Rain days in Isanti, Minnesota
Isanti averages 66 rain days a year, counting days with at least 0.10 in of precipitation in the PRISM 4 km grid cell that contains it (1991-2020 normals). June is the wettest month at 8.8 rain days and February the driest at 2.5. That is close to the Minnesota median of 65.
Quick answers
How many rain days does Isanti get a year?
About 66: that many days in a normal year bring 0.10 in or more of rain or melted snow. That makes Isanti the 151st wettest of 351 Minnesota cities and towns.
What is the wettest month in Isanti?
June, with 8.8 rain days in a normal year. To cover 9 years in 10, plan for 12.
What is the driest month?
February, with 2.5 rain days (plan for 5).
How many heavy-rain days does Isanti get?
19 a year with 0.50 in or more, most often in June (2.8).
Why these counts are lower than some weather sites': a rain day here means 0.10 in or more. Counts based on 0.01 in (NOAA's "days with precipitation") or 0.04 in (WeatherSpark) also include drizzle and trace days.
Rain days by month
The wettest three months are May-July, with 23.7 rain days combined; the driest are December-February, with 8.4. April swings the most from year to year: it averages 6.7 rain days, but covering 9 years in 10 takes 11. The most rain days in a single month since 1981 was 15, in June 2024.
| Month | Normal rain days | Plan for 9 of 10 yrs |
Heavy days ≥ 0.50 in |
Precip (in) | Record (year) |
|---|---|---|---|---|---|
| January | 2.6 | 5 | 0.1 | 0.78 | 7 (1999) |
| February | 2.5 | 5 | 0.3 | 0.84 | 9 (2019) |
| March | 4.1 | 6 | 0.7 | 1.55 | 10 (2023) |
| April | 6.7 | 11 | 1.9 | 2.94 | 13 (2001) |
| May | 7.3 | 10 | 2.7 | 4.05 | 13 (2011) |
| June | 8.8 | 12 | 2.8 | 4.37 | 15 (2024) |
| July | 7.6 | 11 | 2.8 | 4.30 | 15 (1986) |
| August | 7.0 | 10 | 2.8 | 4.16 | 13 (2022) |
| September | 6.1 | 9 | 1.9 | 3.38 | 13 (2019) |
| October | 5.9 | 9 | 1.8 | 2.88 | 14 (2009) |
| November | 3.7 | 6 | 1.1 | 1.69 | 8 (1991) |
| December | 3.3 | 6 | 0.5 | 1.19 | 8 (2010) |
| Year | 65.5 | 19.3 | 32.15 |
Rain day: at least 0.10 in. Plan for: the 90th percentile of 1991-2020 yearly counts, rounded up to a whole day. Record: 1981 to date.
The last 12 months vs normal
From November 2025 through October 2026, Isanti had 55 rain days against a normal of 65.6: a dry stretch, 10.6 days below normal. 3 of 12 months came in above normal and 9 below. The biggest departure was May 2026, with 2 rain days against a normal of 7.3. Precipitation totaled 24.96 in against 32.13 in normally.
| Month | Rain days | Normal | Difference | Precip (in) | Normal (in) |
|---|---|---|---|---|---|
| Nov 2025 | 2 | 3.7 | -1.7 | 1.15 | 1.69 |
| Dec 2025 | 2 | 3.3 | -1.3 | 1.36 | 1.19 |
| Jan 2026 | 1 | 2.6 | -1.6 | 0.50 | 0.78 |
| Feb 2026 | 2 | 2.5 | -0.5 | 0.80 | 0.84 |
| Mar 2026 | 7 | 4.1 | +2.9 | 1.93 | 1.55 |
| Apr 2026 | 7 | 6.7 | +0.3 | 3.87 | 2.94 |
| May 2026 | 2 | 7.3 | -5.3 | 1.16 | 4.05 |
| Jun 2026 | 11 | 8.8 | +2.2 | 4.09 | 4.37 |
| Jul 2026 | 5 | 7.6 | -2.6 | 1.54 | 4.30 |
| Aug 2026 | 5 | 7.0 | -2.0 | 3.11 | 4.16 |
| Sep 2026 | 6 | 6.1 | -0.1 | 3.37 | 3.38 |
| Oct 2026 | 5 | 5.9 | -0.9 | 2.08 | 2.88 |
Isanti rain days month by month
Against the median Minnesota location, Isanti gets fewer in May, by half a day or more; other months are within half a day.
Rain days in January
Isanti averages 2.6 rain days in January, 0.1 of them heavy, with 0.78 in of precipitation. Plan for 5 to cover 9 years in 10; the record is 7 (1999). January 2026 had 1, 1.6 below normal.
Rain days in February
Isanti averages 2.5 rain days in February, 0.3 of them heavy, with 0.84 in of precipitation. Plan for 5 to cover 9 years in 10; the record is 9 (2019). February 2026 had 2, 0.5 below normal.
Rain days in March
Isanti averages 4.1 rain days in March, 0.7 of them heavy, with 1.55 in of precipitation. Plan for 6 to cover 9 years in 10; the record is 10 (2023). March 2026 had 7, 2.9 above normal.
