RainDayRecord

Rain days in Pink, Oklahoma

Pink averages 63 rain days a year, counting days with at least 0.10 in of precipitation in the PRISM 4 km grid cell that contains it (1991-2020 normals). May is the wettest month at 7.9 rain days and January the driest at 3.3. That is 3 more than the median Oklahoma location (60).

Quick answers

How many rain days does Pink get a year?

About 63: that many days in a normal year bring 0.10 in or more of rain or melted snow. That makes Pink the 74th wettest of 210 Oklahoma cities and towns.

What is the wettest month in Pink?

May, with 7.9 rain days in a normal year. To cover 9 years in 10, plan for 11.

What is the driest month?

January, with 3.3 rain days (plan for 6).

How many heavy-rain days does Pink get?

25 a year with 0.50 in or more, most often in May (3.5).

Why these counts are lower than some weather sites': a rain day here means 0.10 in or more. Counts based on 0.01 in (NOAA's "days with precipitation") or 0.04 in (WeatherSpark) also include drizzle and trace days.

Rain days by month

The wettest three months are April-June, with 20.8 rain days combined; the driest are December-February, with 10.5. August swings the most from year to year: it averages 5.7 rain days, but covering 9 years in 10 takes 11. The most rain days in a single month since 1981 was 16, in May 2015.

051015JanFebMarAprMayJunJulAugSepOctNovDec
Month Normal rain days Plan for
9 of 10 yrs
Heavy days
≥ 0.50 in
Precip (in) Record (year)
January 3.3 6 1.1 1.50 7 (2020)
February 3.6 7 1.3 1.82 10 (1987)
March 5.0 8 1.9 2.83 10 (1990)
April 6.1 9 2.5 3.90 14 (2025)
May 7.9 11 3.5 5.31 16 (2015)
June 6.8 11 3.4 4.78 15 (2000)
July 5.2 8 2.3 3.59 12 (1996)
August 5.7 11 1.9 3.19 13 (2017)
September 6.0 9 2.4 3.90 15 (1986)
October 5.3 9 2.3 3.48 11 (2000)
November 4.5 8 1.5 2.22 14 (2004)
December 3.6 6 1.4 2.10 10 (1984)
Year 63.1 25.3 38.65

Rain day: at least 0.10 in. Plan for: the 90th percentile of 1991-2020 yearly counts, rounded up to a whole day. Record: 1981 to date.

The last 12 months vs normal

From November 2025 through October 2026, Pink had 43 rain days against a normal of 63: a dry stretch, 20 days below normal. 2 of 12 months came in above normal and 10 below. The biggest departure was September 2026, with 1 rain days against a normal of 6.0. Precipitation totaled 36.05 in against 38.62 in normally.

MonthRain daysNormalDifferencePrecip (in)Normal (in)
Nov 2025 2 4.5 -2.5 1.62 2.22
Dec 2025 1 3.6 -2.6 0.34 2.10
Jan 2026 4 3.3 +0.7 1.31 1.50
Feb 2026 2 3.6 -1.6 0.30 1.82
Mar 2026 3 5.0 -2.0 2.34 2.83
Apr 2026 6 6.1 -0.1 6.82 3.90
May 2026 8 7.9 +0.1 2.82 5.31
Jun 2026 5 6.8 -1.8 4.71 4.78
Jul 2026 4 5.2 -1.2 4.07 3.59
Aug 2026 3 5.7 -2.7 2.01 3.19
Sep 2026 1 6.0 -5.0 0.32 3.90
Oct 2026 4 5.3 -1.3 9.39 3.48

Pink rain days month by month

Against the median Oklahoma location, Pink gets more rain days in August and September, by half a day or more; other months are within half a day.

Rain days in January

Pink averages 3.3 rain days in January, 1.1 of them heavy, with 1.50 in of precipitation. Plan for 6 to cover 9 years in 10; the record is 7 (2020). January 2026 had 4, 0.7 above normal.

Rain days in February

Pink averages 3.6 rain days in February, 1.3 of them heavy, with 1.82 in of precipitation. Plan for 7 to cover 9 years in 10; the record is 10 (1987). February 2026 had 2, 1.6 below normal.

