Rochester averages 80 rain days a year, counting days with at least 0.10 in of precipitation in the PRISM 4 km grid cell that contains it (1991-2020 normals). May is the wettest month at 8.1 rain days and February the driest at 5.1. That is 3 fewer than the median Indiana location (83).

Quick answers

How many rain days does Rochester get a year?

About 80: that many days in a normal year bring 0.10 in or more of rain or melted snow. That makes Rochester the 245th wettest of 298 Indiana cities and towns.

What is the wettest month in Rochester?

May, with 8.1 rain days in a normal year. To cover 9 years in 10, plan for 11.

What is the driest month?

February, with 5.1 rain days (plan for 7).

How many heavy-rain days does Rochester get?

25 a year with 0.50 in or more, most often in June (3.2).

Why these counts are lower than some weather sites': a rain day here means 0.10 in or more. Counts based on 0.01 in (NOAA's "days with precipitation") or 0.04 in (WeatherSpark) also include drizzle and trace days.

Rain days by month

The wettest three months are April-June, with 23.3 rain days combined; the driest are January-March, with 17.8. October swings the most from year to year: it averages 6.4 rain days, but covering 9 years in 10 takes 10. The most rain days in a single month since 1981 was 16, in June 2015.

051015JanFebMarAprMayJunJulAugSepOctNovDec
Month Normal rain days Plan for
9 of 10 yrs
Heavy days
≥ 0.50 in
Precip (in) Record (year)
January 6.5 9 1.4 2.78 13 (2005)
February 5.1 7 1.1 2.17 13 (2008)
March 6.2 9 1.5 2.61 9 (2020)
April 7.7 11 2.7 3.85 14 (2011)
May 8.1 11 2.9 4.33 12 (2019)
June 7.5 11 3.2 4.40 16 (2015)
July 7.4 9 2.6 4.36 11 (2017)
August 6.5 9 2.7 4.11 13 (2026)
September 5.6 9 1.9 3.17 11 (2011)
October 6.4 10 2.1 3.17 14 (2021)
November 6.7 10 1.9 3.10 12 (1982)
December 6.2 9 1.3 2.43 11 (2008)
Year 79.9 25.2 40.49

Rain day: at least 0.10 in. Plan for: the 90th percentile of 1991-2020 yearly counts, rounded up to a whole day. Record: 1981 to date.

The last 12 months vs normal

From November 2025 through October 2026, Rochester had 84 rain days against a normal of 79.9: a wet stretch, 4.1 days above normal. 4 of 12 months came in above normal and 8 below. The biggest departure was August 2026, with 13 rain days against a normal of 6.5. Precipitation totaled 41.44 in against 40.48 in normally.

MonthRain daysNormalDifferencePrecip (in)Normal (in)
Nov 2025 6 6.7 -0.7 1.88 3.10
Dec 2025 5 6.2 -1.2 1.59 2.43
Jan 2026 6 6.5 -0.5 1.34 2.78
Feb 2026 1 5.1 -4.1 0.82 2.17
Mar 2026 7 6.2 +0.8 2.97 2.61
Apr 2026 12 7.7 +4.3 7.40 3.85
May 2026 7 8.1 -1.1 1.93 4.33
Jun 2026 11 7.5 +3.5 5.53 4.40
Jul 2026 7 7.4 -0.4 2.62 4.36
Aug 2026 13 6.5 +6.5 7.66 4.11
Sep 2026 5 5.6 -0.6 5.45 3.17
Oct 2026 4 6.4 -2.4 2.25 3.17

Rochester rain days month by month

Against the median Indiana location, Rochester gets fewer in March, April, May and June, by half a day or more; other months are within half a day.

Rain days in January

Rochester averages 6.5 rain days in January, 1.4 of them heavy, with 2.78 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 13 (2005). January 2026 had 6, 0.5 below normal.

Rain days in February

Rochester averages 5.1 rain days in February, 1.1 of them heavy, with 2.17 in of precipitation. Plan for 7 to cover 9 years in 10; the record is 13 (2008). February 2026 had 1, 4.1 below normal.

Rain days in March

Rochester averages 6.2 rain days in March, 1.5 of them heavy, with 2.61 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 9 (2020). That is 0.8 fewer than the median Indiana location (7.0). March 2026 had 7, 0.8 above normal.

