Corinth averages 91 rain days a year, counting days with at least 0.10 in of precipitation in the PRISM 4 km grid cell that contains it (1991-2020 normals). March is the wettest month at 8.8 rain days and September the driest at 5.4. That is 5 more than the median Mississippi location (86).

Quick answers

How many rain days does Corinth get a year?

About 91: that many days in a normal year bring 0.10 in or more of rain or melted snow. That makes Corinth the 16th wettest of 149 Mississippi cities and towns.

What is the wettest month in Corinth?

March, with 8.8 rain days in a normal year. To cover 9 years in 10, plan for 11.

What is the driest month?

September, with 5.4 rain days (plan for 8).

How many heavy-rain days does Corinth get?

39 a year with 0.50 in or more, most often in December (4.2).

Why these counts are lower than some weather sites': a rain day here means 0.10 in or more. Counts based on 0.01 in (NOAA's "days with precipitation") or 0.04 in (WeatherSpark) also include drizzle and trace days.

Rain days by month

The wettest three months are March-May, with 25.1 rain days combined; the driest are September-November, with 17.9. October swings the most from year to year: it averages 5.9 rain days, but covering 9 years in 10 takes 10. The most rain days in a single month since 1981 was 18, in September 2009.

051015JanFebMarAprMayJunJulAugSepOctNovDec
Month Normal rain days Plan for
9 of 10 yrs
Heavy days
≥ 0.50 in
Precip (in) Record (year)
January 8.1 10 3.6 4.94 14 (1999)
February 8.0 12 3.4 5.29 15 (2018)
March 8.8 11 3.8 5.46 15 (2020)
April 8.0 10 3.8 5.61 15 (1998)
May 8.3 11 3.3 5.43 15 (2009)
June 8.2 11 3.4 4.86 17 (1997)
July 8.1 12 3.2 4.63 14 (1998)
August 7.3 10 2.5 4.01 13 (2001)
September 5.4 8 2.6 4.06 18 (2009)
October 5.9 10 2.7 4.05 12 (2021)
November 6.6 10 2.6 4.15 14 (1986)
December 8.4 12 4.2 5.95 14 (1998)
Year 91.1 38.9 58.43

Rain day: at least 0.10 in. Plan for: the 90th percentile of 1991-2020 yearly counts, rounded up to a whole day. Record: 1981 to date.

The last 12 months vs normal

From November 2025 through October 2026, Corinth had 58 rain days against a normal of 91.1: a dry stretch, 33.1 days below normal. 1 of 12 months came in above normal and 11 below. The biggest departure was December 2025, with 4 rain days against a normal of 8.4. Precipitation totaled 37.99 in against 58.44 in normally.

MonthRain daysNormalDifferencePrecip (in)Normal (in)
Nov 2025 3 6.6 -3.6 3.15 4.15
Dec 2025 4 8.4 -4.4 1.92 5.95
Jan 2026 6 8.1 -2.1 5.23 4.94
Feb 2026 5 8.0 -3.0 1.28 5.29
Mar 2026 5 8.8 -3.8 4.28 5.46
Apr 2026 5 8.0 -3.0 4.45 5.61
May 2026 9 8.3 +0.7 4.60 5.43
Jun 2026 6 8.2 -2.2 6.09 4.86
Jul 2026 8 8.1 -0.1 2.69 4.63
Aug 2026 3 7.3 -4.3 2.24 4.01
Sep 2026 2 5.4 -3.4 0.60 4.06
Oct 2026 2 5.9 -3.9 1.46 4.05

Corinth rain days month by month

Against the median Mississippi location, Corinth gets more rain days in February, March, April, May, October, November and December and fewer in July, by half a day or more; other months are within half a day.

Rain days in January

Corinth averages 8.1 rain days in January, 3.6 of them heavy, with 4.94 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 14 (1999). January 2026 had 6, 2.1 below normal.

Rain days in February

Corinth averages 8.0 rain days in February, 3.4 of them heavy, with 5.29 in of precipitation. Plan for 12 to cover 9 years in 10; the record is 15 (2018). That is 0.6 more than the median Mississippi location (7.4). February 2026 had 5, 3.0 below normal.

Rain days in March

Corinth averages 8.8 rain days in March, 3.8 of them heavy, with 5.46 in of precipitation. Plan for 11 to cover 9 years in 10; the record is 15 (2020). That is 1.1 more than the median Mississippi location (7.7). March 2026 had 5, 3.8 below normal.

