RainDayRecord

Rain days in Sulphur, Louisiana

Sulphur averages 82 rain days a year, counting days with at least 0.10 in of precipitation in the PRISM 4 km grid cell that contains it (1991-2020 normals). July is the wettest month at 10.4 rain days and March the driest at 5.2. That is 3 fewer than the median Louisiana location (85).

Quick answers

How many rain days does Sulphur get a year?

About 82: that many days in a normal year bring 0.10 in or more of rain or melted snow. That makes Sulphur the 96th wettest of 156 Louisiana cities and towns.

What is the wettest month in Sulphur?

July, with 10.4 rain days in a normal year. To cover 9 years in 10, plan for 16.

What is the driest month?

March, with 5.2 rain days (plan for 7).

How many heavy-rain days does Sulphur get?

38 a year with 0.50 in or more, most often in June (4.6).

Why these counts are lower than some weather sites': a rain day here means 0.10 in or more. Counts based on 0.01 in (NOAA's "days with precipitation") or 0.04 in (WeatherSpark) also include drizzle and trace days.

Rain days by month

The wettest three months are June-August, with 28.5 rain days combined; the driest are February-April, with 16.1. July is also the least predictable month, with the widest gap between its average and its plan-for number. The most rain days in a single month since 1981 was 19, in August 2022.

05101520JanFebMarAprMayJunJulAugSepOctNovDec
Month Normal rain days Plan for
9 of 10 yrs
Heavy days
≥ 0.50 in
Precip (in) Record (year)
January 7.0 9 3.7 6.23 12 (2007)
February 5.7 9 2.5 3.82 11 (2012)
March 5.2 7 2.1 3.54 11 (2015)
April 5.2 9 2.7 4.61 11 (2015)
May 5.9 9 3.0 5.42 13 (2026)
June 8.9 13 4.6 7.27 15 (2003)
July 10.4 16 3.9 6.32 16 (2024)
August 9.2 14 3.6 6.23 19 (2022)
September 6.9 10 3.5 6.10 17 (2018)
October 5.4 9 2.7 4.95 17 (2002)
November 5.4 9 2.8 4.69 13 (1982)
December 6.7 9 3.2 5.08 12 (2009)
Year 81.9 38.5 64.25

Rain day: at least 0.10 in. Plan for: the 90th percentile of 1991-2020 yearly counts, rounded up to a whole day. Record: 1981 to date.

The last 12 months vs normal

From November 2025 through October 2026, Sulphur had 69 rain days against a normal of 81.9: a dry stretch, 12.9 days below normal. 3 of 12 months came in above normal and 9 below. The biggest departure was May 2026, with 13 rain days against a normal of 5.9. Precipitation totaled 47.78 in against 64.26 in normally.

MonthRain daysNormalDifferencePrecip (in)Normal (in)
Nov 2025 2 5.4 -3.4 1.18 4.69
Dec 2025 6 6.7 -0.7 3.72 5.08
Jan 2026 4 7.0 -3.0 3.82 6.23
Feb 2026 2 5.7 -3.7 1.86 3.82
Mar 2026 3 5.2 -2.2 2.30 3.54
Apr 2026 4 5.2 -1.2 3.18 4.61
May 2026 13 5.9 +7.1 9.61 5.42
Jun 2026 13 8.9 +4.1 5.58 7.27
Jul 2026 8 10.4 -2.4 9.06 6.32
Aug 2026 5 9.2 -4.2 1.43 6.23
Sep 2026 8 6.9 +1.1 5.82 6.10
Oct 2026 1 5.4 -4.4 0.22 4.95

Sulphur rain days month by month

Against the median Louisiana location, Sulphur gets fewer in January, February, March, April, May, June and November, by half a day or more; other months are within half a day.

Rain days in January

Sulphur averages 7.0 rain days in January, 3.7 of them heavy, with 6.23 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 12 (2007). That is 0.5 fewer than the median Louisiana location (7.5). January 2026 had 4, 3.0 below normal.

Rain days in February

Sulphur averages 5.7 rain days in February, 2.5 of them heavy, with 3.82 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 11 (2012). That is 0.8 fewer than the median Louisiana location (6.5). February 2026 had 2, 3.7 below normal.

