RainDayRecord

Rain days in Baker, Montana

Baker averages 37 rain days a year, counting days with at least 0.10 in of precipitation in the PRISM 4 km grid cell that contains it (1991-2020 normals). June is the wettest month at 6.4 rain days and January the driest at 0.8. That is 5 fewer than the median Montana location (43).

Quick answers

How many rain days does Baker get a year?

About 37: that many days in a normal year bring 0.10 in or more of rain or melted snow. That makes Baker the 36th wettest of 55 Montana cities and towns.

What is the wettest month in Baker?

June, with 6.4 rain days in a normal year. To cover 9 years in 10, plan for 10.

What is the driest month?

January, with 0.8 rain days (plan for 2).

How many heavy-rain days does Baker get?

7 a year with 0.50 in or more, most often in June (1.7).

Why these counts are lower than some weather sites': a rain day here means 0.10 in or more. Counts based on 0.01 in (NOAA's "days with precipitation") or 0.04 in (WeatherSpark) also include drizzle and trace days.

Rain days by month

The wettest three months are May-July, with 17.3 rain days combined; the driest are December-February, with 2.9. September swings the most from year to year: it averages 3.4 rain days, but covering 9 years in 10 takes 7. The most rain days in a single month since 1981 was 15, in June 2005.

0510JanFebMarAprMayJunJulAugSepOctNovDec
Month Normal rain days Plan for
9 of 10 yrs
Heavy days
≥ 0.50 in
Precip (in) Record (year)
January 0.8 2 0.0 0.36 4 (2011)
February 0.9 2 0.0 0.35 5 (1998)
March 1.8 4 0.2 0.61 6 (1982)
April 3.8 6 0.7 1.38 8 (2022)
May 6.0 9 1.5 2.55 14 (2011)
June 6.4 10 1.7 2.88 15 (2005)
July 4.9 8 0.9 1.88 15 (1993)
August 3.5 6 0.6 1.34 9 (2014)
September 3.4 7 0.9 1.44 10 (1986)
October 3.5 6 0.5 1.26 8 (2013)
November 1.1 2 0.0 0.47 4 (1985)
December 1.2 3 0.0 0.39 4 (2022)
Year 37.4 7.0 14.90

Rain day: at least 0.10 in. Plan for: the 90th percentile of 1991-2020 yearly counts, rounded up to a whole day. Record: 1981 to date.

The last 12 months vs normal

From November 2025 through October 2026, Baker had 28 rain days against a normal of 37.3: a dry stretch, 9.3 days below normal. 5 of 12 months came in above normal and 7 below. The biggest departure was May 2026, with 2 rain days against a normal of 6.0. Precipitation totaled 9.46 in against 14.91 in normally.

MonthRain daysNormalDifferencePrecip (in)Normal (in)
Nov 2025 3 1.1 +1.9 0.84 0.47
Dec 2025 3 1.2 +1.8 1.23 0.39
Jan 2026 0 0.8 -0.8 0.30 0.36
Feb 2026 1 0.9 +0.1 0.30 0.35
Mar 2026 1 1.8 -0.8 0.32 0.61
Apr 2026 4 3.8 +0.2 1.25 1.38
May 2026 2 6.0 -4.0 0.63 2.55
Jun 2026 7 6.4 +0.6 2.03 2.88
Jul 2026 2 4.9 -2.9 0.66 1.88
Aug 2026 1 3.5 -2.5 0.46 1.34
Sep 2026 2 3.4 -1.4 0.85 1.44
Oct 2026 2 3.5 -1.5 0.59 1.26

Baker rain days month by month

Against the median Montana location, Baker gets more rain days in July and fewer in January, February, March, April, May, June, November and December, by half a day or more; other months are within half a day.

Rain days in January

Baker averages 0.8 rain days in January, 0.0 of them heavy, with 0.36 in of precipitation. Plan for 2 to cover 9 years in 10; the record is 4 (2011). That is 1.0 fewer than the median Montana location (1.8). January 2026 had 0, 0.8 below normal.

Rain days in February

Baker averages 0.9 rain days in February, 0.0 of them heavy, with 0.35 in of precipitation. Plan for 2 to cover 9 years in 10; the record is 5 (1998). That is 0.9 fewer than the median Montana location (1.8). February 2026 had 1, right on normal.

Rain days in March

Baker averages 1.8 rain days in March, 0.2 of them heavy, with 0.61 in of precipitation. Plan for 4 to cover 9 years in 10; the record is 6 (1982). That is 0.9 fewer than the median Montana location (2.7). March 2026 had 1, 0.8 below normal.

