Rain days in Tool, Texas
Tool averages 65 rain days a year, counting days with at least 0.10 in of precipitation in the PRISM 4 km grid cell that contains it (1991-2020 normals). May is the wettest month at 7.0 rain days and August the driest at 4.0. That is 9 more than the median Texas location (56).
Quick answers
How many rain days does Tool get a year?
About 65: that many days in a normal year bring 0.10 in or more of rain or melted snow. That makes Tool the 206th wettest of 784 Texas cities and towns.
What is the wettest month in Tool?
May, with 7.0 rain days in a normal year. To cover 9 years in 10, plan for 14.
What is the driest month?
August, with 4.0 rain days (plan for 8).
How many heavy-rain days does Tool get?
28 a year with 0.50 in or more, most often in May (3.0).
Why these counts are lower than some weather sites': a rain day here means 0.10 in or more. Counts based on 0.01 in (NOAA's "days with precipitation") or 0.04 in (WeatherSpark) also include drizzle and trace days.
Rain days by month
The wettest three months are April-June, with 19.5 rain days combined; the driest are July-September, with 12.3. May is also the least predictable month, with the widest gap between its average and its plan-for number. The most rain days in a single month since 1981 was 19, in May 2015.
| Month | Normal rain days | Plan for 9 of 10 yrs |
Heavy days ≥ 0.50 in |
Precip (in) | Record (year) |
|---|---|---|---|---|---|
| January | 5.3 | 10 | 2.1 | 3.33 | 11 (1995) |
| February | 5.6 | 9 | 2.1 | 3.40 | 10 (2001) |
| March | 6.2 | 9 | 2.6 | 4.11 | 11 (2001) |
| April | 6.0 | 9 | 2.8 | 3.86 | 11 (2023) |
| May | 7.0 | 14 | 3.0 | 4.48 | 19 (2015) |
| June | 6.5 | 11 | 2.6 | 4.13 | 13 (2007) |
| July | 4.1 | 7 | 1.5 | 2.14 | 10 (2007) |
| August | 4.0 | 8 | 1.5 | 2.47 | 12 (1996) |
| September | 4.2 | 8 | 1.7 | 3.03 | 10 (2018) |
| October | 5.6 | 10 | 3.0 | 5.20 | 13 (2009) |
| November | 5.1 | 8 | 2.3 | 3.36 | 13 (2015) |
| December | 5.4 | 8 | 2.3 | 3.93 | 15 (1991) |
| Year | 65.1 | 27.5 | 43.43 |
Rain day: at least 0.10 in. Plan for: the 90th percentile of 1991-2020 yearly counts, rounded up to a whole day. Record: 1981 to date.
The last 12 months vs normal
From November 2025 through October 2026, Tool had 50 rain days against a normal of 65: a dry stretch, 15 days below normal. 4 of 12 months came in above normal and 8 below. The biggest departure was February 2026, with 1 rain days against a normal of 5.6. Precipitation totaled 31.86 in against 43.44 in normally.
| Month | Rain days | Normal | Difference | Precip (in) | Normal (in) |
|---|---|---|---|---|---|
| Nov 2025 | 4 | 5.1 | -1.1 | 3.64 | 3.36 |
| Dec 2025 | 2 | 5.4 | -3.4 | 0.53 | 3.93 |
| Jan 2026 | 3 | 5.3 | -2.3 | 2.55 | 3.33 |
| Feb 2026 | 1 | 5.6 | -4.6 | 1.18 | 3.40 |
| Mar 2026 | 4 | 6.2 | -2.2 | 2.13 | 4.11 |
| Apr 2026 | 9 | 6.0 | +3.0 | 5.51 | 3.86 |
| May 2026 | 8 | 7.0 | +1.0 | 2.76 | 4.48 |
| Jun 2026 | 7 | 6.5 | +0.5 | 2.12 | 4.13 |
| Jul 2026 | 6 | 4.1 | +1.9 | 4.88 | 2.14 |
| Aug 2026 | 0 | 4.0 | -4.0 | 0.03 | 2.47 |
| Sep 2026 | 2 | 4.2 | -2.2 | 1.28 | 3.03 |
| Oct 2026 | 4 | 5.6 | -1.6 | 5.25 | 5.20 |
Tool rain days month by month
Against the median Texas location, Tool gets more rain days in January, February, March, April, May, June, October, November and December and fewer in September, by half a day or more; other months are within half a day.
Rain days in January
Tool averages 5.3 rain days in January, 2.1 of them heavy, with 3.33 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 11 (1995). That is 1.2 more than the median Texas location (4.1). January 2026 had 3, 2.3 below normal.
Rain days in February
Tool averages 5.6 rain days in February, 2.1 of them heavy, with 3.40 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 10 (2001). That is 1.5 more than the median Texas location (4.1). February 2026 had 1, 4.6 below normal.
Rain days in March
Tool averages 6.2 rain days in March, 2.6 of them heavy, with 4.11 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 11 (2001). That is 1.3 more than the median Texas location (4.9). March 2026 had 4, 2.2 below normal.
Rain days in April
Tool averages 6.0 rain days in April, 2.8 of them heavy, with 3.86 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 11 (2023). That is 1.6 more than the median Texas location (4.4). April 2026 had 9, 3.0 above normal.
