RainDayRecord

Rain days in Pine Ridge, South Carolina

Pine Ridge averages 78 rain days a year, counting days with at least 0.10 in of precipitation in the PRISM 4 km grid cell that contains it (1991-2020 normals). July is the wettest month at 8.7 rain days and October the driest at 4.6. That is 3 fewer than the median South Carolina location (81).

Quick answers

How many rain days does Pine Ridge get a year?

About 78: that many days in a normal year bring 0.10 in or more of rain or melted snow. That makes Pine Ridge the 112th wettest of 150 South Carolina cities and towns.

What is the wettest month in Pine Ridge?

July, with 8.7 rain days in a normal year. To cover 9 years in 10, plan for 14.

What is the driest month?

October, with 4.6 rain days (plan for 8).

How many heavy-rain days does Pine Ridge get?

31 a year with 0.50 in or more, most often in June (3.4).

Why these counts are lower than some weather sites': a rain day here means 0.10 in or more. Counts based on 0.01 in (NOAA's "days with precipitation") or 0.04 in (WeatherSpark) also include drizzle and trace days.

Rain days by month

The wettest three months are June-August, with 25.7 rain days combined; the driest are September-November, with 15.4. July is also the least predictable month, with the widest gap between its average and its plan-for number. The most rain days in a single month since 1981 was 18, in July 1984.

051015JanFebMarAprMayJunJulAugSepOctNovDec
Month Normal rain days Plan for
9 of 10 yrs
Heavy days
≥ 0.50 in
Precip (in) Record (year)
January 6.5 10 2.8 3.71 11 (2000)
February 6.1 8 2.4 3.42 11 (2021)
March 6.1 9 2.7 3.90 11 (2003)
April 5.7 8 1.9 2.91 11 (1989)
May 6.2 9 2.0 3.34 11 (2009)
June 8.3 13 3.4 5.09 17 (2004)
July 8.7 14 3.3 4.86 18 (1984)
August 8.7 12 3.2 5.05 15 (2025)
September 5.9 9 2.7 4.10 12 (2000)
October 4.6 8 2.0 3.31 10 (1994)
November 4.9 8 2.2 2.94 11 (1992)
December 6.3 10 2.6 3.80 12 (2018)
Year 77.9 31.1 46.43

Rain day: at least 0.10 in. Plan for: the 90th percentile of 1991-2020 yearly counts, rounded up to a whole day. Record: 1981 to date.

The last 12 months vs normal

From November 2025 through October 2026, Pine Ridge had 61 rain days against a normal of 78: a dry stretch, 17 days below normal. 2 of 12 months came in above normal and 10 below. The biggest departure was July 2026, with 4 rain days against a normal of 8.7. Precipitation totaled 29.28 in against 46.43 in normally.

MonthRain daysNormalDifferencePrecip (in)Normal (in)
Nov 2025 1 4.9 -3.9 0.22 2.94
Dec 2025 6 6.3 -0.3 2.66 3.80
Jan 2026 5 6.5 -1.5 1.83 3.71
Feb 2026 6 6.1 -0.1 3.19 3.42
Mar 2026 2 6.1 -4.1 0.89 3.90
Apr 2026 3 5.7 -2.7 1.09 2.91
May 2026 10 6.2 +3.8 5.70 3.34
Jun 2026 8 8.3 -0.3 3.55 5.09
Jul 2026 4 8.7 -4.7 1.84 4.86
Aug 2026 6 8.7 -2.7 4.02 5.05
Sep 2026 6 5.9 +0.1 2.35 4.10
Oct 2026 4 4.6 -0.6 1.94 3.31

Pine Ridge rain days month by month

Every month in Pine Ridge is within half a rain day of the median South Carolina location.

Rain days in January

Pine Ridge averages 6.5 rain days in January, 2.8 of them heavy, with 3.71 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 11 (2000). January 2026 had 5, 1.5 below normal.

Rain days in February

Pine Ridge averages 6.1 rain days in February, 2.4 of them heavy, with 3.42 in of precipitation. Plan for 8 to cover 9 years in 10; the record is 11 (2021). February 2026 had 6, right on normal.

Rain days in March

Pine Ridge averages 6.1 rain days in March, 2.7 of them heavy, with 3.90 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 11 (2003). March 2026 had 2, 4.1 below normal.