Rain days in April

Rochester averages 7.7 rain days in April, 2.7 of them heavy, with 3.85 in of precipitation. Plan for 11 to cover 9 years in 10; the record is 14 (2011). That is 0.6 fewer than the median Indiana location (8.3). April 2026 had 12, 4.3 above normal.

Rain days in May

Rochester averages 8.1 rain days in May, 2.9 of them heavy, with 4.33 in of precipitation. Plan for 11 to cover 9 years in 10; the record is 12 (2019). That is 0.9 fewer than the median Indiana location (9.0). May 2026 had 7, 1.1 below normal.

Rain days in June

Rochester averages 7.5 rain days in June, 3.2 of them heavy, with 4.40 in of precipitation. Plan for 11 to cover 9 years in 10; the record is 16 (2015). That is 1.1 fewer than the median Indiana location (8.6). June 2026 had 11, 3.5 above normal.

Rain days in July

Rochester averages 7.4 rain days in July, 2.6 of them heavy, with 4.36 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 11 (2017). July 2026 had 7, right on normal.

Rain days in August

Rochester averages 6.5 rain days in August, 2.7 of them heavy, with 4.11 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 13 (2026). August 2026 had 13, 6.5 above normal.

Rain days in September

Rochester averages 5.6 rain days in September, 1.9 of them heavy, with 3.17 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 11 (2011). September 2026 had 5, 0.6 below normal.

Rain days in October

Rochester averages 6.4 rain days in October, 2.1 of them heavy, with 3.17 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 14 (2021). October 2026 had 4, 2.4 below normal.

Rain days in November

Rochester averages 6.7 rain days in November, 1.9 of them heavy, with 3.10 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 12 (1982). November 2025 had 6, 0.7 below normal.

Rain days in December

Rochester averages 6.2 rain days in December, 1.3 of them heavy, with 2.43 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 11 (2008). December 2025 had 5, 1.2 below normal.

Using these numbers in a construction schedule

For Rochester, the normal column is the expected count: 80 days over a full year, 49 of them from April through October. Put those days in the schedule as non-work days or float before the job starts, not after it slips.

Average or plan-for? An average is exceeded about half the time. If May work has no float, carry 11 weather days for it rather than 8.1: Rochester had that many or fewer in 9 of 10 years from 1991 to 2020. Use the normals across a long job and the plan-for figure only for months on the critical path.

Heavy days. Rochester averages 25 days a year with 0.50 in or more, most often in June (3.2). Those are the days most likely to stop earthwork, paving and concrete outright.

Claiming time for abnormal weather. Under AIA A201-2017 §15.1.6.2, a claim for extra time because of adverse weather has to show the conditions were abnormal for the period, could not have been reasonably anticipated, and had an adverse effect on the scheduled work. The normals above show what could be anticipated in Rochester; the claim also needs the day-by-day record for your site and dates. With the last 12 months running 4.1 rain days above normal, it is worth pulling that record now.

Price a rain-day report for a site in Rochester. Enter your dates to see actual rain days against this normal for free. The full PDF ($99) adds the daily record, a month-by-month comparison and a method statement you can attach to a schedule update or claim.

Check rain days near Rochester

What the weather delay claim report includes

Nearby

Rochester is in Fulton County, which averages 82 rain days a year across the county. Rochester gets 2 fewer rain days a year than that county-wide average.

The nearest larger city, Kokomo (41 mi away), averages 82 rain days a year: Rochester gets 2 fewer.

Closest other areas in Indiana:

All Indiana cities and counties

Related guides

Method and source

A rain day is a day with at least 0.10 in (2.54 mm) in PRISM's daily estimate, which covers the 24 hours ending 12:00 UTC. Heavy days use 0.50 in. Normals are 1991-2020 averages. Records run from 1981 to the last complete month. Figures are for the 4 km cell containing the Census point for Rochester (41.060392, -86.198313). Data through 2026-11-24; page updated 2026-11-25. How we count rain days.

Source: PRISM Group, Oregon State University, https://prism.oregonstate.edu. These are gridded estimates, not gauge readings; conditions at a particular site can differ.