Rain days in May
Tool averages 7.0 rain days in May, 3.0 of them heavy, with 4.48 in of precipitation. Plan for 14 to cover 9 years in 10; the record is 19 (2015). That is 1.1 more than the median Texas location (5.9). May 2026 had 8, 1.0 above normal.
Rain days in June
Tool averages 6.5 rain days in June, 2.6 of them heavy, with 4.13 in of precipitation. Plan for 11 to cover 9 years in 10; the record is 13 (2007). That is 0.9 more than the median Texas location (5.6). June 2026 had 7, 0.5 above normal.
Rain days in July
Tool averages 4.1 rain days in July, 1.5 of them heavy, with 2.14 in of precipitation. Plan for 7 to cover 9 years in 10; the record is 10 (2007). July 2026 had 6, 1.9 above normal.
Rain days in August
Tool averages 4.0 rain days in August, 1.5 of them heavy, with 2.47 in of precipitation. Plan for 8 to cover 9 years in 10; the record is 12 (1996). August 2026 had 0, 4.0 below normal.
Rain days in September
Tool averages 4.2 rain days in September, 1.7 of them heavy, with 3.03 in of precipitation. Plan for 8 to cover 9 years in 10; the record is 10 (2018). That is 0.5 fewer than the median Texas location (4.7). September 2026 had 2, 2.2 below normal.
Rain days in October
Tool averages 5.6 rain days in October, 3.0 of them heavy, with 5.20 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 13 (2009). That is 0.7 more than the median Texas location (4.9). October 2026 had 4, 1.6 below normal.
Rain days in November
Tool averages 5.1 rain days in November, 2.3 of them heavy, with 3.36 in of precipitation. Plan for 8 to cover 9 years in 10; the record is 13 (2015). That is 0.8 more than the median Texas location (4.3). November 2025 had 4, 1.1 below normal.
Rain days in December
Tool averages 5.4 rain days in December, 2.3 of them heavy, with 3.93 in of precipitation. Plan for 8 to cover 9 years in 10; the record is 15 (1991). That is 1.3 more than the median Texas location (4.1). December 2025 had 2, 3.4 below normal.
Using these numbers in a construction schedule
For Tool, the normal column is the expected count: 65 days over a full year, 37 of them from April through October. Put those days in the schedule as non-work days or float before the job starts, not after it slips.
Average or plan-for? An average is exceeded about half the time. If May work has no float, carry 14 weather days for it rather than 7.0: Tool had that many or fewer in 9 of 10 years from 1991 to 2020. Use the normals across a long job and the plan-for figure only for months on the critical path.
Heavy days. Tool averages 28 days a year with 0.50 in or more, most often in May (3.0). Those are the days most likely to stop earthwork, paving and concrete outright.
Claiming time for abnormal weather. Under AIA A201-2017 §15.1.6.2, a claim for extra time because of adverse weather has to show the conditions were abnormal for the period, could not have been reasonably anticipated, and had an adverse effect on the scheduled work. The normals above show what could be anticipated in Tool; the claim also needs the day-by-day record for your site and dates.
Price a rain-day report for a site in Tool. Enter your dates to see actual rain days against this normal for free. The full PDF ($99) adds the daily record, a month-by-month comparison and a method statement you can attach to a schedule update or claim.
Check rain days near ToolNearby
Tool is in Henderson County, which averages 65 rain days a year across the county. The two numbers are close but measure different things: the county figure averages all 132 of the county's grid cells, while Tool's is the single 4 km cell at its Census point. A site elsewhere in Henderson County can differ from both.
The nearest larger city, Waxahachie (40 mi away), averages 57 rain days a year: Tool gets 8 more.
Closest other areas in Texas:
- Seven Points, Texas: 65 rain days / yr, 3 mi
- Gun Barrel City, Texas: 66 rain days / yr, 4 mi
- Mabank, Texas: 66 rain days / yr, 7 mi
- Eustace, Texas: 66 rain days / yr, 9 mi
- Kerens, Texas: 62 rain days / yr, 11 mi
- Kemp, Texas: 64 rain days / yr, 11 mi
- Malakoff, Texas: 65 rain days / yr, 12 mi
- Rice, Texas: 62 rain days / yr, 19 mi
Related guides
- AIA A201 Weather Delay Claims (ยง15.1.6.2): The Three Tests, With Real Numbers
- How Many Weather Days to Put in a Construction Schedule (Normal vs Plan-For)
- How to Document Weather Delays on a Construction Project (Checklist + Daily Log)
Method and source
A rain day is a day with at least 0.10 in (2.54 mm) in PRISM's daily estimate, which covers the 24 hours ending 12:00 UTC. Heavy days use 0.50 in. Normals are 1991-2020 averages. Records run from 1981 to the last complete month. Figures are for the 4 km cell containing the Census point for Tool (32.280299, -96.17286). Data through 2026-11-24; page updated 2026-11-25. How we count rain days.
Source: PRISM Group, Oregon State University, https://prism.oregonstate.edu. These are gridded estimates, not gauge readings; conditions at a particular site can differ.