RainDayRecord

Rain days in Shelby, Ohio

Shelby averages 91 rain days a year, counting days with at least 0.10 in of precipitation in the PRISM 4 km grid cell that contains it (1991-2020 normals). May is the wettest month at 9.9 rain days and February the driest at 5.6. That is 3 more than the median Ohio location (88).

Quick answers

How many rain days does Shelby get a year?

About 91: that many days in a normal year bring 0.10 in or more of rain or melted snow. That makes Shelby the 115th wettest of 506 Ohio cities and towns.

What is the wettest month in Shelby?

May, with 9.9 rain days in a normal year. To cover 9 years in 10, plan for 14.

What is the driest month?

February, with 5.6 rain days (plan for 9).

How many heavy-rain days does Shelby get?

26 a year with 0.50 in or more, most often in June (3.0).

Why these counts are lower than some weather sites': a rain day here means 0.10 in or more. Counts based on 0.01 in (NOAA's "days with precipitation") or 0.04 in (WeatherSpark) also include drizzle and trace days.

Rain days by month

The wettest three months are April-June, with 28.2 rain days combined; the driest are December-February, with 19.8. May is also the least predictable month, with the widest gap between its average and its plan-for number. The most rain days in a single month since 1981 was 21, in July 1992.

051015JanFebMarAprMayJunJulAugSepOctNovDec
Month Normal rain days Plan for
9 of 10 yrs
Heavy days
≥ 0.50 in
Precip (in) Record (year)
January 7.0 9 1.6 3.11 14 (2005)
February 5.6 9 1.3 2.31 12 (2008)
March 7.7 10 1.8 3.02 12 (2020)
April 9.1 12 2.6 3.97 14 (1999)
May 9.9 14 2.6 4.36 16 (1989)
June 9.2 12 3.0 4.51 15 (1998)
July 8.0 11 2.7 4.01 21 (1992)
August 7.1 10 2.2 3.47 11 (2021)
September 6.7 10 2.2 3.37 13 (2012)
October 7.2 10 2.0 3.14 12 (2020)
November 6.7 10 2.0 3.00 16 (1985)
December 7.2 10 2.1 3.20 13 (1990)
Year 91.4 26.0 41.47

Rain day: at least 0.10 in. Plan for: the 90th percentile of 1991-2020 yearly counts, rounded up to a whole day. Record: 1981 to date.

The last 12 months vs normal

From November 2025 through October 2026, Shelby had 94 rain days against a normal of 91.4, close to normal overall. 7 of 12 months came in above normal and 5 below. The biggest departure was February 2026, with 2 rain days against a normal of 5.6. Precipitation totaled 43.16 in against 41.47 in normally.

MonthRain daysNormalDifferencePrecip (in)Normal (in)
Nov 2025 7 6.7 +0.3 1.54 3.00
Dec 2025 10 7.2 +2.8 3.26 3.20
Jan 2026 5 7.0 -2.0 1.22 3.11
Feb 2026 2 5.6 -3.6 0.90 2.31
Mar 2026 8 7.7 +0.3 4.10 3.02
Apr 2026 12 9.1 +2.9 8.42 3.97
May 2026 11 9.9 +1.1 6.69 4.36
Jun 2026 9 9.2 -0.2 4.29 4.51
Jul 2026 5 8.0 -3.0 2.88 4.01
Aug 2026 10 7.1 +2.9 4.02 3.47
Sep 2026 9 6.7 +2.3 4.42 3.37
Oct 2026 6 7.2 -1.2 1.42 3.14

Shelby rain days month by month

Against the median Ohio location, Shelby gets more rain days in April, May, September and October, by half a day or more; other months are within half a day.

Rain days in January

Shelby averages 7.0 rain days in January, 1.6 of them heavy, with 3.11 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 14 (2005). January 2026 had 5, 2.0 below normal.

Rain days in February

Shelby averages 5.6 rain days in February, 1.3 of them heavy, with 2.31 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 12 (2008). February 2026 had 2, 3.6 below normal.

Rain days in March

Shelby averages 7.7 rain days in March, 1.8 of them heavy, with 3.02 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 12 (2020). March 2026 had 8, right on normal.

