Rain days in Hubbard, Oregon

Hubbard averages 109 rain days a year, counting days with at least 0.10 in of precipitation in the PRISM 4 km grid cell that contains it (1991-2020 normals). December is the wettest month at 15.1 rain days and July the driest at 1.3. That is 5 more than the median Oregon location (103).

Quick answers

How many rain days does Hubbard get a year?

About 109: that many days in a normal year bring 0.10 in or more of rain or melted snow. That makes Hubbard the 60th wettest of 164 Oregon cities and towns.

What is the wettest month in Hubbard?

December, with 15.1 rain days in a normal year. To cover 9 years in 10, plan for 21.

What is the driest month?

July, with 1.3 rain days (plan for 3).

How many heavy-rain days does Hubbard get?

24 a year with 0.50 in or more, most often in December (5.1).

Why these counts are lower than some weather sites': a rain day here means 0.10 in or more. Counts based on 0.01 in (NOAA's "days with precipitation") or 0.04 in (WeatherSpark) also include drizzle and trace days.

Rain days by month

The wettest three months are November-January, with 43.8 rain days combined; the driest are July-September, with 6.5. May swings the most from year to year: it averages 8.1 rain days, but covering 9 years in 10 takes 15. The most rain days in a single month since 1981 was 26, in January 2006.

0510152025JanFebMarAprMayJunJulAugSepOctNovDec
Month Normal rain days Plan for
9 of 10 yrs
Heavy days
≥ 0.50 in
Precip (in) Record (year)
January 14.4 20 4.0 6.29 26 (2006)
February 11.2 17 2.5 4.57 23 (1999)
March 12.9 19 2.6 4.96 22 (2017)
April 11.7 18 1.2 3.56 24 (1993)
May 8.1 15 0.7 2.54 18 (2010)
June 5.3 9 0.4 1.59 11 (2020)
July 1.3 3 0.1 0.40 8 (1983)
August 1.6 4 0.1 0.49 7 (2004)
September 3.6 6 0.9 1.52 10 (2013)
October 9.2 14 2.4 4.00 23 (2016)
November 14.3 21 4.1 6.43 24 (2006)
December 15.1 21 5.1 7.32 26 (1996)
Year 108.7 24.1 43.67

Rain day: at least 0.10 in. Plan for: the 90th percentile of 1991-2020 yearly counts, rounded up to a whole day. Record: 1981 to date.

The last 12 months vs normal

From November 2025 through October 2026, Hubbard had 81 rain days against a normal of 108.7: a dry stretch, 27.7 days below normal. 1 of 12 months came in above normal and 11 below. The biggest departure was March 2026, with 6 rain days against a normal of 12.9. Precipitation totaled 36.48 in against 43.67 in normally.

MonthRain daysNormalDifferencePrecip (in)Normal (in)
Nov 2025 13 14.3 -1.3 5.43 6.43
Dec 2025 14 15.1 -1.1 9.90 7.32
Jan 2026 8 14.4 -6.4 2.58 6.29
Feb 2026 11 11.2 -0.2 4.90 4.57
Mar 2026 6 12.9 -6.9 4.40 4.96
Apr 2026 10 11.7 -1.7 3.25 3.56
May 2026 3 8.1 -5.1 0.71 2.54
Jun 2026 4 5.3 -1.3 1.49 1.59
Jul 2026 0 1.3 -1.3 0.09 0.40
Aug 2026 0 1.6 -1.6 0.05 0.49
Sep 2026 6 3.6 +2.4 1.84 1.52
Oct 2026 6 9.2 -3.2 1.84 4.00

Hubbard rain days month by month

Against the median Oregon location, Hubbard gets more rain days in January, April, May, June, October and November, by half a day or more; other months are within half a day.

Rain days in January

Hubbard averages 14.4 rain days in January, 4.0 of them heavy, with 6.29 in of precipitation. Plan for 20 to cover 9 years in 10; the record is 26 (2006). That is 0.5 more than the median Oregon location (13.9). January 2026 had 8, 6.4 below normal.

Rain days in February

Hubbard averages 11.2 rain days in February, 2.5 of them heavy, with 4.57 in of precipitation. Plan for 17 to cover 9 years in 10; the record is 23 (1999). February 2026 had 11, right on normal.

Rain days in March

Hubbard averages 12.9 rain days in March, 2.6 of them heavy, with 4.96 in of precipitation. Plan for 19 to cover 9 years in 10; the record is 22 (2017). March 2026 had 6, 6.9 below normal.

