RainDayRecord

Rain days in Mount Gilead, Ohio

Mount Gilead averages 91 rain days a year, counting days with at least 0.10 in of precipitation in the PRISM 4 km grid cell that contains it (1991-2020 normals). May is the wettest month at 10.0 rain days and February the driest at 5.5. That is 3 more than the median Ohio location (88).

Quick answers

How many rain days does Mount Gilead get a year?

About 91: that many days in a normal year bring 0.10 in or more of rain or melted snow. That makes Mount Gilead the 132nd wettest of 506 Ohio cities and towns.

What is the wettest month in Mount Gilead?

May, with 10.0 rain days in a normal year. To cover 9 years in 10, plan for 14.

What is the driest month?

February, with 5.5 rain days (plan for 9).

How many heavy-rain days does Mount Gilead get?

26 a year with 0.50 in or more, most often in June (3.1).

Why these counts are lower than some weather sites': a rain day here means 0.10 in or more. Counts based on 0.01 in (NOAA's "days with precipitation") or 0.04 in (WeatherSpark) also include drizzle and trace days.

Rain days by month

The wettest three months are April-June, with 28.8 rain days combined; the driest are September-November, with 19.3. May is also the least predictable month, with the widest gap between its average and its plan-for number. The most rain days in a single month since 1981 was 17, in May 1996.

051015JanFebMarAprMayJunJulAugSepOctNovDec
Month Normal rain days Plan for
9 of 10 yrs
Heavy days
≥ 0.50 in
Precip (in) Record (year)
January 6.8 9 1.7 3.01 13 (2005)
February 5.5 9 1.2 2.29 14 (2008)
March 7.3 10 1.9 3.00 12 (2020)
April 9.5 12 2.6 4.04 14 (1999)
May 10.0 14 2.8 4.39 17 (1996)
June 9.3 13 3.1 4.67 16 (2015)
July 8.4 11 2.9 4.34 16 (2013)
August 7.5 10 2.2 3.48 13 (2021)
September 6.1 9 2.0 3.21 13 (2012)
October 6.7 10 1.7 2.85 12 (1983)
November 6.5 9 2.0 2.97 17 (1985)
December 7.0 10 1.8 3.03 12 (2012)
Year 90.8 25.8 41.28

Rain day: at least 0.10 in. Plan for: the 90th percentile of 1991-2020 yearly counts, rounded up to a whole day. Record: 1981 to date.

The last 12 months vs normal

From November 2025 through October 2026, Mount Gilead had 85 rain days against a normal of 90.6: a dry stretch, 5.6 days below normal. 5 of 12 months came in above normal and 6 below. The biggest departure was October 2026, with 3 rain days against a normal of 6.7. Precipitation totaled 39.52 in against 41.28 in normally.

MonthRain daysNormalDifferencePrecip (in)Normal (in)
Nov 2025 6 6.5 -0.5 1.85 2.97
Dec 2025 7 7.0 +0.0 2.55 3.03
Jan 2026 4 6.8 -2.8 1.29 3.01
Feb 2026 2 5.5 -3.5 1.33 2.29
Mar 2026 8 7.3 +0.7 4.34 3.00
Apr 2026 12 9.5 +2.5 5.01 4.04
May 2026 11 10.0 +1.0 6.51 4.39
Jun 2026 7 9.3 -2.3 3.85 4.67
Jul 2026 6 8.4 -2.4 3.63 4.34
Aug 2026 10 7.5 +2.5 4.79 3.48
Sep 2026 9 6.1 +2.9 3.48 3.21
Oct 2026 3 6.7 -3.7 0.89 2.85

Mount Gilead rain days month by month

Against the median Ohio location, Mount Gilead gets more rain days in April, May, June and August, by half a day or more; other months are within half a day.

Rain days in January

Mount Gilead averages 6.8 rain days in January, 1.7 of them heavy, with 3.01 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 13 (2005). January 2026 had 4, 2.8 below normal.

Rain days in February

Mount Gilead averages 5.5 rain days in February, 1.2 of them heavy, with 2.29 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 14 (2008). February 2026 had 2, 3.5 below normal.

Rain days in March

Mount Gilead averages 7.3 rain days in March, 1.9 of them heavy, with 3.00 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 12 (2020). March 2026 had 8, 0.7 above normal.