Rain days in April

Corinth averages 8.0 rain days in April, 3.8 of them heavy, with 5.61 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 15 (1998). That is 1.0 more than the median Mississippi location (7.0). April 2026 had 5, 3.0 below normal.

Rain days in May

Corinth averages 8.3 rain days in May, 3.3 of them heavy, with 5.43 in of precipitation. Plan for 11 to cover 9 years in 10; the record is 15 (2009). That is 1.1 more than the median Mississippi location (7.2). May 2026 had 9, 0.7 above normal.

Rain days in June

Corinth averages 8.2 rain days in June, 3.4 of them heavy, with 4.86 in of precipitation. Plan for 11 to cover 9 years in 10; the record is 17 (1997). June 2026 had 6, 2.2 below normal.

Rain days in July

Corinth averages 8.1 rain days in July, 3.2 of them heavy, with 4.63 in of precipitation. Plan for 12 to cover 9 years in 10; the record is 14 (1998). That is 0.5 fewer than the median Mississippi location (8.6). July 2026 had 8, right on normal.

Rain days in August

Corinth averages 7.3 rain days in August, 2.5 of them heavy, with 4.01 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 13 (2001). August 2026 had 3, 4.3 below normal.

Rain days in September

Corinth averages 5.4 rain days in September, 2.6 of them heavy, with 4.06 in of precipitation. Plan for 8 to cover 9 years in 10; the record is 18 (2009). September 2026 had 2, 3.4 below normal.

Rain days in October

Corinth averages 5.9 rain days in October, 2.7 of them heavy, with 4.05 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 12 (2021). That is 0.8 more than the median Mississippi location (5.1). October 2026 had 2, 3.9 below normal.

Rain days in November

Corinth averages 6.6 rain days in November, 2.6 of them heavy, with 4.15 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 14 (1986). That is 0.5 more than the median Mississippi location (6.1). November 2025 had 3, 3.6 below normal.

Rain days in December

Corinth averages 8.4 rain days in December, 4.2 of them heavy, with 5.95 in of precipitation. Plan for 12 to cover 9 years in 10; the record is 14 (1998). That is 0.7 more than the median Mississippi location (7.7). December 2025 had 4, 4.4 below normal.

Using these numbers in a construction schedule

For Corinth, the normal column is the expected count: 91 days over a full year, 51 of them from April through October. Put those days in the schedule as non-work days or float before the job starts, not after it slips.

Average or plan-for? An average is exceeded about half the time. If March work has no float, carry 11 weather days for it rather than 8.8: Corinth had that many or fewer in 9 of 10 years from 1991 to 2020. Use the normals across a long job and the plan-for figure only for months on the critical path.

Heavy days. Corinth averages 39 days a year with 0.50 in or more, most often in December (4.2). Those are the days most likely to stop earthwork, paving and concrete outright.

Claiming time for abnormal weather. Under AIA A201-2017 §15.1.6.2, a claim for extra time because of adverse weather has to show the conditions were abnormal for the period, could not have been reasonably anticipated, and had an adverse effect on the scheduled work. The normals above show what could be anticipated in Corinth; the claim also needs the day-by-day record for your site and dates.

Price a rain-day report for a site in Corinth. Enter your dates to see actual rain days against this normal for free. The full PDF ($99) adds the daily record, a month-by-month comparison and a method statement you can attach to a schedule update or claim.

Check rain days near Corinth

What the weather delay claim report includes

Nearby

Corinth is in Alcorn County, which averages 96 rain days a year across the county. Corinth gets 5 fewer rain days a year than that county-wide average.

The nearest larger city, Southaven (83 mi away), averages 85 rain days a year: Corinth gets 6 more.

Closest other areas in Mississippi:

All Mississippi cities and counties

Related guides

Method and source

A rain day is a day with at least 0.10 in (2.54 mm) in PRISM's daily estimate, which covers the 24 hours ending 12:00 UTC. Heavy days use 0.50 in. Normals are 1991-2020 averages. Records run from 1981 to the last complete month. Figures are for the 4 km cell containing the Census point for Corinth (34.948353, -88.513618). Data through 2026-11-24; page updated 2026-11-25. How we count rain days.

Source: PRISM Group, Oregon State University, https://prism.oregonstate.edu. These are gridded estimates, not gauge readings; conditions at a particular site can differ.