RainDayRecord

Rain days in Gahanna, Ohio

Gahanna averages 86 rain days a year, counting days with at least 0.10 in of precipitation in the PRISM 4 km grid cell that contains it (1991-2020 normals). May is the wettest month at 9.1 rain days and February the driest at 5.8. That is close to the Ohio median of 88.

Quick answers

How many rain days does Gahanna get a year?

About 86: that many days in a normal year bring 0.10 in or more of rain or melted snow. That makes Gahanna the 325th wettest of 506 Ohio cities and towns.

What is the wettest month in Gahanna?

May, with 9.1 rain days in a normal year. To cover 9 years in 10, plan for 14.

What is the driest month?

February, with 5.8 rain days (plan for 10).

How many heavy-rain days does Gahanna get?

28 a year with 0.50 in or more, most often in July (3.4).

Why these counts are lower than some weather sites': a rain day here means 0.10 in or more. Counts based on 0.01 in (NOAA's "days with precipitation") or 0.04 in (WeatherSpark) also include drizzle and trace days.

Rain days by month

The wettest three months are April-June, with 26.3 rain days combined; the driest are August-October, with 18.3. May is also the least predictable month, with the widest gap between its average and its plan-for number. The most rain days in a single month since 1981 was 17, in May 1996.

051015JanFebMarAprMayJunJulAugSepOctNovDec
Month Normal rain days Plan for
9 of 10 yrs
Heavy days
≥ 0.50 in
Precip (in) Record (year)
January 6.7 9 1.6 3.17 13 (2005)
February 5.8 10 1.5 2.44 12 (2018)
March 7.6 10 2.1 3.48 12 (2020)
April 8.5 11 2.8 4.06 13 (1999)
May 9.1 14 3.0 4.42 17 (1996)
June 8.7 12 3.2 4.62 14 (2018)
July 8.3 11 3.4 4.78 14 (2025)
August 6.4 10 2.5 3.70 12 (2026)
September 5.8 10 2.4 3.58 12 (2006)
October 6.1 9 1.9 3.04 11 (2011)
November 6.7 10 2.0 2.94 15 (1985)
December 6.9 10 2.1 3.21 15 (2007)
Year 86.4 28.5 43.44

Rain day: at least 0.10 in. Plan for: the 90th percentile of 1991-2020 yearly counts, rounded up to a whole day. Record: 1981 to date.

The last 12 months vs normal

From November 2025 through October 2026, Gahanna had 92 rain days against a normal of 86.6: a wet stretch, 5.4 days above normal. 5 of 12 months came in above normal and 7 below. The biggest departure was August 2026, with 12 rain days against a normal of 6.4. Precipitation totaled 55.11 in against 43.44 in normally.

MonthRain daysNormalDifferencePrecip (in)Normal (in)
Nov 2025 6 6.7 -0.7 2.26 2.94
Dec 2025 6 6.9 -0.9 2.58 3.21
Jan 2026 5 6.7 -1.7 1.61 3.17
Feb 2026 5 5.8 -0.8 2.15 2.44
Mar 2026 9 7.6 +1.4 6.67 3.48
Apr 2026 9 8.5 +0.5 3.11 4.06
May 2026 10 9.1 +0.9 7.57 4.42
Jun 2026 8 8.7 -0.7 4.17 4.62
Jul 2026 7 8.3 -1.3 4.49 4.78
Aug 2026 12 6.4 +5.6 12.19 3.70
Sep 2026 11 5.8 +5.2 7.03 3.58
Oct 2026 4 6.1 -2.1 1.28 3.04

Gahanna rain days month by month

Every month in Gahanna is within half a rain day of the median Ohio location.

Rain days in January

Gahanna averages 6.7 rain days in January, 1.6 of them heavy, with 3.17 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 13 (2005). January 2026 had 5, 1.7 below normal.

Rain days in February

Gahanna averages 5.8 rain days in February, 1.5 of them heavy, with 2.44 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 12 (2018). February 2026 had 5, 0.8 below normal.

Rain days in March

Gahanna averages 7.6 rain days in March, 2.1 of them heavy, with 3.48 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 12 (2020). March 2026 had 9, 1.4 above normal.

