RainDayRecord

Rain days in Cave Junction, Oregon

Cave Junction averages 90 rain days a year, counting days with at least 0.10 in of precipitation in the PRISM 4 km grid cell that contains it (1991-2020 normals). December is the wettest month at 14.1 rain days and July the driest at 0.7. That is 13 fewer than the median Oregon location (103).

Quick answers

How many rain days does Cave Junction get a year?

About 90: that many days in a normal year bring 0.10 in or more of rain or melted snow. That makes Cave Junction the 115th wettest of 164 Oregon cities and towns.

What is the wettest month in Cave Junction?

December, with 14.1 rain days in a normal year. To cover 9 years in 10, plan for 22.

What is the driest month?

July, with 0.7 rain days (plan for 2).

How many heavy-rain days does Cave Junction get?

38 a year with 0.50 in or more, most often in December (7.9).

Why these counts are lower than some weather sites': a rain day here means 0.10 in or more. Counts based on 0.01 in (NOAA's "days with precipitation") or 0.04 in (WeatherSpark) also include drizzle and trace days.

Rain days by month

The wettest three months are November-January, with 39.7 rain days combined; the driest are July-September, with 3.3. January swings the most from year to year: it averages 13.7 rain days, but covering 9 years in 10 takes 22. The most rain days in a single month since 1981 was 28, in March 2011.

0510152025JanFebMarAprMayJunJulAugSepOctNovDec
Month Normal rain days Plan for
9 of 10 yrs
Heavy days
≥ 0.50 in
Precip (in) Record (year)
January 13.7 22 7.3 10.47 25 (1998)
February 11.0 17 5.8 8.37 26 (1998)
March 13.2 19 5.3 7.77 28 (2011)
April 9.7 15 2.5 4.48 22 (2003)
May 5.3 10 1.1 2.10 12 (2005)
June 2.3 5 0.3 0.84 8 (1988)
July 0.7 2 0.1 0.23 4 (1983)
August 0.8 2 0.1 0.24 6 (1990)
September 1.8 4 0.3 0.72 9 (1986)
October 5.6 9 2.1 3.36 20 (2016)
November 11.9 19 5.1 7.75 25 (1984)
December 14.1 22 7.9 11.89 25 (2015)
Year 90.2 37.9 58.21

Rain day: at least 0.10 in. Plan for: the 90th percentile of 1991-2020 yearly counts, rounded up to a whole day. Record: 1981 to date.

The last 12 months vs normal

From November 2025 through October 2026, Cave Junction had 54 rain days against a normal of 90.1: a dry stretch, 36.1 days below normal. 1 of 12 months came in above normal and 11 below. The biggest departure was March 2026, with 3 rain days against a normal of 13.2. Precipitation totaled 35.79 in against 58.22 in normally.

MonthRain daysNormalDifferencePrecip (in)Normal (in)
Nov 2025 8 11.9 -3.9 4.68 7.75
Dec 2025 11 14.1 -3.1 9.47 11.89
Jan 2026 9 13.7 -4.7 5.12 10.47
Feb 2026 8 11.0 -3.0 8.25 8.37
Mar 2026 3 13.2 -10.2 1.27 7.77
Apr 2026 8 9.7 -1.7 3.84 4.48
May 2026 2 5.3 -3.3 0.74 2.10
Jun 2026 1 2.3 -1.3 0.32 0.84
Jul 2026 0 0.7 -0.7 0.00 0.23
Aug 2026 0 0.8 -0.8 0.00 0.24
Sep 2026 2 1.8 +0.2 1.44 0.72
Oct 2026 2 5.6 -3.6 0.66 3.36

Cave Junction rain days month by month

Against the median Oregon location, Cave Junction gets more rain days in March and fewer in April, May, June, July, August, September, October, November and December, by half a day or more; other months are within half a day.

Rain days in January

Cave Junction averages 13.7 rain days in January, 7.3 of them heavy, with 10.47 in of precipitation. Plan for 22 to cover 9 years in 10; the record is 25 (1998). January 2026 had 9, 4.7 below normal.

Rain days in February

Cave Junction averages 11.0 rain days in February, 5.8 of them heavy, with 8.37 in of precipitation. Plan for 17 to cover 9 years in 10; the record is 26 (1998). February 2026 had 8, 3.0 below normal.

Rain days in March

Cave Junction averages 13.2 rain days in March, 5.3 of them heavy, with 7.77 in of precipitation. Plan for 19 to cover 9 years in 10; the record is 28 (2011). That is 0.5 more than the median Oregon location (12.7). March 2026 had 3, 10.2 below normal.

