Rain days in Weldon, North Carolina
Weldon averages 83 rain days a year, counting days with at least 0.10 in of precipitation in the PRISM 4 km grid cell that contains it (1991-2020 normals). July is the wettest month at 8.7 rain days and October the driest at 4.9. That is close to the North Carolina median of 84.
Quick answers
How many rain days does Weldon get a year?
About 83: that many days in a normal year bring 0.10 in or more of rain or melted snow. That makes Weldon the 162nd wettest of 330 North Carolina cities and towns.
What is the wettest month in Weldon?
July, with 8.7 rain days in a normal year. To cover 9 years in 10, plan for 11.
What is the driest month?
October, with 4.9 rain days (plan for 7).
How many heavy-rain days does Weldon get?
32 a year with 0.50 in or more, most often in July (3.6).
Why these counts are lower than some weather sites': a rain day here means 0.10 in or more. Counts based on 0.01 in (NOAA's "days with precipitation") or 0.04 in (WeatherSpark) also include drizzle and trace days.
Rain days by month
The wettest three months are June-August, with 24.3 rain days combined; the driest are September-November, with 17.3. June swings the most from year to year: it averages 8.2 rain days, but covering 9 years in 10 takes 12. The most rain days in a single month since 1981 was 17, in June 1995.
| Month | Normal rain days | Plan for 9 of 10 yrs |
Heavy days ≥ 0.50 in |
Precip (in) | Record (year) |
|---|---|---|---|---|---|
| January | 7.3 | 10 | 2.7 | 3.60 | 13 (1982) |
| February | 6.1 | 9 | 1.8 | 2.77 | 12 (2021) |
| March | 7.5 | 10 | 3.0 | 4.17 | 15 (1989) |
| April | 7.2 | 11 | 2.3 | 3.67 | 13 (2000) |
| May | 6.9 | 10 | 2.4 | 3.62 | 12 (2018) |
| June | 8.2 | 12 | 2.7 | 4.50 | 17 (1995) |
| July | 8.7 | 11 | 3.6 | 5.38 | 17 (1994) |
| August | 7.4 | 11 | 3.3 | 4.86 | 14 (1992) |
| September | 6.7 | 10 | 3.1 | 5.25 | 12 (2009) |
| October | 4.9 | 7 | 2.2 | 3.62 | 9 (1993) |
| November | 5.7 | 8 | 2.4 | 3.33 | 11 (2009) |
| December | 6.7 | 9 | 2.4 | 3.53 | 11 (2009) |
| Year | 83.1 | 31.9 | 48.29 |
Rain day: at least 0.10 in. Plan for: the 90th percentile of 1991-2020 yearly counts, rounded up to a whole day. Record: 1981 to date.
The last 12 months vs normal
From November 2025 through October 2026, Weldon had 64 rain days against a normal of 83.3: a dry stretch, 19.3 days below normal. 3 of 12 months came in above normal and 9 below. The biggest departure was November 2025, with 1 rain days against a normal of 5.7. Precipitation totaled 32.58 in against 48.30 in normally.
| Month | Rain days | Normal | Difference | Precip (in) | Normal (in) |
|---|---|---|---|---|---|
| Nov 2025 | 1 | 5.7 | -4.7 | 0.84 | 3.33 |
| Dec 2025 | 6 | 6.7 | -0.7 | 1.92 | 3.53 |
| Jan 2026 | 3 | 7.3 | -4.3 | 1.42 | 3.60 |
| Feb 2026 | 6 | 6.1 | -0.1 | 3.11 | 2.77 |
| Mar 2026 | 4 | 7.5 | -3.5 | 2.05 | 4.17 |
| Apr 2026 | 3 | 7.2 | -4.2 | 1.20 | 3.67 |
| May 2026 | 8 | 6.9 | +1.1 | 5.50 | 3.62 |
| Jun 2026 | 6 | 8.2 | -2.2 | 2.50 | 4.50 |
| Jul 2026 | 12 | 8.7 | +3.3 | 6.50 | 5.38 |
| Aug 2026 | 4 | 7.4 | -3.4 | 0.98 | 4.86 |
| Sep 2026 | 6 | 6.7 | -0.7 | 4.71 | 5.25 |
| Oct 2026 | 5 | 4.9 | +0.1 | 1.85 | 3.62 |
Weldon rain days month by month
Against the median North Carolina location, Weldon gets more rain days in April and fewer in August, by half a day or more; other months are within half a day.
Rain days in January
Weldon averages 7.3 rain days in January, 2.7 of them heavy, with 3.60 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 13 (1982). January 2026 had 3, 4.3 below normal.
Rain days in February
Weldon averages 6.1 rain days in February, 1.8 of them heavy, with 2.77 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 12 (2021). February 2026 had 6, right on normal.
Rain days in March
Weldon averages 7.5 rain days in March, 3.0 of them heavy, with 4.17 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 15 (1989). March 2026 had 4, 3.5 below normal.
