RainDayRecord

Rain days in Grabill, Indiana

Grabill averages 83 rain days a year, counting days with at least 0.10 in of precipitation in the PRISM 4 km grid cell that contains it (1991-2020 normals). May is the wettest month at 9.0 rain days and February the driest at 5.0. That is close to the Indiana median of 83.

Quick answers

How many rain days does Grabill get a year?

About 83: that many days in a normal year bring 0.10 in or more of rain or melted snow. That makes Grabill the 143rd wettest of 298 Indiana cities and towns.

What is the wettest month in Grabill?

May, with 9.0 rain days in a normal year. To cover 9 years in 10, plan for 13.

What is the driest month?

February, with 5.0 rain days (plan for 7).

How many heavy-rain days does Grabill get?

23 a year with 0.50 in or more, most often in May (2.7).

Why these counts are lower than some weather sites': a rain day here means 0.10 in or more. Counts based on 0.01 in (NOAA's "days with precipitation") or 0.04 in (WeatherSpark) also include drizzle and trace days.

Rain days by month

The wettest three months are April-June, with 25.4 rain days combined; the driest are December-February, with 16.9. May is also the least predictable month, with the widest gap between its average and its plan-for number. The most rain days in a single month since 1981 was 18, in July 1992.

051015JanFebMarAprMayJunJulAugSepOctNovDec
Month Normal rain days Plan for
9 of 10 yrs
Heavy days
≥ 0.50 in
Precip (in) Record (year)
January 6.1 9 1.4 2.48 14 (2005)
February 5.0 7 1.1 2.04 10 (1986)
March 6.4 8 1.4 2.56 14 (1982)
April 7.8 11 2.2 3.69 15 (2026)
May 9.0 13 2.7 4.48 15 (2011)
June 8.6 12 2.6 4.09 14 (1993)
July 7.7 10 2.6 3.64 18 (1992)
August 7.2 10 2.4 3.98 14 (2026)
September 6.0 9 2.0 3.11 13 (2011)
October 6.4 9 1.9 2.82 13 (1991)
November 6.6 9 1.9 2.96 17 (1985)
December 5.8 9 1.3 2.35 14 (1990)
Year 82.6 23.4 38.20

Rain day: at least 0.10 in. Plan for: the 90th percentile of 1991-2020 yearly counts, rounded up to a whole day. Record: 1981 to date.

The last 12 months vs normal

From November 2025 through October 2026, Grabill had 88 rain days against a normal of 82.6: a wet stretch, 5.4 days above normal. 5 of 12 months came in above normal and 7 below. The biggest departure was April 2026, with 15 rain days against a normal of 7.8. Precipitation totaled 41.54 in against 38.20 in normally.

MonthRain daysNormalDifferencePrecip (in)Normal (in)
Nov 2025 6 6.6 -0.6 2.17 2.96
Dec 2025 4 5.8 -1.8 1.89 2.35
Jan 2026 4 6.1 -2.1 1.37 2.48
Feb 2026 2 5.0 -3.0 1.06 2.04
Mar 2026 7 6.4 +0.6 3.29 2.56
Apr 2026 15 7.8 +7.2 8.61 3.69
May 2026 10 9.0 +1.0 3.17 4.48
Jun 2026 8 8.6 -0.6 3.15 4.09
Jul 2026 6 7.7 -1.7 2.12 3.64
Aug 2026 14 7.2 +6.8 7.34 3.98
Sep 2026 8 6.0 +2.0 5.62 3.11
Oct 2026 4 6.4 -2.4 1.75 2.82

Grabill rain days month by month

Against the median Indiana location, Grabill gets more rain days in August and September and fewer in March, April and December, by half a day or more; other months are within half a day.

Rain days in January

Grabill averages 6.1 rain days in January, 1.4 of them heavy, with 2.48 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 14 (2005). January 2026 had 4, 2.1 below normal.

Rain days in February

Grabill averages 5.0 rain days in February, 1.1 of them heavy, with 2.04 in of precipitation. Plan for 7 to cover 9 years in 10; the record is 10 (1986). February 2026 had 2, 3.0 below normal.

