RainDayRecord

Rain days in Milam County, Texas

Milam County averages 57 rain days a year, counting days with at least 0.10 in of precipitation, averaged over the 148 PRISM 4 km grid cells inside the county (1991-2020 normals). May is the wettest month at 6.1 rain days and July the driest at 3.5. That is close to the Texas median of 56.

Quick answers

How many rain days does Milam County get a year?

About 57: that many days in a normal year bring 0.10 in or more of rain or melted snow. That makes Milam County the 83rd wettest of 254 Texas's counties, against a county average of 52.

What is the wettest month in Milam County?

May, with 6.1 rain days in a normal year. To cover 9 years in 10, plan for 10.

What is the driest month?

July, with 3.5 rain days (plan for 7).

How many heavy-rain days does Milam County get?

24 a year with 0.50 in or more, most often in May (3.0).

Why these counts are lower than some weather sites': a rain day here means 0.10 in or more. Counts based on 0.01 in (NOAA's "days with precipitation") or 0.04 in (WeatherSpark) also include drizzle and trace days.

Rain days by month

The wettest three months are March-May, with 16.1 rain days combined; the driest are July-September, with 11.9. January swings the most from year to year: it averages 4.9 rain days, but covering 9 years in 10 takes 10. The most rain days in a single month since 1981 was 15.4, in October 1984.

0510JanFebMarAprMayJunJulAugSepOctNovDec
Month Normal rain days Plan for
9 of 10 yrs
Heavy days
≥ 0.50 in
Precip (in) Record (year)
January 4.9 10 1.9 2.99 12.5 (1991)
February 4.3 8 1.5 2.37 10.1 (1997)
March 5.4 8 1.9 3.18 11.5 (2001)
April 4.6 8 1.9 2.90 9.6 (2016)
May 6.1 10 3.0 4.66 15 (2015)
June 5.4 9 2.2 3.41 14 (1981)
July 3.5 7 1.2 1.94 11.2 (2007)
August 3.5 7 1.5 2.47 11.8 (1996)
September 4.9 10 1.9 3.09 12.8 (2018)
October 5.2 10 2.4 4.31 15.4 (1984)
November 4.7 8 2.2 3.12 12.9 (2000)
December 4.9 8 2.1 3.31 12.8 (1991)
Year 57.4 23.8 37.75

Rain day: at least 0.10 in. Plan for: the 90th percentile of 1991-2020 yearly counts, rounded up to a whole day. Record: 1981 to date.

The last 12 months vs normal

From November 2025 through October 2026, Milam County had 38.1 rain days against a normal of 57.4: a dry stretch, 19.3 days below normal. 3 of 12 months came in above normal and 9 below. The biggest departure was December 2025, with 0.8 rain days against a normal of 4.9. Precipitation totaled 32.84 in against 37.75 in normally.

MonthRain daysNormalDifferencePrecip (in)Normal (in)
Nov 2025 2.2 4.7 -2.5 1.50 3.12
Dec 2025 0.8 4.9 -4.1 0.36 3.31
Jan 2026 2.1 4.9 -2.8 2.24 2.99
Feb 2026 1 4.3 -3.3 0.72 2.37
Mar 2026 2.8 5.4 -2.6 1.12 3.18
Apr 2026 6.8 4.6 +2.2 5.02 2.90
May 2026 7.8 6.1 +1.7 7.87 4.66
Jun 2026 7.7 5.4 +2.3 7.57 3.41
Jul 2026 2.7 3.5 -0.8 4.48 1.94
Aug 2026 0.5 3.5 -3.0 0.17 2.47
Sep 2026 1.4 4.9 -3.5 0.47 3.09
Oct 2026 2.3 5.2 -2.9 1.32 4.31

Milam County rain days month by month

Against the median Texas location, Milam County gets more rain days in January, March and December and fewer in July and August, by half a day or more; other months are within half a day.

Rain days in January

Milam County averages 4.9 rain days in January, 1.9 of them heavy, with 2.99 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 12.5 (1991). That is 0.8 more than the median Texas location (4.1). January 2026 had 2.1, 2.8 below normal.

Rain days in February

Milam County averages 4.3 rain days in February, 1.5 of them heavy, with 2.37 in of precipitation. Plan for 8 to cover 9 years in 10; the record is 10.1 (1997). February 2026 had 1, 3.3 below normal.

