Lawnside averages 84 rain days a year, counting days with at least 0.10 in of precipitation in the PRISM 4 km grid cell that contains it (1991-2020 normals). June is the wettest month at 8.0 rain days and November the driest at 5.9. That is close to the New Jersey median of 83.

Lawnside shares its 4 km grid cell with Haddonfield, New Jersey, so its figures are the same.

Quick answers

How many rain days does Lawnside get a year?

About 84: that many days in a normal year bring 0.10 in or more of rain or melted snow. That makes Lawnside the 64th wettest of 224 New Jersey cities and towns.

What is the wettest month in Lawnside?

June, with 8.0 rain days in a normal year. To cover 9 years in 10, plan for 12.

What is the driest month?

November, with 5.9 rain days (plan for 8).

How many heavy-rain days does Lawnside get?

33 a year with 0.50 in or more, most often in March (3.4).

Why these counts are lower than some weather sites': a rain day here means 0.10 in or more. Counts based on 0.01 in (NOAA's "days with precipitation") or 0.04 in (WeatherSpark) also include drizzle and trace days.

Rain days by month

The wettest three months are May-July, with 23.1 rain days combined; the driest are September-November, with 18.6. June is also the least predictable month, with the widest gap between its average and its plan-for number. The most rain days in a single month since 1981 was 15, in August 2011.

051015JanFebMarAprMayJunJulAugSepOctNovDec
Month Normal rain days Plan for
9 of 10 yrs
Heavy days
≥ 0.50 in
Precip (in) Record (year)
January 7.3 10 2.5 3.63 12 (2006)
February 6.2 10 1.9 2.88 12 (2018)
March 7.7 10 3.4 4.51 12 (1993)
April 7.1 11 2.6 3.72 12 (2009)
May 7.7 11 2.5 3.63 13 (1996)
June 8.0 12 3.2 4.40 14 (2013)
July 7.4 10 3.0 4.55 13 (1996)
August 6.9 10 3.2 4.70 15 (2011)
September 6.5 9 2.5 4.09 13 (1993)
October 6.2 9 2.7 3.93 11 (2005)
November 5.9 8 2.4 3.22 10 (2014)
December 7.4 11 3.2 4.41 13 (2007)
Year 84.2 33.2 47.67

Rain day: at least 0.10 in. Plan for: the 90th percentile of 1991-2020 yearly counts, rounded up to a whole day. Record: 1981 to date.

The last 12 months vs normal

From November 2025 through October 2026, Lawnside had 77 rain days against a normal of 84.3: a dry stretch, 7.3 days below normal. 5 of 12 months came in above normal and 7 below. The biggest departure was September 2026, with 11 rain days against a normal of 6.5. Precipitation totaled 44.50 in against 47.67 in normally.

MonthRain daysNormalDifferencePrecip (in)Normal (in)
Nov 2025 6 5.9 +0.1 2.30 3.22
Dec 2025 6 7.4 -1.4 3.66 4.41
Jan 2026 5 7.3 -2.3 3.24 3.63
Feb 2026 4 6.2 -2.2 2.37 2.88
Mar 2026 8 7.7 +0.3 2.23 4.51
Apr 2026 4 7.1 -3.1 2.42 3.72
May 2026 7 7.7 -0.7 3.25 3.63
Jun 2026 6 8.0 -2.0 2.44 4.40
Jul 2026 8 7.4 +0.6 7.18 4.55
Aug 2026 8 6.9 +1.1 5.26 4.70
Sep 2026 11 6.5 +4.5 6.80 4.09
Oct 2026 4 6.2 -2.2 3.35 3.93

Lawnside rain days month by month

Against the median New Jersey location, Lawnside gets more rain days in January, by half a day or more; other months are within half a day.

Rain days in January

Lawnside averages 7.3 rain days in January, 2.5 of them heavy, with 3.63 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 12 (2006). That is 0.5 more than the median New Jersey location (6.8). January 2026 had 5, 2.3 below normal.

Rain days in February

Lawnside averages 6.2 rain days in February, 1.9 of them heavy, with 2.88 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 12 (2018). February 2026 had 4, 2.2 below normal.