Rain days in April
Isanti averages 6.7 rain days in April, 1.9 of them heavy, with 2.94 in of precipitation. Plan for 11 to cover 9 years in 10; the record is 13 (2001). April 2026 had 7, right on normal.
Rain days in May
Isanti averages 7.3 rain days in May, 2.7 of them heavy, with 4.05 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 13 (2011). That is 0.8 fewer than the median Minnesota location (8.1). May 2026 had 2, 5.3 below normal.
Rain days in June
Isanti averages 8.8 rain days in June, 2.8 of them heavy, with 4.37 in of precipitation. Plan for 12 to cover 9 years in 10; the record is 15 (2024). June 2026 had 11, 2.2 above normal.
Rain days in July
Isanti averages 7.6 rain days in July, 2.8 of them heavy, with 4.30 in of precipitation. Plan for 11 to cover 9 years in 10; the record is 15 (1986). July 2026 had 5, 2.6 below normal.
Rain days in August
Isanti averages 7.0 rain days in August, 2.8 of them heavy, with 4.16 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 13 (2022). August 2026 had 5, 2.0 below normal.
Rain days in September
Isanti averages 6.1 rain days in September, 1.9 of them heavy, with 3.38 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 13 (2019). September 2026 had 6, right on normal.
Rain days in October
Isanti averages 5.9 rain days in October, 1.8 of them heavy, with 2.88 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 14 (2009). October 2026 had 5, 0.9 below normal.
Rain days in November
Isanti averages 3.7 rain days in November, 1.1 of them heavy, with 1.69 in of precipitation. Plan for 6 to cover 9 years in 10; the record is 8 (1991). November 2025 had 2, 1.7 below normal.
Rain days in December
Isanti averages 3.3 rain days in December, 0.5 of them heavy, with 1.19 in of precipitation. Plan for 6 to cover 9 years in 10; the record is 8 (2010). December 2025 had 2, 1.3 below normal.
Using these numbers in a construction schedule
For Isanti, the normal column is the expected count: 66 days over a full year, 49 of them from April through October. Put those days in the schedule as non-work days or float before the job starts, not after it slips.
Average or plan-for? An average is exceeded about half the time. If June work has no float, carry 12 weather days for it rather than 8.8: Isanti had that many or fewer in 9 of 10 years from 1991 to 2020. Use the normals across a long job and the plan-for figure only for months on the critical path.
Heavy days. Isanti averages 19 days a year with 0.50 in or more, most often in June (2.8). Those are the days most likely to stop earthwork, paving and concrete outright.
Claiming time for abnormal weather. Under AIA A201-2017 §15.1.6.2, a claim for extra time because of adverse weather has to show the conditions were abnormal for the period, could not have been reasonably anticipated, and had an adverse effect on the scheduled work. The normals above show what could be anticipated in Isanti; the claim also needs the day-by-day record for your site and dates.
Price a rain-day report for a site in Isanti. Enter your dates to see actual rain days against this normal for free. The full PDF ($99) adds the daily record, a month-by-month comparison and a method statement you can attach to a schedule update or claim.
Check rain days near IsantiNearby
Isanti is in Isanti County, which averages 65 rain days a year across the county. The two numbers are close but measure different things: the county figure averages all 84 of the county's grid cells, while Isanti's is the single 4 km cell at its Census point. A site elsewhere in Isanti County can differ from both.
The nearest larger city, Coon Rapids (22 mi away), averages 65 rain days a year, about the same as Isanti.
Closest other areas in Minnesota:
- Cambridge, Minnesota: 64 rain days / yr, 5 mi
- Isanti County, Minnesota: 65 rain days / yr, 6 mi
- East Bethel, Minnesota: 66 rain days / yr, 10 mi
- St. Francis, Minnesota: 68 rain days / yr, 10 mi
- Oak Grove, Minnesota: 66 rain days / yr, 11 mi
- North Branch, Minnesota: 66 rain days / yr, 14 mi
- Nowthen, Minnesota: 65 rain days / yr, 14 mi
- Harris, Minnesota: 64 rain days / yr, 14 mi
All Minnesota cities and counties
Related guides
- AIA A201 Weather Delay Claims (ยง15.1.6.2): The Three Tests, With Real Numbers
- How Many Weather Days to Put in a Construction Schedule (Normal vs Plan-For)
- How to Document Weather Delays on a Construction Project (Checklist + Daily Log)
Method and source
A rain day is a day with at least 0.10 in (2.54 mm) in PRISM's daily estimate, which covers the 24 hours ending 12:00 UTC. Heavy days use 0.50 in. Normals are 1991-2020 averages. Records run from 1981 to the last complete month. Figures are for the 4 km cell containing the Census point for Isanti (45.491545, -93.242818). Data through 2026-11-24; page updated 2026-11-25. How we count rain days.
Source: PRISM Group, Oregon State University, https://prism.oregonstate.edu. These are gridded estimates, not gauge readings; conditions at a particular site can differ.