RainDayRecord

Rain days in Leland, North Carolina

Leland averages 88 rain days a year, counting days with at least 0.10 in of precipitation in the PRISM 4 km grid cell that contains it (1991-2020 normals). August is the wettest month at 10.8 rain days and November the driest at 5.3. That is 5 more than the median North Carolina location (84).

Quick answers

How many rain days does Leland get a year?

About 88: that many days in a normal year bring 0.10 in or more of rain or melted snow. That makes Leland the 45th wettest of 330 North Carolina cities and towns.

What is the wettest month in Leland?

August, with 10.8 rain days in a normal year. To cover 9 years in 10, plan for 14.

What is the driest month?

November, with 5.3 rain days (plan for 9).

How many heavy-rain days does Leland get?

37 a year with 0.50 in or more, most often in July (5.0).

Why these counts are lower than some weather sites': a rain day here means 0.10 in or more. Counts based on 0.01 in (NOAA's "days with precipitation") or 0.04 in (WeatherSpark) also include drizzle and trace days.

Rain days by month

The wettest three months are June-August, with 29.9 rain days combined; the driest are October-December, with 17.6. June swings the most from year to year: it averages 8.7 rain days, but covering 9 years in 10 takes 13. The most rain days in a single month since 1981 was 18, in August 2012.

051015JanFebMarAprMayJunJulAugSepOctNovDec
Month Normal rain days Plan for
9 of 10 yrs
Heavy days
≥ 0.50 in
Precip (in) Record (year)
January 7.0 11 2.7 3.87 13 (1994)
February 6.3 10 1.9 3.56 11 (2021)
March 6.6 9 2.9 4.14 11 (1996)
April 5.7 8 2.3 3.34 11 (1989)
May 6.9 10 2.4 4.15 12 (2020)
June 8.7 13 3.6 5.12 16 (2013)
July 10.4 14 5.0 7.21 17 (2024)
August 10.8 14 4.7 7.72 18 (2012)
September 8.1 12 4.3 8.81 14 (1997)
October 5.7 9 2.6 4.88 12 (2015)
November 5.3 9 2.2 3.76 11 (1992)
December 6.6 10 2.6 3.82 11 (1997)
Year 88.1 37.4 60.40

Rain day: at least 0.10 in. Plan for: the 90th percentile of 1991-2020 yearly counts, rounded up to a whole day. Record: 1981 to date.

The last 12 months vs normal

From November 2025 through October 2026, Leland had 75 rain days against a normal of 88.1: a dry stretch, 13.1 days below normal. 4 of 12 months came in above normal and 8 below. The biggest departure was March 2026, with 2 rain days against a normal of 6.6. Precipitation totaled 45.59 in against 60.38 in normally.

MonthRain daysNormalDifferencePrecip (in)Normal (in)
Nov 2025 3 5.3 -2.3 1.38 3.76
Dec 2025 6 6.6 -0.6 3.56 3.82
Jan 2026 3 7.0 -4.0 1.39 3.87
Feb 2026 6 6.3 -0.3 3.24 3.56
Mar 2026 2 6.6 -4.6 2.73 4.14
Apr 2026 2 5.7 -3.7 0.94 3.34
May 2026 10 6.9 +3.1 4.33 4.15
Jun 2026 6 8.7 -2.7 1.63 5.12
Jul 2026 12 10.4 +1.6 7.34 7.21
Aug 2026 15 10.8 +4.2 11.90 7.72
Sep 2026 4 8.1 -4.1 3.46 8.81
Oct 2026 6 5.7 +0.3 3.69 4.88

Leland rain days month by month

Against the median North Carolina location, Leland gets more rain days in June, July, August, September and October and fewer in March and April, by half a day or more; other months are within half a day.

Rain days in January

Leland averages 7.0 rain days in January, 2.7 of them heavy, with 3.87 in of precipitation. Plan for 11 to cover 9 years in 10; the record is 13 (1994). January 2026 had 3, 4.0 below normal.

Rain days in February

Leland averages 6.3 rain days in February, 1.9 of them heavy, with 3.56 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 11 (2021). February 2026 had 6, right on normal.

Rain days in March

Leland averages 6.6 rain days in March, 2.9 of them heavy, with 4.14 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 11 (1996). That is 0.5 fewer than the median North Carolina location (7.1). March 2026 had 2, 4.6 below normal.