Rain days in March

Lawnside averages 7.7 rain days in March, 3.4 of them heavy, with 4.51 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 12 (1993). March 2026 had 8, right on normal.

Rain days in April

Lawnside averages 7.1 rain days in April, 2.6 of them heavy, with 3.72 in of precipitation. Plan for 11 to cover 9 years in 10; the record is 12 (2009). April 2026 had 4, 3.1 below normal.

Rain days in May

Lawnside averages 7.7 rain days in May, 2.5 of them heavy, with 3.63 in of precipitation. Plan for 11 to cover 9 years in 10; the record is 13 (1996). May 2026 had 7, 0.7 below normal.

Rain days in June

Lawnside averages 8.0 rain days in June, 3.2 of them heavy, with 4.40 in of precipitation. Plan for 12 to cover 9 years in 10; the record is 14 (2013). June 2026 had 6, 2.0 below normal.

Rain days in July

Lawnside averages 7.4 rain days in July, 3.0 of them heavy, with 4.55 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 13 (1996). July 2026 had 8, 0.6 above normal.

Rain days in August

Lawnside averages 6.9 rain days in August, 3.2 of them heavy, with 4.70 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 15 (2011). August 2026 had 8, 1.1 above normal.

Rain days in September

Lawnside averages 6.5 rain days in September, 2.5 of them heavy, with 4.09 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 13 (1993). September 2026 had 11, 4.5 above normal.

Rain days in October

Lawnside averages 6.2 rain days in October, 2.7 of them heavy, with 3.93 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 11 (2005). October 2026 had 4, 2.2 below normal.

Rain days in November

Lawnside averages 5.9 rain days in November, 2.4 of them heavy, with 3.22 in of precipitation. Plan for 8 to cover 9 years in 10; the record is 10 (2014). November 2025 had 6, right on normal.

Rain days in December

Lawnside averages 7.4 rain days in December, 3.2 of them heavy, with 4.41 in of precipitation. Plan for 11 to cover 9 years in 10; the record is 13 (2007). December 2025 had 6, 1.4 below normal.

Using these numbers in a construction schedule

For Lawnside, the normal column is the expected count: 84 days over a full year, 50 of them from April through October. Put those days in the schedule as non-work days or float before the job starts, not after it slips.

Average or plan-for? An average is exceeded about half the time. If June work has no float, carry 12 weather days for it rather than 8.0: Lawnside had that many or fewer in 9 of 10 years from 1991 to 2020. Use the normals across a long job and the plan-for figure only for months on the critical path.

Heavy days. Lawnside averages 33 days a year with 0.50 in or more, most often in March (3.4). Those are the days most likely to stop earthwork, paving and concrete outright.

Claiming time for abnormal weather. Under AIA A201-2017 §15.1.6.2, a claim for extra time because of adverse weather has to show the conditions were abnormal for the period, could not have been reasonably anticipated, and had an adverse effect on the scheduled work. The normals above show what could be anticipated in Lawnside; the claim also needs the day-by-day record for your site and dates.

Price a rain-day report for a site in Lawnside. Enter your dates to see actual rain days against this normal for free. The full PDF ($99) adds the daily record, a month-by-month comparison and a method statement you can attach to a schedule update or claim.

Check rain days near Lawnside

What the weather delay claim report includes

Nearby

Lawnside is in Camden County, which averages 85 rain days a year across the county.

The nearest larger city, Camden (6 mi away), averages 85 rain days a year, about the same as Lawnside.

Closest other areas in New Jersey:

All New Jersey cities and counties

Related guides

Method and source

A rain day is a day with at least 0.10 in (2.54 mm) in PRISM's daily estimate, which covers the 24 hours ending 12:00 UTC. Heavy days use 0.50 in. Normals are 1991-2020 averages. Records run from 1981 to the last complete month. Figures are for the 4 km cell containing the Census point for Lawnside (39.867308, -75.028903). Data through 2026-11-24; page updated 2026-11-25. How we count rain days.

Source: PRISM Group, Oregon State University, https://prism.oregonstate.edu. These are gridded estimates, not gauge readings; conditions at a particular site can differ.