Rain days in April

Pine Ridge averages 5.7 rain days in April, 1.9 of them heavy, with 2.91 in of precipitation. Plan for 8 to cover 9 years in 10; the record is 11 (1989). April 2026 had 3, 2.7 below normal.

Rain days in May

Pine Ridge averages 6.2 rain days in May, 2.0 of them heavy, with 3.34 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 11 (2009). May 2026 had 10, 3.8 above normal.

Rain days in June

Pine Ridge averages 8.3 rain days in June, 3.4 of them heavy, with 5.09 in of precipitation. Plan for 13 to cover 9 years in 10; the record is 17 (2004). June 2026 had 8, right on normal.

Rain days in July

Pine Ridge averages 8.7 rain days in July, 3.3 of them heavy, with 4.86 in of precipitation. Plan for 14 to cover 9 years in 10; the record is 18 (1984). July 2026 had 4, 4.7 below normal.

Rain days in August

Pine Ridge averages 8.7 rain days in August, 3.2 of them heavy, with 5.05 in of precipitation. Plan for 12 to cover 9 years in 10; the record is 15 (2025). August 2026 had 6, 2.7 below normal.

Rain days in September

Pine Ridge averages 5.9 rain days in September, 2.7 of them heavy, with 4.10 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 12 (2000). September 2026 had 6, right on normal.

Rain days in October

Pine Ridge averages 4.6 rain days in October, 2.0 of them heavy, with 3.31 in of precipitation. Plan for 8 to cover 9 years in 10; the record is 10 (1994). October 2026 had 4, 0.6 below normal.

Rain days in November

Pine Ridge averages 4.9 rain days in November, 2.2 of them heavy, with 2.94 in of precipitation. Plan for 8 to cover 9 years in 10; the record is 11 (1992). November 2025 had 1, 3.9 below normal.

Rain days in December

Pine Ridge averages 6.3 rain days in December, 2.6 of them heavy, with 3.80 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 12 (2018). December 2025 had 6, right on normal.

Using these numbers in a construction schedule

For Pine Ridge, the normal column is the expected count: 78 days over a full year, 48 of them from April through October. Put those days in the schedule as non-work days or float before the job starts, not after it slips.

Average or plan-for? An average is exceeded about half the time. If July work has no float, carry 14 weather days for it rather than 8.7: Pine Ridge had that many or fewer in 9 of 10 years from 1991 to 2020. Use the normals across a long job and the plan-for figure only for months on the critical path.

Heavy days. Pine Ridge averages 31 days a year with 0.50 in or more, most often in June (3.4). Those are the days most likely to stop earthwork, paving and concrete outright.

Claiming time for abnormal weather. Under AIA A201-2017 §15.1.6.2, a claim for extra time because of adverse weather has to show the conditions were abnormal for the period, could not have been reasonably anticipated, and had an adverse effect on the scheduled work. The normals above show what could be anticipated in Pine Ridge; the claim also needs the day-by-day record for your site and dates.

Price a rain-day report for a site in Pine Ridge. Enter your dates to see actual rain days against this normal for free. The full PDF ($99) adds the daily record, a month-by-month comparison and a method statement you can attach to a schedule update or claim.

Check rain days near Pine Ridge

What the weather delay claim report includes

Nearby

Pine Ridge is in Lexington County, which averages 80 rain days a year across the county. Pine Ridge gets 2 fewer rain days a year than that county-wide average.

The nearest larger city, Columbia (15 mi away), averages 79 rain days a year, about the same as Pine Ridge.

Closest other areas in South Carolina:

All South Carolina cities and counties

Related guides

Method and source

A rain day is a day with at least 0.10 in (2.54 mm) in PRISM's daily estimate, which covers the 24 hours ending 12:00 UTC. Heavy days use 0.50 in. Normals are 1991-2020 averages. Records run from 1981 to the last complete month. Figures are for the 4 km cell containing the Census point for Pine Ridge (33.902293, -81.092528). Data through 2026-11-24; page updated 2026-11-25. How we count rain days.

Source: PRISM Group, Oregon State University, https://prism.oregonstate.edu. These are gridded estimates, not gauge readings; conditions at a particular site can differ.