Rain days in April

Gahanna averages 8.5 rain days in April, 2.8 of them heavy, with 4.06 in of precipitation. Plan for 11 to cover 9 years in 10; the record is 13 (1999). April 2026 had 9, 0.5 above normal.

Rain days in May

Gahanna averages 9.1 rain days in May, 3.0 of them heavy, with 4.42 in of precipitation. Plan for 14 to cover 9 years in 10; the record is 17 (1996). May 2026 had 10, 0.9 above normal.

Rain days in June

Gahanna averages 8.7 rain days in June, 3.2 of them heavy, with 4.62 in of precipitation. Plan for 12 to cover 9 years in 10; the record is 14 (2018). June 2026 had 8, 0.7 below normal.

Rain days in July

Gahanna averages 8.3 rain days in July, 3.4 of them heavy, with 4.78 in of precipitation. Plan for 11 to cover 9 years in 10; the record is 14 (2025). July 2026 had 7, 1.3 below normal.

Rain days in August

Gahanna averages 6.4 rain days in August, 2.5 of them heavy, with 3.70 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 12 (2026). August 2026 had 12, 5.6 above normal.

Rain days in September

Gahanna averages 5.8 rain days in September, 2.4 of them heavy, with 3.58 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 12 (2006). September 2026 had 11, 5.2 above normal.

Rain days in October

Gahanna averages 6.1 rain days in October, 1.9 of them heavy, with 3.04 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 11 (2011). October 2026 had 4, 2.1 below normal.

Rain days in November

Gahanna averages 6.7 rain days in November, 2.0 of them heavy, with 2.94 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 15 (1985). November 2025 had 6, 0.7 below normal.

Rain days in December

Gahanna averages 6.9 rain days in December, 2.1 of them heavy, with 3.21 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 15 (2007). December 2025 had 6, 0.9 below normal.

Using these numbers in a construction schedule

For Gahanna, the normal column is the expected count: 86 days over a full year, 53 of them from April through October. Put those days in the schedule as non-work days or float before the job starts, not after it slips.

Average or plan-for? An average is exceeded about half the time. If May work has no float, carry 14 weather days for it rather than 9.1: Gahanna had that many or fewer in 9 of 10 years from 1991 to 2020. Use the normals across a long job and the plan-for figure only for months on the critical path.

Heavy days. Gahanna averages 28 days a year with 0.50 in or more, most often in July (3.4). Those are the days most likely to stop earthwork, paving and concrete outright.

Claiming time for abnormal weather. Under AIA A201-2017 §15.1.6.2, a claim for extra time because of adverse weather has to show the conditions were abnormal for the period, could not have been reasonably anticipated, and had an adverse effect on the scheduled work. The normals above show what could be anticipated in Gahanna; the claim also needs the day-by-day record for your site and dates. With the last 12 months running 5.4 rain days above normal, it is worth pulling that record now.

Price a rain-day report for a site in Gahanna. Enter your dates to see actual rain days against this normal for free. The full PDF ($99) adds the daily record, a month-by-month comparison and a method statement you can attach to a schedule update or claim.

Check rain days near Gahanna

What the weather delay claim report includes

Nearby

Gahanna is in Franklin County, which averages 87 rain days a year across the county. The two numbers are close but measure different things: the county figure averages all 87 of the county's grid cells, while Gahanna's is the single 4 km cell at its Census point. A site elsewhere in Franklin County can differ from both.

The nearest larger city, Columbus (7 mi away), averages 88 rain days a year: Gahanna gets 2 fewer.

Closest other areas in Ohio:

All Ohio cities and counties

Related guides

Method and source

A rain day is a day with at least 0.10 in (2.54 mm) in PRISM's daily estimate, which covers the 24 hours ending 12:00 UTC. Heavy days use 0.50 in. Normals are 1991-2020 averages. Records run from 1981 to the last complete month. Figures are for the 4 km cell containing the Census point for Gahanna (40.036054, -82.879464). Data through 2026-11-24; page updated 2026-11-25. How we count rain days.

Source: PRISM Group, Oregon State University, https://prism.oregonstate.edu. These are gridded estimates, not gauge readings; conditions at a particular site can differ.