New London averages 90 rain days a year, counting days with at least 0.10 in of precipitation in the PRISM 4 km grid cell that contains it (1991-2020 normals). June is the wettest month at 9.2 rain days and February the driest at 5.6. That is close to the Ohio median of 88.
Quick answers
How many rain days does New London get a year?
About 90: that many days in a normal year bring 0.10 in or more of rain or melted snow. That makes New London the 193rd wettest of 506 Ohio cities and towns.
What is the wettest month in New London?
June, with 9.2 rain days in a normal year. To cover 9 years in 10, plan for 13.
What is the driest month?
February, with 5.6 rain days (plan for 8).
How many heavy-rain days does New London get?
24 a year with 0.50 in or more, most often in June (2.7).
Why these counts are lower than some weather sites': a rain day here means 0.10 in or more. Counts based on 0.01 in (NOAA's "days with precipitation") or 0.04 in (WeatherSpark) also include drizzle and trace days.
Rain days by month
The wettest three months are April-June, with 27.1 rain days combined; the driest are December-February, with 18.8. April swings the most from year to year: it averages 8.8 rain days, but covering 9 years in 10 takes 13. The most rain days in a single month since 1981 was 16, in May 2011.
| Month | Normal rain days | Plan for 9 of 10 yrs |
Heavy days ≥ 0.50 in |
Precip (in) | Record (year) |
|---|---|---|---|---|---|
| January | 6.4 | 9 | 1.4 | 2.76 | 11 (2017) |
| February | 5.6 | 8 | 1.1 | 2.27 | 11 (2018) |
| March | 7.7 | 11 | 1.5 | 2.92 | 12 (2020) |
| April | 8.8 | 13 | 2.2 | 3.85 | 15 (2026) |
| May | 9.1 | 13 | 2.6 | 4.09 | 16 (2011) |
| June | 9.2 | 13 | 2.7 | 4.41 | 16 (1998) |
| July | 8.1 | 11 | 2.5 | 4.02 | 14 (1992) |
| August | 7.3 | 10 | 2.5 | 3.66 | 13 (1985) |
| September | 6.4 | 10 | 2.4 | 3.49 | 13 (2011) |
| October | 7.5 | 11 | 1.9 | 3.22 | 14 (2001) |
| November | 6.6 | 9 | 1.8 | 2.90 | 16 (1985) |
| December | 6.8 | 9 | 1.4 | 2.76 | 13 (1990) |
| Year | 89.5 | 24.1 | 40.34 |
Rain day: at least 0.10 in. Plan for: the 90th percentile of 1991-2020 yearly counts, rounded up to a whole day. Record: 1981 to date.
The last 12 months vs normal
From November 2025 through October 2026, New London had 91 rain days against a normal of 89.5, close to normal overall. 5 of 12 months came in above normal and 7 below. The biggest departure was April 2026, with 15 rain days against a normal of 8.8. Precipitation totaled 39.38 in against 40.35 in normally.
| Month | Rain days | Normal | Difference | Precip (in) | Normal (in) |
|---|---|---|---|---|---|
| Nov 2025 | 5 | 6.6 | -1.6 | 1.43 | 2.90 |
| Dec 2025 | 8 | 6.8 | +1.2 | 2.22 | 2.76 |
| Jan 2026 | 4 | 6.4 | -2.4 | 1.34 | 2.76 |
| Feb 2026 | 2 | 5.6 | -3.6 | 0.53 | 2.27 |
| Mar 2026 | 8 | 7.7 | +0.3 | 3.29 | 2.92 |
| Apr 2026 | 15 | 8.8 | +6.2 | 7.57 | 3.85 |
| May 2026 | 11 | 9.1 | +1.9 | 5.77 | 4.09 |
| Jun 2026 | 9 | 9.2 | -0.2 | 4.29 | 4.41 |
| Jul 2026 | 6 | 8.1 | -2.1 | 1.99 | 4.02 |
| Aug 2026 | 7 | 7.3 | -0.3 | 3.94 | 3.66 |
| Sep 2026 | 10 | 6.4 | +3.6 | 4.58 | 3.49 |
| Oct 2026 | 6 | 7.5 | -1.5 | 2.43 | 3.22 |
New London rain days month by month
Against the median Ohio location, New London gets more rain days in August and October, by half a day or more; other months are within half a day.
Rain days in January
New London averages 6.4 rain days in January, 1.4 of them heavy, with 2.76 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 11 (2017). January 2026 had 4, 2.4 below normal.
Rain days in February
New London averages 5.6 rain days in February, 1.1 of them heavy, with 2.27 in of precipitation. Plan for 8 to cover 9 years in 10; the record is 11 (2018). February 2026 had 2, 3.6 below normal.
Rain days in March
New London averages 7.7 rain days in March, 1.5 of them heavy, with 2.92 in of precipitation. Plan for 11 to cover 9 years in 10; the record is 12 (2020). March 2026 had 8, right on normal.