Rain days in April

Baker averages 3.8 rain days in April, 0.7 of them heavy, with 1.38 in of precipitation. Plan for 6 to cover 9 years in 10; the record is 8 (2022). That is 0.8 fewer than the median Montana location (4.6). April 2026 had 4, right on normal.

Rain days in May

Baker averages 6.0 rain days in May, 1.5 of them heavy, with 2.55 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 14 (2011). That is 0.5 fewer than the median Montana location (6.5). May 2026 had 2, 4.0 below normal.

Rain days in June

Baker averages 6.4 rain days in June, 1.7 of them heavy, with 2.88 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 15 (2005). That is 0.6 fewer than the median Montana location (7.0). June 2026 had 7, 0.6 above normal.

Rain days in July

Baker averages 4.9 rain days in July, 0.9 of them heavy, with 1.88 in of precipitation. Plan for 8 to cover 9 years in 10; the record is 15 (1993). That is 0.6 more than the median Montana location (4.3). July 2026 had 2, 2.9 below normal.

Rain days in August

Baker averages 3.5 rain days in August, 0.6 of them heavy, with 1.34 in of precipitation. Plan for 6 to cover 9 years in 10; the record is 9 (2014). August 2026 had 1, 2.5 below normal.

Rain days in September

Baker averages 3.4 rain days in September, 0.9 of them heavy, with 1.44 in of precipitation. Plan for 7 to cover 9 years in 10; the record is 10 (1986). September 2026 had 2, 1.4 below normal.

Rain days in October

Baker averages 3.5 rain days in October, 0.5 of them heavy, with 1.26 in of precipitation. Plan for 6 to cover 9 years in 10; the record is 8 (2013). October 2026 had 2, 1.5 below normal.

Rain days in November

Baker averages 1.1 rain days in November, 0.0 of them heavy, with 0.47 in of precipitation. Plan for 2 to cover 9 years in 10; the record is 4 (1985). That is 1.1 fewer than the median Montana location (2.2). November 2025 had 3, 1.9 above normal.

Rain days in December

Baker averages 1.2 rain days in December, 0.0 of them heavy, with 0.39 in of precipitation. Plan for 3 to cover 9 years in 10; the record is 4 (2022). That is 0.7 fewer than the median Montana location (1.9). December 2025 had 3, 1.8 above normal.

Using these numbers in a construction schedule

For Baker, the normal column is the expected count: 37 days over a full year, 32 of them from April through October. Put those days in the schedule as non-work days or float before the job starts, not after it slips.

Average or plan-for? An average is exceeded about half the time. If June work has no float, carry 10 weather days for it rather than 6.4: Baker had that many or fewer in 9 of 10 years from 1991 to 2020. Use the normals across a long job and the plan-for figure only for months on the critical path.

Heavy days. Baker averages 7 days a year with 0.50 in or more, most often in June (1.7). Those are the days most likely to stop earthwork, paving and concrete outright.

Claiming time for abnormal weather. Under AIA A201-2017 §15.1.6.2, a claim for extra time because of adverse weather has to show the conditions were abnormal for the period, could not have been reasonably anticipated, and had an adverse effect on the scheduled work. The normals above show what could be anticipated in Baker; the claim also needs the day-by-day record for your site and dates.

Price a rain-day report for a site in Baker. Enter your dates to see actual rain days against this normal for free. The full PDF ($99) adds the daily record, a month-by-month comparison and a method statement you can attach to a schedule update or claim.

Check rain days near Baker

What the weather delay claim report includes

Nearby

Baker is in Fallon County, which averages 40 rain days a year across the county. Baker gets 2 fewer rain days a year than that county-wide average.

The nearest larger city, Billings (209 mi away), averages 40 rain days a year: Baker gets 2 fewer.

Closest other areas in Montana:

All Montana cities and counties

Related guides

Method and source

A rain day is a day with at least 0.10 in (2.54 mm) in PRISM's daily estimate, which covers the 24 hours ending 12:00 UTC. Heavy days use 0.50 in. Normals are 1991-2020 averages. Records run from 1981 to the last complete month. Figures are for the 4 km cell containing the Census point for Baker (46.364871, -104.27332). Data through 2026-11-24; page updated 2026-11-25. How we count rain days.

Source: PRISM Group, Oregon State University, https://prism.oregonstate.edu. These are gridded estimates, not gauge readings; conditions at a particular site can differ.