RainDayRecord

Rain days in Merrill, Wisconsin

Merrill averages 71 rain days a year, counting days with at least 0.10 in of precipitation in the PRISM 4 km grid cell that contains it (1991-2020 normals). June is the wettest month at 8.6 rain days and February the driest at 3.0. That is close to the Wisconsin median of 72.

Quick answers

How many rain days does Merrill get a year?

About 71: that many days in a normal year bring 0.10 in or more of rain or melted snow. That makes Merrill the 224th wettest of 362 Wisconsin cities and towns.

What is the wettest month in Merrill?

June, with 8.6 rain days in a normal year. To cover 9 years in 10, plan for 13.

What is the driest month?

February, with 3.0 rain days (plan for 5).

How many heavy-rain days does Merrill get?

21 a year with 0.50 in or more, most often in June (3.1).

Why these counts are lower than some weather sites': a rain day here means 0.10 in or more. Counts based on 0.01 in (NOAA's "days with precipitation") or 0.04 in (WeatherSpark) also include drizzle and trace days.

Rain days by month

The wettest three months are May-July, with 23.9 rain days combined; the driest are December-February, with 10.7. June is also the least predictable month, with the widest gap between its average and its plan-for number. The most rain days in a single month since 1981 was 14, in June 2000.

051015JanFebMarAprMayJunJulAugSepOctNovDec
Month Normal rain days Plan for
9 of 10 yrs
Heavy days
≥ 0.50 in
Precip (in) Record (year)
January 3.5 6 0.3 1.16 7 (1999)
February 3.0 5 0.5 1.06 9 (2019)
March 4.4 7 0.9 1.73 9 (2025)
April 7.1 11 1.8 2.95 11 (2026)
May 7.9 11 2.5 3.70 12 (2015)
June 8.6 13 3.1 4.58 14 (2000)
July 7.4 10 2.6 3.89 13 (1999)
August 7.3 10 2.9 4.22 14 (1995)
September 6.9 10 2.4 3.88 12 (1992)
October 6.5 10 2.0 3.14 11 (2002)
November 4.4 7 1.4 1.99 10 (1985)
December 4.2 7 0.6 1.52 9 (1996)
Year 71.1 21.0 33.82

Rain day: at least 0.10 in. Plan for: the 90th percentile of 1991-2020 yearly counts, rounded up to a whole day. Record: 1981 to date.

The last 12 months vs normal

From November 2025 through October 2026, Merrill had 66 rain days against a normal of 71.2: a dry stretch, 5.2 days below normal. 5 of 12 months came in above normal and 7 below. The biggest departure was July 2026, with 3 rain days against a normal of 7.4. Precipitation totaled 30.52 in against 33.82 in normally.

MonthRain daysNormalDifferencePrecip (in)Normal (in)
Nov 2025 4 4.4 -0.4 1.16 1.99
Dec 2025 3 4.2 -1.2 1.41 1.52
Jan 2026 4 3.5 +0.5 1.88 1.16
Feb 2026 5 3.0 +2.0 1.27 1.06
Mar 2026 5 4.4 +0.6 2.83 1.73
Apr 2026 11 7.1 +3.9 5.66 2.95
May 2026 6 7.9 -1.9 1.96 3.70
Jun 2026 8 8.6 -0.6 4.86 4.58
Jul 2026 3 7.4 -4.4 2.46 3.89
Aug 2026 7 7.3 -0.3 2.50 4.22
Sep 2026 7 6.9 +0.1 2.69 3.88
Oct 2026 3 6.5 -3.5 1.84 3.14

Merrill rain days month by month

Against the median Wisconsin location, Merrill gets more rain days in September and October and fewer in January, February and March, by half a day or more; other months are within half a day.

Rain days in January

Merrill averages 3.5 rain days in January, 0.3 of them heavy, with 1.16 in of precipitation. Plan for 6 to cover 9 years in 10; the record is 7 (1999). That is 0.7 fewer than the median Wisconsin location (4.2). January 2026 had 4, 0.5 above normal.

Rain days in February

Merrill averages 3.0 rain days in February, 0.5 of them heavy, with 1.06 in of precipitation. Plan for 5 to cover 9 years in 10; the record is 9 (2019). That is 0.7 fewer than the median Wisconsin location (3.7). February 2026 had 5, 2.0 above normal.