Rain days in April

Shelby averages 9.1 rain days in April, 2.6 of them heavy, with 3.97 in of precipitation. Plan for 12 to cover 9 years in 10; the record is 14 (1999). That is 0.5 more than the median Ohio location (8.6). April 2026 had 12, 2.9 above normal.

Rain days in May

Shelby averages 9.9 rain days in May, 2.6 of them heavy, with 4.36 in of precipitation. Plan for 14 to cover 9 years in 10; the record is 16 (1989). That is 0.7 more than the median Ohio location (9.2). May 2026 had 11, 1.1 above normal.

Rain days in June

Shelby averages 9.2 rain days in June, 3.0 of them heavy, with 4.51 in of precipitation. Plan for 12 to cover 9 years in 10; the record is 15 (1998). June 2026 had 9, right on normal.

Rain days in July

Shelby averages 8.0 rain days in July, 2.7 of them heavy, with 4.01 in of precipitation. Plan for 11 to cover 9 years in 10; the record is 21 (1992). July 2026 had 5, 3.0 below normal.

Rain days in August

Shelby averages 7.1 rain days in August, 2.2 of them heavy, with 3.47 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 11 (2021). August 2026 had 10, 2.9 above normal.

Rain days in September

Shelby averages 6.7 rain days in September, 2.2 of them heavy, with 3.37 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 13 (2012). That is 0.7 more than the median Ohio location (6.0). September 2026 had 9, 2.3 above normal.

Rain days in October

Shelby averages 7.2 rain days in October, 2.0 of them heavy, with 3.14 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 12 (2020). That is 0.9 more than the median Ohio location (6.3). October 2026 had 6, 1.2 below normal.

Rain days in November

Shelby averages 6.7 rain days in November, 2.0 of them heavy, with 3.00 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 16 (1985). November 2025 had 7, right on normal.

Rain days in December

Shelby averages 7.2 rain days in December, 2.1 of them heavy, with 3.20 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 13 (1990). December 2025 had 10, 2.8 above normal.

Using these numbers in a construction schedule

For Shelby, the normal column is the expected count: 91 days over a full year, 57 of them from April through October. Put those days in the schedule as non-work days or float before the job starts, not after it slips.

Average or plan-for? An average is exceeded about half the time. If May work has no float, carry 14 weather days for it rather than 9.9: Shelby had that many or fewer in 9 of 10 years from 1991 to 2020. Use the normals across a long job and the plan-for figure only for months on the critical path.

Heavy days. Shelby averages 26 days a year with 0.50 in or more, most often in June (3.0). Those are the days most likely to stop earthwork, paving and concrete outright.

Claiming time for abnormal weather. Under AIA A201-2017 §15.1.6.2, a claim for extra time because of adverse weather has to show the conditions were abnormal for the period, could not have been reasonably anticipated, and had an adverse effect on the scheduled work. The normals above show what could be anticipated in Shelby; the claim also needs the day-by-day record for your site and dates.

Price a rain-day report for a site in Shelby. Enter your dates to see actual rain days against this normal for free. The full PDF ($99) adds the daily record, a month-by-month comparison and a method statement you can attach to a schedule update or claim.

Check rain days near Shelby

What the weather delay claim report includes

Nearby

Shelby is in Richland County, which averages 91 rain days a year across the county. The two numbers are close but measure different things: the county figure averages all 73 of the county's grid cells, while Shelby's is the single 4 km cell at its Census point. A site elsewhere in Richland County can differ from both.

The nearest larger city, Elyria (45 mi away), averages 88 rain days a year: Shelby gets 3 more.

Closest other areas in Ohio:

All Ohio cities and counties

Related guides

Method and source

A rain day is a day with at least 0.10 in (2.54 mm) in PRISM's daily estimate, which covers the 24 hours ending 12:00 UTC. Heavy days use 0.50 in. Normals are 1991-2020 averages. Records run from 1981 to the last complete month. Figures are for the 4 km cell containing the Census point for Shelby (40.884763, -82.658168). Data through 2026-11-24; page updated 2026-11-25. How we count rain days.

Source: PRISM Group, Oregon State University, https://prism.oregonstate.edu. These are gridded estimates, not gauge readings; conditions at a particular site can differ.