Rain days in April

Leland averages 5.7 rain days in April, 2.3 of them heavy, with 3.34 in of precipitation. Plan for 8 to cover 9 years in 10; the record is 11 (1989). That is 0.9 fewer than the median North Carolina location (6.6). April 2026 had 2, 3.7 below normal.

Rain days in May

Leland averages 6.9 rain days in May, 2.4 of them heavy, with 4.15 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 12 (2020). May 2026 had 10, 3.1 above normal.

Rain days in June

Leland averages 8.7 rain days in June, 3.6 of them heavy, with 5.12 in of precipitation. Plan for 13 to cover 9 years in 10; the record is 16 (2013). That is 0.5 more than the median North Carolina location (8.2). June 2026 had 6, 2.7 below normal.

Rain days in July

Leland averages 10.4 rain days in July, 5.0 of them heavy, with 7.21 in of precipitation. Plan for 14 to cover 9 years in 10; the record is 17 (2024). That is 1.3 more than the median North Carolina location (9.1). July 2026 had 12, 1.6 above normal.

Rain days in August

Leland averages 10.8 rain days in August, 4.7 of them heavy, with 7.72 in of precipitation. Plan for 14 to cover 9 years in 10; the record is 18 (2012). That is 2.6 more than the median North Carolina location (8.2). August 2026 had 15, 4.2 above normal.

Rain days in September

Leland averages 8.1 rain days in September, 4.3 of them heavy, with 8.81 in of precipitation. Plan for 12 to cover 9 years in 10; the record is 14 (1997). That is 1.4 more than the median North Carolina location (6.7). September 2026 had 4, 4.1 below normal.

Rain days in October

Leland averages 5.7 rain days in October, 2.6 of them heavy, with 4.88 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 12 (2015). That is 0.7 more than the median North Carolina location (5.0). October 2026 had 6, right on normal.

Rain days in November

Leland averages 5.3 rain days in November, 2.2 of them heavy, with 3.76 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 11 (1992). November 2025 had 3, 2.3 below normal.

Rain days in December

Leland averages 6.6 rain days in December, 2.6 of them heavy, with 3.82 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 11 (1997). December 2025 had 6, 0.6 below normal.

Using these numbers in a construction schedule

For Leland, the normal column is the expected count: 88 days over a full year, 56 of them from April through October. Put those days in the schedule as non-work days or float before the job starts, not after it slips.

Average or plan-for? An average is exceeded about half the time. If August work has no float, carry 14 weather days for it rather than 10.8: Leland had that many or fewer in 9 of 10 years from 1991 to 2020. Use the normals across a long job and the plan-for figure only for months on the critical path.

Heavy days. Leland averages 37 days a year with 0.50 in or more, most often in July (5.0). Those are the days most likely to stop earthwork, paving and concrete outright.

Claiming time for abnormal weather. Under AIA A201-2017 §15.1.6.2, a claim for extra time because of adverse weather has to show the conditions were abnormal for the period, could not have been reasonably anticipated, and had an adverse effect on the scheduled work. The normals above show what could be anticipated in Leland; the claim also needs the day-by-day record for your site and dates.

Price a rain-day report for a site in Leland. Enter your dates to see actual rain days against this normal for free. The full PDF ($99) adds the daily record, a month-by-month comparison and a method statement you can attach to a schedule update or claim.

Check rain days near Leland

What the weather delay claim report includes

Nearby

Leland is in Brunswick County, which averages 85 rain days a year across the county. Leland gets 3 more rain days a year than that county-wide average.

The nearest larger city, Wilmington (9 mi away), averages 86 rain days a year: Leland gets 2 more.

Closest other areas in North Carolina:

All North Carolina cities and counties

Related guides

Method and source

A rain day is a day with at least 0.10 in (2.54 mm) in PRISM's daily estimate, which covers the 24 hours ending 12:00 UTC. Heavy days use 0.50 in. Normals are 1991-2020 averages. Records run from 1981 to the last complete month. Figures are for the 4 km cell containing the Census point for Leland (34.214676, -78.04337). Data through 2026-11-24; page updated 2026-11-25. How we count rain days.

Source: PRISM Group, Oregon State University, https://prism.oregonstate.edu. These are gridded estimates, not gauge readings; conditions at a particular site can differ.