Rain days in April
Weldon averages 7.2 rain days in April, 2.3 of them heavy, with 3.67 in of precipitation. Plan for 11 to cover 9 years in 10; the record is 13 (2000). That is 0.6 more than the median North Carolina location (6.6). April 2026 had 3, 4.2 below normal.
Rain days in May
Weldon averages 6.9 rain days in May, 2.4 of them heavy, with 3.62 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 12 (2018). May 2026 had 8, 1.1 above normal.
Rain days in June
Weldon averages 8.2 rain days in June, 2.7 of them heavy, with 4.50 in of precipitation. Plan for 12 to cover 9 years in 10; the record is 17 (1995). June 2026 had 6, 2.2 below normal.
Rain days in July
Weldon averages 8.7 rain days in July, 3.6 of them heavy, with 5.38 in of precipitation. Plan for 11 to cover 9 years in 10; the record is 17 (1994). July 2026 had 12, 3.3 above normal.
Rain days in August
Weldon averages 7.4 rain days in August, 3.3 of them heavy, with 4.86 in of precipitation. Plan for 11 to cover 9 years in 10; the record is 14 (1992). That is 0.8 fewer than the median North Carolina location (8.2). August 2026 had 4, 3.4 below normal.
Rain days in September
Weldon averages 6.7 rain days in September, 3.1 of them heavy, with 5.25 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 12 (2009). September 2026 had 6, 0.7 below normal.
Rain days in October
Weldon averages 4.9 rain days in October, 2.2 of them heavy, with 3.62 in of precipitation. Plan for 7 to cover 9 years in 10; the record is 9 (1993). October 2026 had 5, right on normal.
Rain days in November
Weldon averages 5.7 rain days in November, 2.4 of them heavy, with 3.33 in of precipitation. Plan for 8 to cover 9 years in 10; the record is 11 (2009). November 2025 had 1, 4.7 below normal.
Rain days in December
Weldon averages 6.7 rain days in December, 2.4 of them heavy, with 3.53 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 11 (2009). December 2025 had 6, 0.7 below normal.
Using these numbers in a construction schedule
For Weldon, the normal column is the expected count: 83 days over a full year, 50 of them from April through October. Put those days in the schedule as non-work days or float before the job starts, not after it slips.
Average or plan-for? An average is exceeded about half the time. If July work has no float, carry 11 weather days for it rather than 8.7: Weldon had that many or fewer in 9 of 10 years from 1991 to 2020. Use the normals across a long job and the plan-for figure only for months on the critical path.
Heavy days. Weldon averages 32 days a year with 0.50 in or more, most often in July (3.6). Those are the days most likely to stop earthwork, paving and concrete outright.
Claiming time for abnormal weather. Under AIA A201-2017 §15.1.6.2, a claim for extra time because of adverse weather has to show the conditions were abnormal for the period, could not have been reasonably anticipated, and had an adverse effect on the scheduled work. The normals above show what could be anticipated in Weldon; the claim also needs the day-by-day record for your site and dates.
Price a rain-day report for a site in Weldon. Enter your dates to see actual rain days against this normal for free. The full PDF ($99) adds the daily record, a month-by-month comparison and a method statement you can attach to a schedule update or claim.
Check rain days near WeldonNearby
Weldon is in Halifax County, which averages 84 rain days a year across the county. The two numbers are close but measure different things: the county figure averages all 109 of the county's grid cells, while Weldon's is the single 4 km cell at its Census point. A site elsewhere in Halifax County can differ from both.
The nearest larger city, Rocky Mount (33 mi away), averages 81 rain days a year: Weldon gets 2 more.
Closest other areas in North Carolina:
- Roanoke Rapids, North Carolina: 80 rain days / yr, 3 mi
- Northampton County, North Carolina: 85 rain days / yr, 12 mi
- Halifax County, North Carolina: 84 rain days / yr, 12 mi
- Enfield, North Carolina: 81 rain days / yr, 17 mi
- Scotland Neck, North Carolina: 78 rain days / yr, 23 mi
- Warren County, North Carolina: 83 rain days / yr, 27 mi
- Murfreesboro, North Carolina: 80 rain days / yr, 29 mi
- Red Oak, North Carolina: 84 rain days / yr, 30 mi
All North Carolina cities and counties
Related guides
- AIA A201 Weather Delay Claims (ยง15.1.6.2): The Three Tests, With Real Numbers
- How Many Weather Days to Put in a Construction Schedule (Normal vs Plan-For)
- How to Document Weather Delays on a Construction Project (Checklist + Daily Log)
Method and source
A rain day is a day with at least 0.10 in (2.54 mm) in PRISM's daily estimate, which covers the 24 hours ending 12:00 UTC. Heavy days use 0.50 in. Normals are 1991-2020 averages. Records run from 1981 to the last complete month. Figures are for the 4 km cell containing the Census point for Weldon (36.424005, -77.612894). Data through 2026-11-24; page updated 2026-11-25. How we count rain days.