Rain days in April

Mount Gilead averages 9.5 rain days in April, 2.6 of them heavy, with 4.04 in of precipitation. Plan for 12 to cover 9 years in 10; the record is 14 (1999). That is 0.9 more than the median Ohio location (8.6). April 2026 had 12, 2.5 above normal.

Rain days in May

Mount Gilead averages 10.0 rain days in May, 2.8 of them heavy, with 4.39 in of precipitation. Plan for 14 to cover 9 years in 10; the record is 17 (1996). That is 0.8 more than the median Ohio location (9.2). May 2026 had 11, 1.0 above normal.

Rain days in June

Mount Gilead averages 9.3 rain days in June, 3.1 of them heavy, with 4.67 in of precipitation. Plan for 13 to cover 9 years in 10; the record is 16 (2015). That is 0.5 more than the median Ohio location (8.8). June 2026 had 7, 2.3 below normal.

Rain days in July

Mount Gilead averages 8.4 rain days in July, 2.9 of them heavy, with 4.34 in of precipitation. Plan for 11 to cover 9 years in 10; the record is 16 (2013). July 2026 had 6, 2.4 below normal.

Rain days in August

Mount Gilead averages 7.5 rain days in August, 2.2 of them heavy, with 3.48 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 13 (2021). That is 0.8 more than the median Ohio location (6.7). August 2026 had 10, 2.5 above normal.

Rain days in September

Mount Gilead averages 6.1 rain days in September, 2.0 of them heavy, with 3.21 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 13 (2012). September 2026 had 9, 2.9 above normal.

Rain days in October

Mount Gilead averages 6.7 rain days in October, 1.7 of them heavy, with 2.85 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 12 (1983). October 2026 had 3, 3.7 below normal.

Rain days in November

Mount Gilead averages 6.5 rain days in November, 2.0 of them heavy, with 2.97 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 17 (1985). November 2025 had 6, 0.5 below normal.

Rain days in December

Mount Gilead averages 7.0 rain days in December, 1.8 of them heavy, with 3.03 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 12 (2012). December 2025 had 7, right on normal.

Using these numbers in a construction schedule

For Mount Gilead, the normal column is the expected count: 91 days over a full year, 58 of them from April through October. Put those days in the schedule as non-work days or float before the job starts, not after it slips.

Average or plan-for? An average is exceeded about half the time. If May work has no float, carry 14 weather days for it rather than 10.0: Mount Gilead had that many or fewer in 9 of 10 years from 1991 to 2020. Use the normals across a long job and the plan-for figure only for months on the critical path.

Heavy days. Mount Gilead averages 26 days a year with 0.50 in or more, most often in June (3.1). Those are the days most likely to stop earthwork, paving and concrete outright.

Claiming time for abnormal weather. Under AIA A201-2017 §15.1.6.2, a claim for extra time because of adverse weather has to show the conditions were abnormal for the period, could not have been reasonably anticipated, and had an adverse effect on the scheduled work. The normals above show what could be anticipated in Mount Gilead; the claim also needs the day-by-day record for your site and dates.

Price a rain-day report for a site in Mount Gilead. Enter your dates to see actual rain days against this normal for free. The full PDF ($99) adds the daily record, a month-by-month comparison and a method statement you can attach to a schedule update or claim.

Check rain days near Mount Gilead

What the weather delay claim report includes

Nearby

Mount Gilead is in Morrow County, which averages 91 rain days a year across the county. The two numbers are close but measure different things: the county figure averages all 64 of the county's grid cells, while Mount Gilead's is the single 4 km cell at its Census point. A site elsewhere in Morrow County can differ from both.

The nearest larger city, Newark (40 mi away), averages 87 rain days a year: Mount Gilead gets 4 more.

Closest other areas in Ohio:

All Ohio cities and counties

Related guides

Method and source

A rain day is a day with at least 0.10 in (2.54 mm) in PRISM's daily estimate, which covers the 24 hours ending 12:00 UTC. Heavy days use 0.50 in. Normals are 1991-2020 averages. Records run from 1981 to the last complete month. Figures are for the 4 km cell containing the Census point for Mount Gilead (40.554047, -82.827904). Data through 2026-11-24; page updated 2026-11-25. How we count rain days.

Source: PRISM Group, Oregon State University, https://prism.oregonstate.edu. These are gridded estimates, not gauge readings; conditions at a particular site can differ.