for 4 to cover 9 years in 10; the record is 8 (1983). That is 0.8 fewer than the median California location (2.7). November 2025 had 5, 3.1 above normal.

Rain days in December

Bellflower averages 3.7 rain days in December, 1.3 of them heavy, with 2.08 in of precipitation. Plan for 6 to cover 9 years in 10; the record is 12 (1984). That is 1.2 fewer than the median California location (4.9). December 2025 had 2, 1.7 below normal.

Using these numbers in a construction schedule

For Bellflower, the normal column is the expected count: 24 days over a full year, 4 of them from April through October. Put those days in the schedule as non-work days or float before the job starts, not after it slips.

Average or plan-for? An average is exceeded about half the time. If February work has no float, carry 10 weather days for it rather than 5.4: Bellflower had that many or fewer in 9 of 10 years from 1991 to 2020. Use the normals across a long job and the plan-for figure only for months on the critical path.

Heavy days. Bellflower averages 8 days a year with 0.50 in or more, most often in January (2.2). Those are the days most likely to stop earthwork, paving and concrete outright.

Claiming time for abnormal weather. Under AIA A201-2017 §15.1.6.2, a claim for extra time because of adverse weather has to show the conditions were abnormal for the period, could not have been reasonably anticipated, and had an adverse effect on the scheduled work. The normals above show what could be anticipated in Bellflower; the claim also needs the day-by-day record for your site and dates.

Price a rain-day report for a site in Bellflower. Enter your dates to see actual rain days against this normal for free. The full PDF ($99) adds the daily record, a month-by-month comparison and a method statement you can attach to a schedule update or claim.

Check rain days near Bellflower

What the weather delay claim report includes

Nearby

Bellflower is in Los Angeles County, which averages 26 rain days a year across the county. Bellflower gets 3 fewer rain days a year than that county-wide average.

The nearest larger city, Long Beach (8 mi away), averages 24 rain days a year, about the same as Bellflower.

Closest other areas in California:

All California cities and counties

Related guides

Method and source

A rain day is a day with at least 0.10 in (2.54 mm) in PRISM's daily estimate, which covers the 24 hours ending 12:00 UTC. Heavy days use 0.50 in. Normals are 1991-2020 averages. Records run from 1981 to the last complete month. Figures are for the 4 km cell containing the Census point for Bellflower (33.887821, -118.12725). Data through 2026-11-24; page updated 2026-11-25. How we count rain days.

Source: PRISM Group, Oregon State University, https://prism.oregonstate.edu. These are gridded estimates, not gauge readings; conditions at a particular site can differ.