RainDayRecord

Rain days in Monroe, Wisconsin

Monroe averages 73 rain days a year, counting days with at least 0.10 in of precipitation in the PRISM 4 km grid cell that contains it (1991-2020 normals). May is the wettest month at 8.5 rain days and January the driest at 4.2. That is close to the Wisconsin median of 72.

Quick answers

How many rain days does Monroe get a year?

About 73: that many days in a normal year bring 0.10 in or more of rain or melted snow. That makes Monroe the 137th wettest of 362 Wisconsin cities and towns.

What is the wettest month in Monroe?

May, with 8.5 rain days in a normal year. To cover 9 years in 10, plan for 12.

What is the driest month?

January, with 4.2 rain days (plan for 6).

How many heavy-rain days does Monroe get?

24 a year with 0.50 in or more, most often in June (3.8).

Why these counts are lower than some weather sites': a rain day here means 0.10 in or more. Counts based on 0.01 in (NOAA's "days with precipitation") or 0.04 in (WeatherSpark) also include drizzle and trace days.

Rain days by month

The wettest three months are April-June, with 23.9 rain days combined; the driest are December-February, with 13.5. October swings the most from year to year: it averages 5.9 rain days, but covering 9 years in 10 takes 10. The most rain days in a single month since 1981 was 18, in June 2010.

051015JanFebMarAprMayJunJulAugSepOctNovDec
Month Normal rain days Plan for
9 of 10 yrs
Heavy days
≥ 0.50 in
Precip (in) Record (year)
January 4.2 6 0.6 1.53 9 (1999)
February 4.5 7 0.8 1.68 9 (2019)
March 5.2 8 1.0 2.10 11 (2004)
April 7.1 10 2.1 3.77 11 (2026)
May 8.5 12 2.6 4.00 14 (2001)
June 8.3 12 3.8 6.05 18 (2010)
July 6.5 9 2.7 3.77 15 (2025)
August 6.5 9 2.8 4.37 13 (2007)
September 6.3 10 2.7 4.02 12 (2026)
October 5.9 10 2.1 3.10 13 (2009)
November 5.0 7 1.7 2.36 11 (1985)
December 4.8 7 1.0 1.90 13 (2008)
Year 72.8 23.9 38.65

Rain day: at least 0.10 in. Plan for: the 90th percentile of 1991-2020 yearly counts, rounded up to a whole day. Record: 1981 to date.

The last 12 months vs normal

From November 2025 through October 2026, Monroe had 67 rain days against a normal of 72.8: a dry stretch, 5.8 days below normal. 3 of 12 months came in above normal and 8 below. The biggest departure was September 2026, with 12 rain days against a normal of 6.3. Precipitation totaled 43.21 in against 38.65 in normally.

MonthRain daysNormalDifferencePrecip (in)Normal (in)
Nov 2025 5 5.0 +0.0 2.09 2.36
Dec 2025 4 4.8 -0.8 1.40 1.90
Jan 2026 3 4.2 -1.2 0.93 1.53
Feb 2026 1 4.5 -3.5 0.29 1.68
Mar 2026 3 5.2 -2.2 2.24 2.10
Apr 2026 11 7.1 +3.9 9.67 3.77
May 2026 3 8.5 -5.5 1.11 4.00
Jun 2026 8 8.3 -0.3 8.96 6.05
Jul 2026 3 6.5 -3.5 0.69 3.77
Aug 2026 9 6.5 +2.5 5.39 4.37
Sep 2026 12 6.3 +5.7 8.04 4.02
Oct 2026 5 5.9 -0.9 2.40 3.10

Monroe rain days month by month

Against the median Wisconsin location, Monroe gets more rain days in February and fewer in July and August, by half a day or more; other months are within half a day.

Rain days in January

Monroe averages 4.2 rain days in January, 0.6 of them heavy, with 1.53 in of precipitation. Plan for 6 to cover 9 years in 10; the record is 9 (1999). January 2026 had 3, 1.2 below normal.

Rain days in February

Monroe averages 4.5 rain days in February, 0.8 of them heavy, with 1.68 in of precipitation. Plan for 7 to cover 9 years in 10; the record is 9 (2019). That is 0.8 more than the median Wisconsin location (3.7). February 2026 had 1, 3.5 below normal.