Rain days in March

Milam County averages 5.4 rain days in March, 1.9 of them heavy, with 3.18 in of precipitation. Plan for 8 to cover 9 years in 10; the record is 11.5 (2001). That is 0.5 more than the median Texas location (4.9). March 2026 had 2.8, 2.6 below normal.

Rain days in April

Milam County averages 4.6 rain days in April, 1.9 of them heavy, with 2.90 in of precipitation. Plan for 8 to cover 9 years in 10; the record is 9.6 (2016). April 2026 had 6.8, 2.2 above normal.

Rain days in May

Milam County averages 6.1 rain days in May, 3.0 of them heavy, with 4.66 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 15 (2015). May 2026 had 7.8, 1.7 above normal.

Rain days in June

Milam County averages 5.4 rain days in June, 2.2 of them heavy, with 3.41 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 14 (1981). June 2026 had 7.7, 2.3 above normal.

Rain days in July

Milam County averages 3.5 rain days in July, 1.2 of them heavy, with 1.94 in of precipitation. Plan for 7 to cover 9 years in 10; the record is 11.2 (2007). That is 0.5 fewer than the median Texas location (4.0). July 2026 had 2.7, 0.8 below normal.

Rain days in August

Milam County averages 3.5 rain days in August, 1.5 of them heavy, with 2.47 in of precipitation. Plan for 7 to cover 9 years in 10; the record is 11.8 (1996). That is 0.8 fewer than the median Texas location (4.2). August 2026 had 0.5, 3.0 below normal.

Rain days in September

Milam County averages 4.9 rain days in September, 1.9 of them heavy, with 3.09 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 12.8 (2018). September 2026 had 1.4, 3.5 below normal.

Rain days in October

Milam County averages 5.2 rain days in October, 2.4 of them heavy, with 4.31 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 15.4 (1984). October 2026 had 2.3, 2.9 below normal.

Rain days in November

Milam County averages 4.7 rain days in November, 2.2 of them heavy, with 3.12 in of precipitation. Plan for 8 to cover 9 years in 10; the record is 12.9 (2000). November 2025 had 2.2, 2.5 below normal.

Rain days in December

Milam County averages 4.9 rain days in December, 2.1 of them heavy, with 3.31 in of precipitation. Plan for 8 to cover 9 years in 10; the record is 12.8 (1991). That is 0.8 more than the median Texas location (4.1). December 2025 had 0.8, 4.1 below normal.

Using these numbers in a construction schedule

For Milam County, the normal column is the expected count: 57 days over a full year, 33 of them from April through October. Put those days in the schedule as non-work days or float before the job starts, not after it slips.

Average or plan-for? An average is exceeded about half the time. If May work has no float, carry 10 weather days for it rather than 6.1: Milam County had that many or fewer in 9 of 10 years from 1991 to 2020. Use the normals across a long job and the plan-for figure only for months on the critical path.

Heavy days. Milam County averages 24 days a year with 0.50 in or more, most often in May (3.0). Those are the days most likely to stop earthwork, paving and concrete outright.

Claiming time for abnormal weather. Under AIA A201-2017 §15.1.6.2, a claim for extra time because of adverse weather has to show the conditions were abnormal for the period, could not have been reasonably anticipated, and had an adverse effect on the scheduled work. The normals above show what could be anticipated in Milam County; the claim also needs the day-by-day record for your site and dates.

Price a rain-day report for a site in Milam County. Enter your site's address and dates to see, for free, its actual rain days against the normal for the 4 km grid cell at that address. A single site can differ from the county-wide average above. The full PDF ($99) adds the daily record, a month-by-month comparison and a method statement you can attach to a schedule update or claim.

Check rain days at your site

What the weather delay claim report includes

Nearby

Largest places in Milam County:

Closest other areas in Texas:

All Texas cities and counties

Related guides

Method and source

A rain day is a day with at least 0.10 in (2.54 mm) in PRISM's daily estimate, which covers the 24 hours ending 12:00 UTC. Heavy days use 0.50 in. Normals are 1991-2020 averages. Records run from 1981 to the last complete month. County figures average the 148 grid cells whose centers fall inside the county boundary. Data through 2026-11-24; page updated 2026-11-25. How we count rain days.

Source: PRISM Group, Oregon State University, https://prism.oregonstate.edu. These are gridded estimates, not gauge readings; conditions at a particular site can differ.