RainDayRecord

Rain days in Gardner, Massachusetts

Gardner averages 90 rain days a year, counting days with at least 0.10 in of precipitation in the PRISM 4 km grid cell that contains it (1991-2020 normals). May is the wettest month at 8.1 rain days and February the driest at 6.6. That is 4 more than the median Massachusetts location (86).

Quick answers

How many rain days does Gardner get a year?

About 90: that many days in a normal year bring 0.10 in or more of rain or melted snow. That makes Gardner the 3rd wettest of 56 Massachusetts cities and towns.

What is the wettest month in Gardner?

May, with 8.1 rain days in a normal year. To cover 9 years in 10, plan for 12.

What is the driest month?

February, with 6.6 rain days (plan for 10).

How many heavy-rain days does Gardner get?

31 a year with 0.50 in or more, most often in December (3.3).

Why these counts are lower than some weather sites': a rain day here means 0.10 in or more. Counts based on 0.01 in (NOAA's "days with precipitation") or 0.04 in (WeatherSpark) also include drizzle and trace days.

Rain days by month

The wettest three months are April-June, with 23.8 rain days combined; the driest are September-November, with 20.8. May is also the least predictable month, with the widest gap between its average and its plan-for number. The most rain days in a single month since 1981 was 16, in July 2023.

051015JanFebMarAprMayJunJulAugSepOctNovDec
Month Normal rain days Plan for
9 of 10 yrs
Heavy days
≥ 0.50 in
Precip (in) Record (year)
January 7.9 11 2.3 3.38 15 (1996)
February 6.6 10 2.1 3.18 13 (1981)
March 7.8 11 2.8 4.11 14 (1997)
April 7.8 11 2.4 3.81 15 (1996)
May 8.1 12 2.2 3.70 15 (1983)
June 7.9 11 2.5 4.15 15 (2006)
July 7.5 10 2.5 3.97 16 (2023)
August 7.2 10 2.7 4.02 13 (2024)
September 6.6 10 2.5 4.01 12 (2026)
October 7.3 10 3.1 4.67 12 (1995)
November 6.9 9 2.6 3.70 13 (2018)
December 8.0 11 3.3 4.31 13 (2007)
Year 89.6 30.9 47.01

Rain day: at least 0.10 in. Plan for: the 90th percentile of 1991-2020 yearly counts, rounded up to a whole day. Record: 1981 to date.

The last 12 months vs normal

From November 2025 through October 2026, Gardner had 87 rain days against a normal of 89.6, close to normal overall. 4 of 12 months came in above normal and 7 below. The biggest departure was September 2026, with 12 rain days against a normal of 6.6. Precipitation totaled 43.50 in against 47.01 in normally.

MonthRain daysNormalDifferencePrecip (in)Normal (in)
Nov 2025 5 6.9 -1.9 1.78 3.70
Dec 2025 8 8.0 +0.0 3.66 4.31
Jan 2026 7 7.9 -0.9 2.90 3.38
Feb 2026 5 6.6 -1.6 1.58 3.18
Mar 2026 8 7.8 +0.2 3.44 4.11
Apr 2026 7 7.8 -0.8 2.46 3.81
May 2026 13 8.1 +4.9 6.28 3.70
Jun 2026 6 7.9 -1.9 3.22 4.15
Jul 2026 8 7.5 +0.5 6.54 3.97
Aug 2026 5 7.2 -2.2 3.22 4.02
Sep 2026 12 6.6 +5.4 6.70 4.01
Oct 2026 3 7.3 -4.3 1.72 4.67

Gardner rain days month by month

Against the median Massachusetts location, Gardner gets more rain days in July and August, by half a day or more; other months are within half a day.

Rain days in January

Gardner averages 7.9 rain days in January, 2.3 of them heavy, with 3.38 in of precipitation. Plan for 11 to cover 9 years in 10; the record is 15 (1996). January 2026 had 7, 0.9 below normal.

Rain days in February

Gardner averages 6.6 rain days in February, 2.1 of them heavy, with 3.18 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 13 (1981). February 2026 had 5, 1.6 below normal.