Rain days in April

Hubbard averages 11.7 rain days in April, 1.2 of them heavy, with 3.56 in of precipitation. Plan for 18 to cover 9 years in 10; the record is 24 (1993). That is 1.1 more than the median Oregon location (10.6). April 2026 had 10, 1.7 below normal.

Rain days in May

Hubbard averages 8.1 rain days in May, 0.7 of them heavy, with 2.54 in of precipitation. Plan for 15 to cover 9 years in 10; the record is 18 (2010). That is 0.8 more than the median Oregon location (7.3). May 2026 had 3, 5.1 below normal.

Rain days in June

Hubbard averages 5.3 rain days in June, 0.4 of them heavy, with 1.59 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 11 (2020). That is 0.6 more than the median Oregon location (4.7). June 2026 had 4, 1.3 below normal.

Rain days in July

Hubbard averages 1.3 rain days in July, 0.1 of them heavy, with 0.40 in of precipitation. Plan for 3 to cover 9 years in 10; the record is 8 (1983). July 2026 had 0, 1.3 below normal.

Rain days in August

Hubbard averages 1.6 rain days in August, 0.1 of them heavy, with 0.49 in of precipitation. Plan for 4 to cover 9 years in 10; the record is 7 (2004). August 2026 had 0, 1.6 below normal.

Rain days in September

Hubbard averages 3.6 rain days in September, 0.9 of them heavy, with 1.52 in of precipitation. Plan for 6 to cover 9 years in 10; the record is 10 (2013). September 2026 had 6, 2.4 above normal.

Rain days in October

Hubbard averages 9.2 rain days in October, 2.4 of them heavy, with 4.00 in of precipitation. Plan for 14 to cover 9 years in 10; the record is 23 (2016). That is 0.8 more than the median Oregon location (8.4). October 2026 had 6, 3.2 below normal.

Rain days in November

Hubbard averages 14.3 rain days in November, 4.1 of them heavy, with 6.43 in of precipitation. Plan for 21 to cover 9 years in 10; the record is 24 (2006). That is 0.6 more than the median Oregon location (13.8). November 2025 had 13, 1.3 below normal.

Rain days in December

Hubbard averages 15.1 rain days in December, 5.1 of them heavy, with 7.32 in of precipitation. Plan for 21 to cover 9 years in 10; the record is 26 (1996). December 2025 had 14, 1.1 below normal.

Using these numbers in a construction schedule

For Hubbard, the normal column is the expected count: 109 days over a full year, 41 of them from April through October. Put those days in the schedule as non-work days or float before the job starts, not after it slips.

Average or plan-for? An average is exceeded about half the time. If December work has no float, carry 21 weather days for it rather than 15.1: Hubbard had that many or fewer in 9 of 10 years from 1991 to 2020. Use the normals across a long job and the plan-for figure only for months on the critical path.

Heavy days. Hubbard averages 24 days a year with 0.50 in or more, most often in December (5.1). Those are the days most likely to stop earthwork, paving and concrete outright.

Claiming time for abnormal weather. Under AIA A201-2017 §15.1.6.2, a claim for extra time because of adverse weather has to show the conditions were abnormal for the period, could not have been reasonably anticipated, and had an adverse effect on the scheduled work. The normals above show what could be anticipated in Hubbard; the claim also needs the day-by-day record for your site and dates.

Price a rain-day report for a site in Hubbard. Enter your dates to see actual rain days against this normal for free. The full PDF ($99) adds the daily record, a month-by-month comparison and a method statement you can attach to a schedule update or claim.

Check rain days near Hubbard

What the weather delay claim report includes

Nearby

Hubbard is in Marion County, which averages 124 rain days a year across the county. Hubbard gets 15 fewer rain days a year than that county-wide average.

The nearest larger city, Tigard (17 mi away), averages 100 rain days a year: Hubbard gets 9 more.

Closest other areas in Oregon:

All Oregon cities and counties

Related guides

Method and source

A rain day is a day with at least 0.10 in (2.54 mm) in PRISM's daily estimate, which covers the 24 hours ending 12:00 UTC. Heavy days use 0.50 in. Normals are 1991-2020 averages. Records run from 1981 to the last complete month. Figures are for the 4 km cell containing the Census point for Hubbard (45.181472, -122.808324). Data through 2026-11-24; page updated 2026-11-25. How we count rain days.

Source: PRISM Group, Oregon State University, https://prism.oregonstate.edu. These are gridded estimates, not gauge readings; conditions at a particular site can differ.