Rain days in April
New London averages 8.8 rain days in April, 2.2 of them heavy, with 3.85 in of precipitation. Plan for 13 to cover 9 years in 10; the record is 15 (2026). April 2026 had 15, 6.2 above normal.
Rain days in May
New London averages 9.1 rain days in May, 2.6 of them heavy, with 4.09 in of precipitation. Plan for 13 to cover 9 years in 10; the record is 16 (2011). May 2026 had 11, 1.9 above normal.
Rain days in June
New London averages 9.2 rain days in June, 2.7 of them heavy, with 4.41 in of precipitation. Plan for 13 to cover 9 years in 10; the record is 16 (1998). June 2026 had 9, right on normal.
Rain days in July
New London averages 8.1 rain days in July, 2.5 of them heavy, with 4.02 in of precipitation. Plan for 11 to cover 9 years in 10; the record is 14 (1992). July 2026 had 6, 2.1 below normal.
Rain days in August
New London averages 7.3 rain days in August, 2.5 of them heavy, with 3.66 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 13 (1985). That is 0.6 more than the median Ohio location (6.7). August 2026 had 7, right on normal.
Rain days in September
New London averages 6.4 rain days in September, 2.4 of them heavy, with 3.49 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 13 (2011). September 2026 had 10, 3.6 above normal.
Rain days in October
New London averages 7.5 rain days in October, 1.9 of them heavy, with 3.22 in of precipitation. Plan for 11 to cover 9 years in 10; the record is 14 (2001). That is 1.2 more than the median Ohio location (6.3). October 2026 had 6, 1.5 below normal.
Rain days in November
New London averages 6.6 rain days in November, 1.8 of them heavy, with 2.90 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 16 (1985). November 2025 had 5, 1.6 below normal.
Rain days in December
New London averages 6.8 rain days in December, 1.4 of them heavy, with 2.76 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 13 (1990). December 2025 had 8, 1.2 above normal.
Using these numbers in a construction schedule
For New London, the normal column is the expected count: 90 days over a full year, 56 of them from April through October. Put those days in the schedule as non-work days or float before the job starts, not after it slips.
Average or plan-for? An average is exceeded about half the time. If June work has no float, carry 13 weather days for it rather than 9.2: New London had that many or fewer in 9 of 10 years from 1991 to 2020. Use the normals across a long job and the plan-for figure only for months on the critical path.
Heavy days. New London averages 24 days a year with 0.50 in or more, most often in June (2.7). Those are the days most likely to stop earthwork, paving and concrete outright.
Claiming time for abnormal weather. Under AIA A201-2017 §15.1.6.2, a claim for extra time because of adverse weather has to show the conditions were abnormal for the period, could not have been reasonably anticipated, and had an adverse effect on the scheduled work. The normals above show what could be anticipated in New London; the claim also needs the day-by-day record for your site and dates.
Price a rain-day report for a site in New London. Enter your dates to see actual rain days against this normal for free. The full PDF ($99) adds the daily record, a month-by-month comparison and a method statement you can attach to a schedule update or claim.
Check rain days near New LondonNearby
New London is in Huron County, which averages 89 rain days a year across the county. The two numbers are close but measure different things: the county figure averages all 77 of the county's grid cells, while New London's is the single 4 km cell at its Census point. A site elsewhere in Huron County can differ from both.
The nearest larger city, Elyria (26 mi away), averages 88 rain days a year: New London gets 1 more.
Closest other areas in Ohio:
- Greenwich, Ohio: 90 rain days / yr, 7 mi
- Wellington, Ohio: 90 rain days / yr, 11 mi
- Huron County, Ohio: 89 rain days / yr, 11 mi
- Wakeman, Ohio: 90 rain days / yr, 12 mi
- Plymouth, Ohio: 92 rain days / yr, 15 mi
- Ashland, Ohio: 85 rain days / yr, 15 mi
- Norwalk, Ohio: 83 rain days / yr, 16 mi
- Willard, Ohio: 92 rain days / yr, 17 mi
Related guides
- AIA A201 Weather Delay Claims (ยง15.1.6.2): The Three Tests, With Real Numbers
- How Many Weather Days to Put in a Construction Schedule (Normal vs Plan-For)
- How to Document Weather Delays on a Construction Project (Checklist + Daily Log)
Method and source
A rain day is a day with at least 0.10 in (2.54 mm) in PRISM's daily estimate, which covers the 24 hours ending 12:00 UTC. Heavy days use 0.50 in. Normals are 1991-2020 averages. Records run from 1981 to the last complete month. Figures are for the 4 km cell containing the Census point for New London (41.079698, -82.40618). Data through 2026-11-24; page updated 2026-11-25. How we count rain days.
Source: PRISM Group, Oregon State University, https://prism.oregonstate.edu. These are gridded estimates, not gauge readings; conditions at a particular site can differ.