Rain days in March

Sulphur averages 5.2 rain days in March, 2.1 of them heavy, with 3.54 in of precipitation. Plan for 7 to cover 9 years in 10; the record is 11 (2015). That is 1.0 fewer than the median Louisiana location (6.2). March 2026 had 3, 2.2 below normal.

Rain days in April

Sulphur averages 5.2 rain days in April, 2.7 of them heavy, with 4.61 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 11 (2015). That is 0.6 fewer than the median Louisiana location (5.8). April 2026 had 4, 1.2 below normal.

Rain days in May

Sulphur averages 5.9 rain days in May, 3.0 of them heavy, with 5.42 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 13 (2026). That is 0.6 fewer than the median Louisiana location (6.5). May 2026 had 13, 7.1 above normal.

Rain days in June

Sulphur averages 8.9 rain days in June, 4.6 of them heavy, with 7.27 in of precipitation. Plan for 13 to cover 9 years in 10; the record is 15 (2003). That is 0.6 fewer than the median Louisiana location (9.5). June 2026 had 13, 4.1 above normal.

Rain days in July

Sulphur averages 10.4 rain days in July, 3.9 of them heavy, with 6.32 in of precipitation. Plan for 16 to cover 9 years in 10; the record is 16 (2024). July 2026 had 8, 2.4 below normal.

Rain days in August

Sulphur averages 9.2 rain days in August, 3.6 of them heavy, with 6.23 in of precipitation. Plan for 14 to cover 9 years in 10; the record is 19 (2022). August 2026 had 5, 4.2 below normal.

Rain days in September

Sulphur averages 6.9 rain days in September, 3.5 of them heavy, with 6.10 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 17 (2018). September 2026 had 8, 1.1 above normal.

Rain days in October

Sulphur averages 5.4 rain days in October, 2.7 of them heavy, with 4.95 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 17 (2002). October 2026 had 1, 4.4 below normal.

Rain days in November

Sulphur averages 5.4 rain days in November, 2.8 of them heavy, with 4.69 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 13 (1982). That is 0.5 fewer than the median Louisiana location (5.9). November 2025 had 2, 3.4 below normal.

Rain days in December

Sulphur averages 6.7 rain days in December, 3.2 of them heavy, with 5.08 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 12 (2009). December 2025 had 6, 0.7 below normal.

Using these numbers in a construction schedule

For Sulphur, the normal column is the expected count: 82 days over a full year, 52 of them from April through October. Put those days in the schedule as non-work days or float before the job starts, not after it slips.

Average or plan-for? An average is exceeded about half the time. If July work has no float, carry 16 weather days for it rather than 10.4: Sulphur had that many or fewer in 9 of 10 years from 1991 to 2020. Use the normals across a long job and the plan-for figure only for months on the critical path.

Heavy days. Sulphur averages 38 days a year with 0.50 in or more, most often in June (4.6). Those are the days most likely to stop earthwork, paving and concrete outright.

Claiming time for abnormal weather. Under AIA A201-2017 §15.1.6.2, a claim for extra time because of adverse weather has to show the conditions were abnormal for the period, could not have been reasonably anticipated, and had an adverse effect on the scheduled work. The normals above show what could be anticipated in Sulphur; the claim also needs the day-by-day record for your site and dates.

Price a rain-day report for a site in Sulphur. Enter your dates to see actual rain days against this normal for free. The full PDF ($99) adds the daily record, a month-by-month comparison and a method statement you can attach to a schedule update or claim.

Check rain days near Sulphur

What the weather delay claim report includes

Nearby

Sulphur is in Calcasieu Parish, which averages 88 rain days a year across the county. Sulphur gets 6 fewer rain days a year than that county-wide average.

The nearest larger city, Lake Charles (9 mi away), averages 87 rain days a year: Sulphur gets 5 fewer.

Closest other areas in Louisiana:

All Louisiana cities and counties

Related guides

Method and source

A rain day is a day with at least 0.10 in (2.54 mm) in PRISM's daily estimate, which covers the 24 hours ending 12:00 UTC. Heavy days use 0.50 in. Normals are 1991-2020 averages. Records run from 1981 to the last complete month. Figures are for the 4 km cell containing the Census point for Sulphur (30.229792, -93.356343). Data through 2026-11-24; page updated 2026-11-25. How we count rain days.

Source: PRISM Group, Oregon State University, https://prism.oregonstate.edu. These are gridded estimates, not gauge readings; conditions at a particular site can differ.