Rain days in March

Pink averages 5.0 rain days in March, 1.9 of them heavy, with 2.83 in of precipitation. Plan for 8 to cover 9 years in 10; the record is 10 (1990). March 2026 had 3, 2.0 below normal.

Rain days in April

Pink averages 6.1 rain days in April, 2.5 of them heavy, with 3.90 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 14 (2025). April 2026 had 6, right on normal.

Rain days in May

Pink averages 7.9 rain days in May, 3.5 of them heavy, with 5.31 in of precipitation. Plan for 11 to cover 9 years in 10; the record is 16 (2015). May 2026 had 8, right on normal.

Rain days in June

Pink averages 6.8 rain days in June, 3.4 of them heavy, with 4.78 in of precipitation. Plan for 11 to cover 9 years in 10; the record is 15 (2000). June 2026 had 5, 1.8 below normal.

Rain days in July

Pink averages 5.2 rain days in July, 2.3 of them heavy, with 3.59 in of precipitation. Plan for 8 to cover 9 years in 10; the record is 12 (1996). July 2026 had 4, 1.2 below normal.

Rain days in August

Pink averages 5.7 rain days in August, 1.9 of them heavy, with 3.19 in of precipitation. Plan for 11 to cover 9 years in 10; the record is 13 (2017). That is 0.6 more than the median Oklahoma location (5.1). August 2026 had 3, 2.7 below normal.

Rain days in September

Pink averages 6.0 rain days in September, 2.4 of them heavy, with 3.90 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 15 (1986). That is 0.7 more than the median Oklahoma location (5.3). September 2026 had 1, 5.0 below normal.

Rain days in October

Pink averages 5.3 rain days in October, 2.3 of them heavy, with 3.48 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 11 (2000). October 2026 had 4, 1.3 below normal.

Rain days in November

Pink averages 4.5 rain days in November, 1.5 of them heavy, with 2.22 in of precipitation. Plan for 8 to cover 9 years in 10; the record is 14 (2004). November 2025 had 2, 2.5 below normal.

Rain days in December

Pink averages 3.6 rain days in December, 1.4 of them heavy, with 2.10 in of precipitation. Plan for 6 to cover 9 years in 10; the record is 10 (1984). December 2025 had 1, 2.6 below normal.

Using these numbers in a construction schedule

For Pink, the normal column is the expected count: 63 days over a full year, 43 of them from April through October. Put those days in the schedule as non-work days or float before the job starts, not after it slips.

Average or plan-for? An average is exceeded about half the time. If May work has no float, carry 11 weather days for it rather than 7.9: Pink had that many or fewer in 9 of 10 years from 1991 to 2020. Use the normals across a long job and the plan-for figure only for months on the critical path.

Heavy days. Pink averages 25 days a year with 0.50 in or more, most often in May (3.5). Those are the days most likely to stop earthwork, paving and concrete outright.

Claiming time for abnormal weather. Under AIA A201-2017 §15.1.6.2, a claim for extra time because of adverse weather has to show the conditions were abnormal for the period, could not have been reasonably anticipated, and had an adverse effect on the scheduled work. The normals above show what could be anticipated in Pink; the claim also needs the day-by-day record for your site and dates.

Price a rain-day report for a site in Pink. Enter your dates to see actual rain days against this normal for free. The full PDF ($99) adds the daily record, a month-by-month comparison and a method statement you can attach to a schedule update or claim.

Check rain days near Pink

What the weather delay claim report includes

Nearby

Pink is in Pottawatomie County, which averages 61 rain days a year across the county. Pink gets 2 more rain days a year than that county-wide average.

The nearest larger city, Norman (14 mi away), averages 60 rain days a year: Pink gets 4 more.

Closest other areas in Oklahoma:

All Oklahoma cities and counties

Related guides

Method and source

A rain day is a day with at least 0.10 in (2.54 mm) in PRISM's daily estimate, which covers the 24 hours ending 12:00 UTC. Heavy days use 0.50 in. Normals are 1991-2020 averages. Records run from 1981 to the last complete month. Figures are for the 4 km cell containing the Census point for Pink (35.232691, -97.100032). Data through 2026-11-24; page updated 2026-11-25. How we count rain days.

Source: PRISM Group, Oregon State University, https://prism.oregonstate.edu. These are gridded estimates, not gauge readings; conditions at a particular site can differ.