How many rain days does Dublin get a year?
About 86: that many days in a normal year bring 0.10 in or more of rain or melted snow. That makes Dublin the 319th wettest of 506 Ohio cities and towns.
What is the wettest month in Dublin?
May, with 9.5 rain days in a normal year. To cover 9 years in 10, plan for 13.
What is the driest month?
February, with 5.5 rain days (plan for 8).
How many heavy-rain days does Dublin get?
26 a year with 0.50 in or more, most often in June (3.0).
Why these counts are lower than some weather sites': a rain day here means 0.10 in or more. Counts based on 0.01 in (NOAA's "days with precipitation") or 0.04 in (WeatherSpark) also include drizzle and trace days.
Rain days by month
The wettest three months are April-June, with 26.7 rain days combined; the driest are September-November, with 18.7. October swings the most from year to year: it averages 6.2 rain days, but covering 9 years in 10 takes 10. The most rain days in a single month since 1981 was 17, in July 1992.
| Month | Normal rain days | Plan for 9 of 10 yrs |
Heavy days ≥ 0.50 in |
Precip (in) | Record (year) |
|---|---|---|---|---|---|
| January | 6.7 | 9 | 1.6 | 2.94 | 13 (2005) |
| February | 5.5 | 8 | 1.4 | 2.30 | 10 (2019) |
| March | 7.4 | 10 | 2.0 | 3.27 | 12 (2020) |
| April | 8.3 | 10 | 2.4 | 3.81 | 13 (1999) |
| May | 9.5 | 13 | 2.9 | 4.14 | 15 (2025) |
| June | 8.9 | 12 | 3.0 | 4.51 | 15 (1998) |
| July | 8.2 | 10 | 2.7 | 3.99 | 17 (1992) |
| August | 6.6 | 10 | 2.3 | 3.44 | 14 (2026) |
| September | 6.0 | 9 | 1.9 | 3.04 | 13 (2011) |
| October | 6.2 | 10 | 1.7 | 2.86 | 10 (2013) |
| November | 6.5 | 9 | 1.9 | 2.84 | 14 (1985) |
| December | 6.7 | 10 | 1.7 | 3.01 | 14 (1990) |
| Year | 86.5 | 25.5 | 40.16 |
Rain day: at least 0.10 in. Plan for: the 90th percentile of 1991-2020 yearly counts, rounded up to a whole day. Record: 1981 to date.
The last 12 months vs normal
From November 2025 through October 2026, Dublin had 90 rain days against a normal of 86.5: a wet stretch, 3.5 days above normal. 5 of 12 months came in above normal and 7 below. The biggest departure was August 2026, with 14 rain days against a normal of 6.6. Precipitation totaled 50.26 in against 40.15 in normally.
| Month | Rain days | Normal | Difference | Precip (in) | Normal (in) |
|---|---|---|---|---|---|
| Nov 2025 | 6 | 6.5 | -0.5 | 1.96 | 2.84 |
| Dec 2025 | 5 | 6.7 | -1.7 | 2.29 | 3.01 |
| Jan 2026 | 4 | 6.7 | -2.7 | 1.51 | 2.94 |
| Feb 2026 | 4 | 5.5 | -1.5 | 1.85 | 2.30 |
| Mar 2026 | 8 | 7.4 | +0.6 | 6.44 | 3.27 |
| Apr 2026 | 10 | 8.3 | +1.7 | 3.65 | 3.81 |
| May 2026 | 10 | 9.5 | +0.5 | 7.41 | 4.14 |
| Jun 2026 | 6 | 8.9 | -2.9 | 3.76 | 4.51 |
| Jul 2026 | 7 | 8.2 | -1.2 | 4.48 | 3.99 |
| Aug 2026 | 14 | 6.6 | +7.4 | 9.84 | 3.44 |
| Sep 2026 | 11 | 6.0 | +5.0 | 6.02 | 3.04 |
| Oct 2026 | 5 | 6.2 | -1.2 | 1.05 | 2.86 |
Dublin rain days month by month
Every month in Dublin is within half a rain day of the median Ohio location.
Rain days in January
Dublin averages 6.7 rain days in January, 1.6 of them heavy, with 2.94 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 13 (2005). January 2026 had 4, 2.7 below normal.
Rain days in February
Dublin averages 5.5 rain days in February, 1.4 of them heavy, with 2.30 in of precipitation. Plan for 8 to cover 9 years in 10; the record is 10 (2019). February 2026 had 4, 1.5 below normal.
Rain days in March
Dublin averages 7.4 rain days in March, 2.0 of them heavy, with 3.27 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 12 (2020). March 2026 had 8, 0.6 above normal.