Rain days in March

Gardner averages 7.8 rain days in March, 2.8 of them heavy, with 4.11 in of precipitation. Plan for 11 to cover 9 years in 10; the record is 14 (1997). March 2026 had 8, right on normal.

Rain days in April

Gardner averages 7.8 rain days in April, 2.4 of them heavy, with 3.81 in of precipitation. Plan for 11 to cover 9 years in 10; the record is 15 (1996). April 2026 had 7, 0.8 below normal.

Rain days in May

Gardner averages 8.1 rain days in May, 2.2 of them heavy, with 3.70 in of precipitation. Plan for 12 to cover 9 years in 10; the record is 15 (1983). May 2026 had 13, 4.9 above normal.

Rain days in June

Gardner averages 7.9 rain days in June, 2.5 of them heavy, with 4.15 in of precipitation. Plan for 11 to cover 9 years in 10; the record is 15 (2006). June 2026 had 6, 1.9 below normal.

Rain days in July

Gardner averages 7.5 rain days in July, 2.5 of them heavy, with 3.97 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 16 (2023). That is 0.6 more than the median Massachusetts location (6.9). July 2026 had 8, 0.5 above normal.

Rain days in August

Gardner averages 7.2 rain days in August, 2.7 of them heavy, with 4.02 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 13 (2024). That is 0.5 more than the median Massachusetts location (6.7). August 2026 had 5, 2.2 below normal.

Rain days in September

Gardner averages 6.6 rain days in September, 2.5 of them heavy, with 4.01 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 12 (2026). September 2026 had 12, 5.4 above normal.

Rain days in October

Gardner averages 7.3 rain days in October, 3.1 of them heavy, with 4.67 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 12 (1995). October 2026 had 3, 4.3 below normal.

Rain days in November

Gardner averages 6.9 rain days in November, 2.6 of them heavy, with 3.70 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 13 (2018). November 2025 had 5, 1.9 below normal.

Rain days in December

Gardner averages 8.0 rain days in December, 3.3 of them heavy, with 4.31 in of precipitation. Plan for 11 to cover 9 years in 10; the record is 13 (2007). December 2025 had 8, right on normal.

Using these numbers in a construction schedule

For Gardner, the normal column is the expected count: 90 days over a full year, 52 of them from April through October. Put those days in the schedule as non-work days or float before the job starts, not after it slips.

Average or plan-for? An average is exceeded about half the time. If May work has no float, carry 12 weather days for it rather than 8.1: Gardner had that many or fewer in 9 of 10 years from 1991 to 2020. Use the normals across a long job and the plan-for figure only for months on the critical path.

Heavy days. Gardner averages 31 days a year with 0.50 in or more, most often in December (3.3). Those are the days most likely to stop earthwork, paving and concrete outright.

Claiming time for abnormal weather. Under AIA A201-2017 §15.1.6.2, a claim for extra time because of adverse weather has to show the conditions were abnormal for the period, could not have been reasonably anticipated, and had an adverse effect on the scheduled work. The normals above show what could be anticipated in Gardner; the claim also needs the day-by-day record for your site and dates.

Price a rain-day report for a site in Gardner. Enter your dates to see actual rain days against this normal for free. The full PDF ($99) adds the daily record, a month-by-month comparison and a method statement you can attach to a schedule update or claim.

Check rain days near Gardner

What the weather delay claim report includes

Nearby

Gardner is in Worcester County, which averages 89 rain days a year across the county. Gardner gets 1 more rain days a year than that county-wide average.

The nearest larger city, Worcester (24 mi away), averages 86 rain days a year: Gardner gets 3 more.

Closest other areas in Massachusetts:

All Massachusetts cities and counties

Related guides

Method and source

A rain day is a day with at least 0.10 in (2.54 mm) in PRISM's daily estimate, which covers the 24 hours ending 12:00 UTC. Heavy days use 0.50 in. Normals are 1991-2020 averages. Records run from 1981 to the last complete month. Figures are for the 4 km cell containing the Census point for Gardner (42.584206, -71.988737). Data through 2026-11-24; page updated 2026-11-25. How we count rain days.

Source: PRISM Group, Oregon State University, https://prism.oregonstate.edu. These are gridded estimates, not gauge readings; conditions at a particular site can differ.