Rain days in April

Cave Junction averages 9.7 rain days in April, 2.5 of them heavy, with 4.48 in of precipitation. Plan for 15 to cover 9 years in 10; the record is 22 (2003). That is 0.9 fewer than the median Oregon location (10.6). April 2026 had 8, 1.7 below normal.

Rain days in May

Cave Junction averages 5.3 rain days in May, 1.1 of them heavy, with 2.10 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 12 (2005). That is 2.0 fewer than the median Oregon location (7.3). May 2026 had 2, 3.3 below normal.

Rain days in June

Cave Junction averages 2.3 rain days in June, 0.3 of them heavy, with 0.84 in of precipitation. Plan for 5 to cover 9 years in 10; the record is 8 (1988). That is 2.4 fewer than the median Oregon location (4.7). June 2026 had 1, 1.3 below normal.

Rain days in July

Cave Junction averages 0.7 rain days in July, 0.1 of them heavy, with 0.23 in of precipitation. Plan for 2 to cover 9 years in 10; the record is 4 (1983). That is 0.5 fewer than the median Oregon location (1.2). July 2026 had 0, 0.7 below normal.

Rain days in August

Cave Junction averages 0.8 rain days in August, 0.1 of them heavy, with 0.24 in of precipitation. Plan for 2 to cover 9 years in 10; the record is 6 (1990). That is 0.6 fewer than the median Oregon location (1.4). August 2026 had 0, 0.8 below normal.

Rain days in September

Cave Junction averages 1.8 rain days in September, 0.3 of them heavy, with 0.72 in of precipitation. Plan for 4 to cover 9 years in 10; the record is 9 (1986). That is 1.7 fewer than the median Oregon location (3.5). September 2026 had 2, right on normal.

Rain days in October

Cave Junction averages 5.6 rain days in October, 2.1 of them heavy, with 3.36 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 20 (2016). That is 2.8 fewer than the median Oregon location (8.4). October 2026 had 2, 3.6 below normal.

Rain days in November

Cave Junction averages 11.9 rain days in November, 5.1 of them heavy, with 7.75 in of precipitation. Plan for 19 to cover 9 years in 10; the record is 25 (1984). That is 1.8 fewer than the median Oregon location (13.8). November 2025 had 8, 3.9 below normal.

Rain days in December

Cave Junction averages 14.1 rain days in December, 7.9 of them heavy, with 11.89 in of precipitation. Plan for 22 to cover 9 years in 10; the record is 25 (2015). That is 0.7 fewer than the median Oregon location (14.8). December 2025 had 11, 3.1 below normal.

Using these numbers in a construction schedule

For Cave Junction, the normal column is the expected count: 90 days over a full year, 26 of them from April through October. Put those days in the schedule as non-work days or float before the job starts, not after it slips.

Average or plan-for? An average is exceeded about half the time. If December work has no float, carry 22 weather days for it rather than 14.1: Cave Junction had that many or fewer in 9 of 10 years from 1991 to 2020. Use the normals across a long job and the plan-for figure only for months on the critical path.

Heavy days. Cave Junction averages 38 days a year with 0.50 in or more, most often in December (7.9). Those are the days most likely to stop earthwork, paving and concrete outright.

Claiming time for abnormal weather. Under AIA A201-2017 §15.1.6.2, a claim for extra time because of adverse weather has to show the conditions were abnormal for the period, could not have been reasonably anticipated, and had an adverse effect on the scheduled work. The normals above show what could be anticipated in Cave Junction; the claim also needs the day-by-day record for your site and dates.

Price a rain-day report for a site in Cave Junction. Enter your dates to see actual rain days against this normal for free. The full PDF ($99) adds the daily record, a month-by-month comparison and a method statement you can attach to a schedule update or claim.

Check rain days near Cave Junction

What the weather delay claim report includes

Nearby

Cave Junction is in Josephine County, which averages 95 rain days a year across the county. Cave Junction gets 5 fewer rain days a year than that county-wide average.

The nearest larger city, Medford (42 mi away), averages 58 rain days a year: Cave Junction gets 32 more.

Closest other areas in Oregon:

All Oregon cities and counties

Related guides

Method and source

A rain day is a day with at least 0.10 in (2.54 mm) in PRISM's daily estimate, which covers the 24 hours ending 12:00 UTC. Heavy days use 0.50 in. Normals are 1991-2020 averages. Records run from 1981 to the last complete month. Figures are for the 4 km cell containing the Census point for Cave Junction (42.166664, -123.648096). Data through 2026-11-24; page updated 2026-11-25. How we count rain days.

Source: PRISM Group, Oregon State University, https://prism.oregonstate.edu. These are gridded estimates, not gauge readings; conditions at a particular site can differ.