Rain days in April
Dublin averages 8.3 rain days in April, 2.4 of them heavy, with 3.81 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 13 (1999). April 2026 had 10, 1.7 above normal.
Rain days in May
Dublin averages 9.5 rain days in May, 2.9 of them heavy, with 4.14 in of precipitation. Plan for 13 to cover 9 years in 10; the record is 15 (2025). May 2026 had 10, 0.5 above normal.
Rain days in June
Dublin averages 8.9 rain days in June, 3.0 of them heavy, with 4.51 in of precipitation. Plan for 12 to cover 9 years in 10; the record is 15 (1998). June 2026 had 6, 2.9 below normal.
Rain days in July
Dublin averages 8.2 rain days in July, 2.7 of them heavy, with 3.99 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 17 (1992). July 2026 had 7, 1.2 below normal.
Rain days in August
Dublin averages 6.6 rain days in August, 2.3 of them heavy, with 3.44 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 14 (2026). August 2026 had 14, 7.4 above normal.
Rain days in September
Dublin averages 6.0 rain days in September, 1.9 of them heavy, with 3.04 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 13 (2011). September 2026 had 11, 5.0 above normal.
Rain days in October
Dublin averages 6.2 rain days in October, 1.7 of them heavy, with 2.86 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 10 (2013). October 2026 had 5, 1.2 below normal.
Rain days in November
Dublin averages 6.5 rain days in November, 1.9 of them heavy, with 2.84 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 14 (1985). November 2025 had 6, 0.5 below normal.
Rain days in December
Dublin averages 6.7 rain days in December, 1.7 of them heavy, with 3.01 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 14 (1990). December 2025 had 5, 1.7 below normal.
Using these numbers in a construction schedule
For Dublin, the normal column is the expected count: 86 days over a full year, 54 of them from April through October. Put those days in the schedule as non-work days or float before the job starts, not after it slips.
Average or plan-for? An average is exceeded about half the time. If May work has no float, carry 13 weather days for it rather than 9.5: Dublin had that many or fewer in 9 of 10 years from 1991 to 2020. Use the normals across a long job and the plan-for figure only for months on the critical path.
Heavy days. Dublin averages 26 days a year with 0.50 in or more, most often in June (3.0). Those are the days most likely to stop earthwork, paving and concrete outright.
Claiming time for abnormal weather. Under AIA A201-2017 §15.1.6.2, a claim for extra time because of adverse weather has to show the conditions were abnormal for the period, could not have been reasonably anticipated, and had an adverse effect on the scheduled work. The normals above show what could be anticipated in Dublin; the claim also needs the day-by-day record for your site and dates. With the last 12 months running 3.5 rain days above normal, it is worth pulling that record now.
Price a rain-day report for a site in Dublin. Enter your dates to see actual rain days against this normal for free. The full PDF ($99) adds the daily record, a month-by-month comparison and a method statement you can attach to a schedule update or claim.
Check rain days near DublinNearby
Dublin is in Franklin County, which averages 87 rain days a year across the county. The two numbers are close but measure different things: the county figure averages all 87 of the county's grid cells, while Dublin's is the single 4 km cell at its Census point. A site elsewhere in Franklin County can differ from both.
The nearest larger city, Columbus (12 mi away), averages 88 rain days a year: Dublin gets 2 fewer.
Closest other areas in Ohio:
- Powell, Ohio: 87 rain days / yr, 5 mi
- Hilliard, Ohio: 86 rain days / yr, 5 mi
- Plain City, Ohio: 86 rain days / yr, 7 mi
- Worthington, Ohio: 88 rain days / yr, 7 mi
- Upper Arlington, Ohio: 87 rain days / yr, 7 mi
- Grandview Heights, Ohio: 87 rain days / yr, 11 mi
- Ostrander, Ohio: 87 rain days / yr, 11 mi
- Minerva Park, Ohio: 87 rain days / yr, 11 mi
Related guides
- AIA A201 Weather Delay Claims (ยง15.1.6.2): The Three Tests, With Real Numbers
- How Many Weather Days to Put in a Construction Schedule (Normal vs Plan-For)
- How to Document Weather Delays on a Construction Project (Checklist + Daily Log)
Method and source
A rain day is a day with at least 0.10 in (2.54 mm) in PRISM's daily estimate, which covers the 24 hours ending 12:00 UTC. Heavy days use 0.50 in. Normals are 1991-2020 averages. Records run from 1981 to the last complete month. Figures are for the 4 km cell containing the Census point for Dublin (40.113304, -83.145774). Data through 2026-11-24; page updated 2026-11-25. How we count rain days.
Source: PRISM Group, Oregon State University, https://prism.oregonstate.edu. These are gridded estimates, not gauge readings; conditions at a particular site can differ.