Rain days in Tega Cay, South Carolina
Tega Cay averages 73 rain days a year, counting days with at least 0.10 in of precipitation in the PRISM 4 km grid cell that contains it (1991-2020 normals). June is the wettest month at 7.0 rain days and October the driest at 4.5. That is 8 fewer than the median South Carolina location (81).
Quick answers
How many rain days does Tega Cay get a year?
About 73: that many days in a normal year bring 0.10 in or more of rain or melted snow. That makes Tega Cay the 149th wettest of 150 South Carolina cities and towns.
What is the wettest month in Tega Cay?
June, with 7.0 rain days in a normal year. To cover 9 years in 10, plan for 11.
What is the driest month?
October, with 4.5 rain days (plan for 7).
How many heavy-rain days does Tega Cay get?
30 a year with 0.50 in or more, most often in June (3.1).
Why these counts are lower than some weather sites': a rain day here means 0.10 in or more. Counts based on 0.01 in (NOAA's "days with precipitation") or 0.04 in (WeatherSpark) also include drizzle and trace days.
Rain days by month
The wettest three months are June-August, with 20.5 rain days combined; the driest are September-November, with 14.8. June is also the least predictable month, with the widest gap between its average and its plan-for number. The most rain days in a single month since 1981 was 17, in July 2013.
| Month | Normal rain days | Plan for 9 of 10 yrs |
Heavy days ≥ 0.50 in |
Precip (in) | Record (year) |
|---|---|---|---|---|---|
| January | 6.6 | 9 | 2.8 | 3.81 | 11 (2006) |
| February | 5.9 | 8 | 2.4 | 3.28 | 13 (2021) |
| March | 6.8 | 9 | 2.8 | 4.28 | 12 (1989) |
| April | 6.1 | 10 | 2.4 | 3.77 | 10 (2003) |
| May | 6.1 | 10 | 2.3 | 3.47 | 12 (2016) |
| June | 7.0 | 11 | 3.1 | 4.37 | 14 (1995) |
| July | 6.8 | 10 | 2.1 | 3.88 | 17 (2013) |
| August | 6.7 | 9 | 2.8 | 4.26 | 13 (1986) |
| September | 5.1 | 8 | 2.5 | 3.88 | 11 (2015) |
| October | 4.5 | 7 | 1.8 | 3.26 | 8 (2019) |
| November | 5.2 | 8 | 2.4 | 3.45 | 10 (2022) |
| December | 6.6 | 10 | 2.8 | 3.99 | 12 (2018) |
| Year | 73.3 | 30.2 | 45.70 |
Rain day: at least 0.10 in. Plan for: the 90th percentile of 1991-2020 yearly counts, rounded up to a whole day. Record: 1981 to date.
The last 12 months vs normal
From November 2025 through October 2026, Tega Cay had 63 rain days against a normal of 73.4: a dry stretch, 10.4 days below normal. 3 of 12 months came in above normal and 9 below. The biggest departure was August 2026, with 11 rain days against a normal of 6.7. Precipitation totaled 35.94 in against 45.70 in normally.
| Month | Rain days | Normal | Difference | Precip (in) | Normal (in) |
|---|---|---|---|---|---|
| Nov 2025 | 3 | 5.2 | -2.2 | 0.89 | 3.45 |
| Dec 2025 | 4 | 6.6 | -2.6 | 2.27 | 3.99 |
| Jan 2026 | 3 | 6.6 | -3.6 | 1.00 | 3.81 |
| Feb 2026 | 6 | 5.9 | +0.1 | 3.32 | 3.28 |
| Mar 2026 | 4 | 6.8 | -2.8 | 1.89 | 4.28 |
| Apr 2026 | 4 | 6.1 | -2.1 | 1.35 | 3.77 |
| May 2026 | 10 | 6.1 | +3.9 | 7.76 | 3.47 |
| Jun 2026 | 6 | 7.0 | -1.0 | 4.41 | 4.37 |
| Jul 2026 | 4 | 6.8 | -2.8 | 3.75 | 3.88 |
| Aug 2026 | 11 | 6.7 | +4.3 | 3.63 | 4.26 |
| Sep 2026 | 5 | 5.1 | -0.1 | 2.43 | 3.88 |
| Oct 2026 | 3 | 4.5 | -1.5 | 3.24 | 3.26 |
Tega Cay rain days month by month
Against the median South Carolina location, Tega Cay gets fewer in June, July, August and September, by half a day or more; other months are within half a day.
Rain days in January
Tega Cay averages 6.6 rain days in January, 2.8 of them heavy, with 3.81 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 11 (2006). January 2026 had 3, 3.6 below normal.
Rain days in February
Tega Cay averages 5.9 rain days in February, 2.4 of them heavy, with 3.28 in of precipitation. Plan for 8 to cover 9 years in 10; the record is 13 (2021). February 2026 had 6, right on normal.
Rain days in March
Tega Cay averages 6.8 rain days in March, 2.8 of them heavy, with 4.28 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 12 (1989). March 2026 had 4, 2.8 below normal.
