RainDayRecord

Rain days in Edmonton, Kentucky

Edmonton averages 95 rain days a year, counting days with at least 0.10 in of precipitation in the PRISM 4 km grid cell that contains it (1991-2020 normals). June is the wettest month at 9.7 rain days and September the driest at 6.1. That is 4 more than the median Kentucky location (91).

Quick answers

How many rain days does Edmonton get a year?

About 95: that many days in a normal year bring 0.10 in or more of rain or melted snow. That makes Edmonton the 35th wettest of 190 Kentucky cities and towns.

What is the wettest month in Edmonton?

June, with 9.7 rain days in a normal year. To cover 9 years in 10, plan for 13.

What is the driest month?

September, with 6.1 rain days (plan for 10).

How many heavy-rain days does Edmonton get?

34 a year with 0.50 in or more, most often in May (3.5).

Why these counts are lower than some weather sites': a rain day here means 0.10 in or more. Counts based on 0.01 in (NOAA's "days with precipitation") or 0.04 in (WeatherSpark) also include drizzle and trace days.

Rain days by month

The wettest three months are April-June, with 27.6 rain days combined; the driest are August-October, with 19.0. February swings the most from year to year: it averages 7.5 rain days, but covering 9 years in 10 takes 12. The most rain days in a single month since 1981 was 19, in June 1997.

051015JanFebMarAprMayJunJulAugSepOctNovDec
Month Normal rain days Plan for
9 of 10 yrs
Heavy days
≥ 0.50 in
Precip (in) Record (year)
January 8.0 10 2.7 4.12 12 (2017)
February 7.5 12 3.1 4.31 15 (2019)
March 8.8 12 3.3 4.98 14 (1994)
April 8.7 11 3.1 4.67 14 (2015)
May 9.2 13 3.5 5.20 13 (2025)
June 9.7 13 3.0 4.89 19 (1997)
July 8.7 13 3.5 4.95 15 (2015)
August 6.8 9 2.2 3.79 15 (2020)
September 6.1 10 2.0 3.58 14 (2009)
October 6.1 9 2.2 3.38 12 (2009)
November 7.0 10 2.5 3.61 11 (2018)
December 8.6 11 3.2 4.92 13 (2007)
Year 95.4 34.3 52.38

Rain day: at least 0.10 in. Plan for: the 90th percentile of 1991-2020 yearly counts, rounded up to a whole day. Record: 1981 to date.

The last 12 months vs normal

From November 2025 through October 2026, Edmonton had 73 rain days against a normal of 95.2: a dry stretch, 22.2 days below normal. 3 of 12 months came in above normal and 8 below. The biggest departure was April 2026, with 3 rain days against a normal of 8.7. Precipitation totaled 44.24 in against 52.40 in normally.

MonthRain daysNormalDifferencePrecip (in)Normal (in)
Nov 2025 6 7.0 -1.0 2.31 3.61
Dec 2025 4 8.6 -4.6 2.80 4.92
Jan 2026 8 8.0 +0.0 3.18 4.12
Feb 2026 7 7.5 -0.5 2.32 4.31
Mar 2026 4 8.8 -4.8 2.39 4.98
Apr 2026 3 8.7 -5.7 2.64 4.67
May 2026 11 9.2 +1.8 6.09 5.20
Jun 2026 6 9.7 -3.7 9.54 4.89
Jul 2026 10 8.7 +1.3 6.12 4.95
Aug 2026 7 6.8 +0.2 3.13 3.79
Sep 2026 4 6.1 -2.1 1.56 3.58
Oct 2026 3 6.1 -3.1 2.16 3.38

Edmonton rain days month by month

Against the median Kentucky location, Edmonton gets more rain days in January, February, June and December, by half a day or more; other months are within half a day.

Rain days in January

Edmonton averages 8.0 rain days in January, 2.7 of them heavy, with 4.12 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 12 (2017). That is 0.6 more than the median Kentucky location (7.4). January 2026 had 8, right on normal.

Rain days in February

Edmonton averages 7.5 rain days in February, 3.1 of them heavy, with 4.31 in of precipitation. Plan for 12 to cover 9 years in 10; the record is 15 (2019). That is 0.5 more than the median Kentucky location (7.0). February 2026 had 7, 0.5 below normal.

Rain days in March

Edmonton averages 8.8 rain days in March, 3.3 of them heavy, with 4.98 in of precipitation. Plan for 12 to cover 9 years in 10; the record is 14 (1994). March 2026 had 4, 4.8 below normal.