Rain days in March

Monroe averages 5.2 rain days in March, 1.0 of them heavy, with 2.10 in of precipitation. Plan for 8 to cover 9 years in 10; the record is 11 (2004). March 2026 had 3, 2.2 below normal.

Rain days in April

Monroe averages 7.1 rain days in April, 2.1 of them heavy, with 3.77 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 11 (2026). April 2026 had 11, 3.9 above normal.

Rain days in May

Monroe averages 8.5 rain days in May, 2.6 of them heavy, with 4.00 in of precipitation. Plan for 12 to cover 9 years in 10; the record is 14 (2001). May 2026 had 3, 5.5 below normal.

Rain days in June

Monroe averages 8.3 rain days in June, 3.8 of them heavy, with 6.05 in of precipitation. Plan for 12 to cover 9 years in 10; the record is 18 (2010). June 2026 had 8, right on normal.

Rain days in July

Monroe averages 6.5 rain days in July, 2.7 of them heavy, with 3.77 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 15 (2025). That is 0.7 fewer than the median Wisconsin location (7.2). July 2026 had 3, 3.5 below normal.

Rain days in August

Monroe averages 6.5 rain days in August, 2.8 of them heavy, with 4.37 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 13 (2007). That is 0.5 fewer than the median Wisconsin location (7.0). August 2026 had 9, 2.5 above normal.

Rain days in September

Monroe averages 6.3 rain days in September, 2.7 of them heavy, with 4.02 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 12 (2026). September 2026 had 12, 5.7 above normal.

Rain days in October

Monroe averages 5.9 rain days in October, 2.1 of them heavy, with 3.10 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 13 (2009). October 2026 had 5, 0.9 below normal.

Rain days in November

Monroe averages 5.0 rain days in November, 1.7 of them heavy, with 2.36 in of precipitation. Plan for 7 to cover 9 years in 10; the record is 11 (1985). November 2025 had 5, right on normal.

Rain days in December

Monroe averages 4.8 rain days in December, 1.0 of them heavy, with 1.90 in of precipitation. Plan for 7 to cover 9 years in 10; the record is 13 (2008). December 2025 had 4, 0.8 below normal.

Using these numbers in a construction schedule

For Monroe, the normal column is the expected count: 73 days over a full year, 49 of them from April through October. Put those days in the schedule as non-work days or float before the job starts, not after it slips.

Average or plan-for? An average is exceeded about half the time. If May work has no float, carry 12 weather days for it rather than 8.5: Monroe had that many or fewer in 9 of 10 years from 1991 to 2020. Use the normals across a long job and the plan-for figure only for months on the critical path.

Heavy days. Monroe averages 24 days a year with 0.50 in or more, most often in June (3.8). Those are the days most likely to stop earthwork, paving and concrete outright.

Claiming time for abnormal weather. Under AIA A201-2017 §15.1.6.2, a claim for extra time because of adverse weather has to show the conditions were abnormal for the period, could not have been reasonably anticipated, and had an adverse effect on the scheduled work. The normals above show what could be anticipated in Monroe; the claim also needs the day-by-day record for your site and dates.

Price a rain-day report for a site in Monroe. Enter your dates to see actual rain days against this normal for free. The full PDF ($99) adds the daily record, a month-by-month comparison and a method statement you can attach to a schedule update or claim.

Check rain days near Monroe

What the weather delay claim report includes

Nearby

Monroe is in Green County, which averages 73 rain days a year across the county. The two numbers are close but measure different things: the county figure averages all 96 of the county's grid cells, while Monroe's is the single 4 km cell at its Census point. A site elsewhere in Green County can differ from both.

The nearest larger city, Janesville (32 mi away), averages 74 rain days a year, about the same as Monroe.

Closest other areas in Wisconsin:

All Wisconsin cities and counties

Related guides

Method and source

A rain day is a day with at least 0.10 in (2.54 mm) in PRISM's daily estimate, which covers the 24 hours ending 12:00 UTC. Heavy days use 0.50 in. Normals are 1991-2020 averages. Records run from 1981 to the last complete month. Figures are for the 4 km cell containing the Census point for Monroe (42.603432, -89.636505). Data through 2026-11-24; page updated 2026-11-25. How we count rain days.

Source: PRISM Group, Oregon State University, https://prism.oregonstate.edu. These are gridded estimates, not gauge readings; conditions at a particular site can differ.