Rain days in April
Tega Cay averages 6.1 rain days in April, 2.4 of them heavy, with 3.77 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 10 (2003). April 2026 had 4, 2.1 below normal.
Rain days in May
Tega Cay averages 6.1 rain days in May, 2.3 of them heavy, with 3.47 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 12 (2016). May 2026 had 10, 3.9 above normal.
Rain days in June
Tega Cay averages 7.0 rain days in June, 3.1 of them heavy, with 4.37 in of precipitation. Plan for 11 to cover 9 years in 10; the record is 14 (1995). That is 1.6 fewer than the median South Carolina location (8.6). June 2026 had 6, 1.0 below normal.
Rain days in July
Tega Cay averages 6.8 rain days in July, 2.1 of them heavy, with 3.88 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 17 (2013). That is 2.2 fewer than the median South Carolina location (9.0). July 2026 had 4, 2.8 below normal.
Rain days in August
Tega Cay averages 6.7 rain days in August, 2.8 of them heavy, with 4.26 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 13 (1986). That is 2.2 fewer than the median South Carolina location (8.9). August 2026 had 11, 4.3 above normal.
Rain days in September
Tega Cay averages 5.1 rain days in September, 2.5 of them heavy, with 3.88 in of precipitation. Plan for 8 to cover 9 years in 10; the record is 11 (2015). That is 1.1 fewer than the median South Carolina location (6.2). September 2026 had 5, right on normal.
Rain days in October
Tega Cay averages 4.5 rain days in October, 1.8 of them heavy, with 3.26 in of precipitation. Plan for 7 to cover 9 years in 10; the record is 8 (2019). October 2026 had 3, 1.5 below normal.
Rain days in November
Tega Cay averages 5.2 rain days in November, 2.4 of them heavy, with 3.45 in of precipitation. Plan for 8 to cover 9 years in 10; the record is 10 (2022). November 2025 had 3, 2.2 below normal.
Rain days in December
Tega Cay averages 6.6 rain days in December, 2.8 of them heavy, with 3.99 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 12 (2018). December 2025 had 4, 2.6 below normal.
Using these numbers in a construction schedule
For Tega Cay, the normal column is the expected count: 73 days over a full year, 42 of them from April through October. Put those days in the schedule as non-work days or float before the job starts, not after it slips.
Average or plan-for? An average is exceeded about half the time. If June work has no float, carry 11 weather days for it rather than 7.0: Tega Cay had that many or fewer in 9 of 10 years from 1991 to 2020. Use the normals across a long job and the plan-for figure only for months on the critical path.
Heavy days. Tega Cay averages 30 days a year with 0.50 in or more, most often in June (3.1). Those are the days most likely to stop earthwork, paving and concrete outright.
Claiming time for abnormal weather. Under AIA A201-2017 §15.1.6.2, a claim for extra time because of adverse weather has to show the conditions were abnormal for the period, could not have been reasonably anticipated, and had an adverse effect on the scheduled work. The normals above show what could be anticipated in Tega Cay; the claim also needs the day-by-day record for your site and dates.
Price a rain-day report for a site in Tega Cay. Enter your dates to see actual rain days against this normal for free. The full PDF ($99) adds the daily record, a month-by-month comparison and a method statement you can attach to a schedule update or claim.
Check rain days near Tega CayNearby
Tega Cay is in York County, which averages 78 rain days a year across the county. Tega Cay gets 5 fewer rain days a year than that county-wide average.
The nearest larger city, Rock Hill (7 mi away), averages 76 rain days a year: Tega Cay gets 2 fewer.
Closest other areas in South Carolina:
- Fort Mill, South Carolina: 76 rain days / yr, 5 mi
- Rock Hill, South Carolina: 76 rain days / yr, 7 mi
- York County, South Carolina: 78 rain days / yr, 11 mi
- Clover, South Carolina: 81 rain days / yr, 13 mi
- York, South Carolina: 79 rain days / yr, 13 mi
- Van Wyck, South Carolina: 78 rain days / yr, 16 mi
- Fort Lawn, South Carolina: 80 rain days / yr, 24 mi
- Lancaster, South Carolina: 80 rain days / yr, 25 mi
All South Carolina cities and counties
Related guides
- AIA A201 Weather Delay Claims (ยง15.1.6.2): The Three Tests, With Real Numbers
- How Many Weather Days to Put in a Construction Schedule (Normal vs Plan-For)
- How to Document Weather Delays on a Construction Project (Checklist + Daily Log)
Method and source
A rain day is a day with at least 0.10 in (2.54 mm) in PRISM's daily estimate, which covers the 24 hours ending 12:00 UTC. Heavy days use 0.50 in. Normals are 1991-2020 averages. Records run from 1981 to the last complete month. Figures are for the 4 km cell containing the Census point for Tega Cay (35.039343, -81.01061). Data through 2026-11-24; page updated 2026-11-25. How we count rain days.
Source: PRISM Group, Oregon State University, https://prism.oregonstate.edu. These are gridded estimates, not gauge readings; conditions at a particular site can differ.