Rain days in April

Edmonton averages 8.7 rain days in April, 3.1 of them heavy, with 4.67 in of precipitation. Plan for 11 to cover 9 years in 10; the record is 14 (2015). April 2026 had 3, 5.7 below normal.

Rain days in May

Edmonton averages 9.2 rain days in May, 3.5 of them heavy, with 5.20 in of precipitation. Plan for 13 to cover 9 years in 10; the record is 13 (2025). May 2026 had 11, 1.8 above normal.

Rain days in June

Edmonton averages 9.7 rain days in June, 3.0 of them heavy, with 4.89 in of precipitation. Plan for 13 to cover 9 years in 10; the record is 19 (1997). That is 0.6 more than the median Kentucky location (9.1). June 2026 had 6, 3.7 below normal.

Rain days in July

Edmonton averages 8.7 rain days in July, 3.5 of them heavy, with 4.95 in of precipitation. Plan for 13 to cover 9 years in 10; the record is 15 (2015). July 2026 had 10, 1.3 above normal.

Rain days in August

Edmonton averages 6.8 rain days in August, 2.2 of them heavy, with 3.79 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 15 (2020). August 2026 had 7, right on normal.

Rain days in September

Edmonton averages 6.1 rain days in September, 2.0 of them heavy, with 3.58 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 14 (2009). September 2026 had 4, 2.1 below normal.

Rain days in October

Edmonton averages 6.1 rain days in October, 2.2 of them heavy, with 3.38 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 12 (2009). October 2026 had 3, 3.1 below normal.

Rain days in November

Edmonton averages 7.0 rain days in November, 2.5 of them heavy, with 3.61 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 11 (2018). November 2025 had 6, 1.0 below normal.

Rain days in December

Edmonton averages 8.6 rain days in December, 3.2 of them heavy, with 4.92 in of precipitation. Plan for 11 to cover 9 years in 10; the record is 13 (2007). That is 0.7 more than the median Kentucky location (7.9). December 2025 had 4, 4.6 below normal.

Using these numbers in a construction schedule

For Edmonton, the normal column is the expected count: 95 days over a full year, 55 of them from April through October. Put those days in the schedule as non-work days or float before the job starts, not after it slips.

Average or plan-for? An average is exceeded about half the time. If June work has no float, carry 13 weather days for it rather than 9.7: Edmonton had that many or fewer in 9 of 10 years from 1991 to 2020. Use the normals across a long job and the plan-for figure only for months on the critical path.

Heavy days. Edmonton averages 34 days a year with 0.50 in or more, most often in May (3.5). Those are the days most likely to stop earthwork, paving and concrete outright.

Claiming time for abnormal weather. Under AIA A201-2017 §15.1.6.2, a claim for extra time because of adverse weather has to show the conditions were abnormal for the period, could not have been reasonably anticipated, and had an adverse effect on the scheduled work. The normals above show what could be anticipated in Edmonton; the claim also needs the day-by-day record for your site and dates.

Price a rain-day report for a site in Edmonton. Enter your dates to see actual rain days against this normal for free. The full PDF ($99) adds the daily record, a month-by-month comparison and a method statement you can attach to a schedule update or claim.

Check rain days near Edmonton

What the weather delay claim report includes

Nearby

Edmonton is in Metcalfe County, which averages 95 rain days a year across the county. The two numbers are close but measure different things: the county figure averages all 42 of the county's grid cells, while Edmonton's is the single 4 km cell at its Census point. A site elsewhere in Metcalfe County can differ from both.

The nearest larger city, Bowling Green (45 mi away), averages 94 rain days a year: Edmonton gets 1 more.

Closest other areas in Kentucky:

All Kentucky cities and counties

Related guides

Method and source

A rain day is a day with at least 0.10 in (2.54 mm) in PRISM's daily estimate, which covers the 24 hours ending 12:00 UTC. Heavy days use 0.50 in. Normals are 1991-2020 averages. Records run from 1981 to the last complete month. Figures are for the 4 km cell containing the Census point for Edmonton (36.984946, -85.621648). Data through 2026-11-24; page updated 2026-11-25. How we count rain days.

Source: PRISM Group, Oregon State University, https://prism.oregonstate.edu. These are gridded estimates, not gauge readings; conditions at a particular site can differ.