Rain days in March

Merrill averages 4.4 rain days in March, 0.9 of them heavy, with 1.73 in of precipitation. Plan for 7 to cover 9 years in 10; the record is 9 (2025). That is 0.5 fewer than the median Wisconsin location (4.9). March 2026 had 5, 0.6 above normal.

Rain days in April

Merrill averages 7.1 rain days in April, 1.8 of them heavy, with 2.95 in of precipitation. Plan for 11 to cover 9 years in 10; the record is 11 (2026). April 2026 had 11, 3.9 above normal.

Rain days in May

Merrill averages 7.9 rain days in May, 2.5 of them heavy, with 3.70 in of precipitation. Plan for 11 to cover 9 years in 10; the record is 12 (2015). May 2026 had 6, 1.9 below normal.

Rain days in June

Merrill averages 8.6 rain days in June, 3.1 of them heavy, with 4.58 in of precipitation. Plan for 13 to cover 9 years in 10; the record is 14 (2000). June 2026 had 8, 0.6 below normal.

Rain days in July

Merrill averages 7.4 rain days in July, 2.6 of them heavy, with 3.89 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 13 (1999). July 2026 had 3, 4.4 below normal.

Rain days in August

Merrill averages 7.3 rain days in August, 2.9 of them heavy, with 4.22 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 14 (1995). August 2026 had 7, right on normal.

Rain days in September

Merrill averages 6.9 rain days in September, 2.4 of them heavy, with 3.88 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 12 (1992). That is 0.5 more than the median Wisconsin location (6.4). September 2026 had 7, right on normal.

Rain days in October

Merrill averages 6.5 rain days in October, 2.0 of them heavy, with 3.14 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 11 (2002). That is 0.5 more than the median Wisconsin location (6.0). October 2026 had 3, 3.5 below normal.

Rain days in November

Merrill averages 4.4 rain days in November, 1.4 of them heavy, with 1.99 in of precipitation. Plan for 7 to cover 9 years in 10; the record is 10 (1985). November 2025 had 4, right on normal.

Rain days in December

Merrill averages 4.2 rain days in December, 0.6 of them heavy, with 1.52 in of precipitation. Plan for 7 to cover 9 years in 10; the record is 9 (1996). December 2025 had 3, 1.2 below normal.

Using these numbers in a construction schedule

For Merrill, the normal column is the expected count: 71 days over a full year, 52 of them from April through October. Put those days in the schedule as non-work days or float before the job starts, not after it slips.

Average or plan-for? An average is exceeded about half the time. If June work has no float, carry 13 weather days for it rather than 8.6: Merrill had that many or fewer in 9 of 10 years from 1991 to 2020. Use the normals across a long job and the plan-for figure only for months on the critical path.

Heavy days. Merrill averages 21 days a year with 0.50 in or more, most often in June (3.1). Those are the days most likely to stop earthwork, paving and concrete outright.

Claiming time for abnormal weather. Under AIA A201-2017 §15.1.6.2, a claim for extra time because of adverse weather has to show the conditions were abnormal for the period, could not have been reasonably anticipated, and had an adverse effect on the scheduled work. The normals above show what could be anticipated in Merrill; the claim also needs the day-by-day record for your site and dates.

Price a rain-day report for a site in Merrill. Enter your dates to see actual rain days against this normal for free. The full PDF ($99) adds the daily record, a month-by-month comparison and a method statement you can attach to a schedule update or claim.

Check rain days near Merrill

What the weather delay claim report includes

Nearby

Merrill is in Lincoln County, which averages 73 rain days a year across the county. Merrill gets 2 fewer rain days a year than that county-wide average.

The nearest larger city, Appleton (90 mi away), averages 70 rain days a year: Merrill gets 1 more.

Closest other areas in Wisconsin:

All Wisconsin cities and counties

Related guides

Method and source

A rain day is a day with at least 0.10 in (2.54 mm) in PRISM's daily estimate, which covers the 24 hours ending 12:00 UTC. Heavy days use 0.50 in. Normals are 1991-2020 averages. Records run from 1981 to the last complete month. Figures are for the 4 km cell containing the Census point for Merrill (45.180635, -89.700339). Data through 2026-11-24; page updated 2026-11-25. How we count rain days.

Source: PRISM Group, Oregon State University, https://prism.oregonstate.edu. These are gridded estimates, not gauge readings; conditions at a particular site can differ.