Rain days in March

Grabill averages 6.4 rain days in March, 1.4 of them heavy, with 2.56 in of precipitation. Plan for 8 to cover 9 years in 10; the record is 14 (1982). That is 0.6 fewer than the median Indiana location (7.0). March 2026 had 7, 0.6 above normal.

Rain days in April

Grabill averages 7.8 rain days in April, 2.2 of them heavy, with 3.69 in of precipitation. Plan for 11 to cover 9 years in 10; the record is 15 (2026). That is 0.5 fewer than the median Indiana location (8.3). April 2026 had 15, 7.2 above normal.

Rain days in May

Grabill averages 9.0 rain days in May, 2.7 of them heavy, with 4.48 in of precipitation. Plan for 13 to cover 9 years in 10; the record is 15 (2011). May 2026 had 10, 1.0 above normal.

Rain days in June

Grabill averages 8.6 rain days in June, 2.6 of them heavy, with 4.09 in of precipitation. Plan for 12 to cover 9 years in 10; the record is 14 (1993). June 2026 had 8, 0.6 below normal.

Rain days in July

Grabill averages 7.7 rain days in July, 2.6 of them heavy, with 3.64 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 18 (1992). July 2026 had 6, 1.7 below normal.

Rain days in August

Grabill averages 7.2 rain days in August, 2.4 of them heavy, with 3.98 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 14 (2026). That is 0.9 more than the median Indiana location (6.3). August 2026 had 14, 6.8 above normal.

Rain days in September

Grabill averages 6.0 rain days in September, 2.0 of them heavy, with 3.11 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 13 (2011). That is 0.5 more than the median Indiana location (5.5). September 2026 had 8, 2.0 above normal.

Rain days in October

Grabill averages 6.4 rain days in October, 1.9 of them heavy, with 2.82 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 13 (1991). October 2026 had 4, 2.4 below normal.

Rain days in November

Grabill averages 6.6 rain days in November, 1.9 of them heavy, with 2.96 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 17 (1985). November 2025 had 6, 0.6 below normal.

Rain days in December

Grabill averages 5.8 rain days in December, 1.3 of them heavy, with 2.35 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 14 (1990). That is 0.8 fewer than the median Indiana location (6.6). December 2025 had 4, 1.8 below normal.

Using these numbers in a construction schedule

For Grabill, the normal column is the expected count: 83 days over a full year, 53 of them from April through October. Put those days in the schedule as non-work days or float before the job starts, not after it slips.

Average or plan-for? An average is exceeded about half the time. If May work has no float, carry 13 weather days for it rather than 9.0: Grabill had that many or fewer in 9 of 10 years from 1991 to 2020. Use the normals across a long job and the plan-for figure only for months on the critical path.

Heavy days. Grabill averages 23 days a year with 0.50 in or more, most often in May (2.7). Those are the days most likely to stop earthwork, paving and concrete outright.

Claiming time for abnormal weather. Under AIA A201-2017 §15.1.6.2, a claim for extra time because of adverse weather has to show the conditions were abnormal for the period, could not have been reasonably anticipated, and had an adverse effect on the scheduled work. The normals above show what could be anticipated in Grabill; the claim also needs the day-by-day record for your site and dates. With the last 12 months running 5.4 rain days above normal, it is worth pulling that record now.

Price a rain-day report for a site in Grabill. Enter your dates to see actual rain days against this normal for free. The full PDF ($99) adds the daily record, a month-by-month comparison and a method statement you can attach to a schedule update or claim.

Check rain days near Grabill

What the weather delay claim report includes

Nearby

Grabill is in Allen County, which averages 81 rain days a year across the county. Grabill gets 2 more rain days a year than that county-wide average.

The nearest larger city, Fort Wayne (12 mi away), averages 80 rain days a year: Grabill gets 2 more.

Closest other areas in Indiana:

All Indiana cities and counties

Related guides

Method and source

A rain day is a day with at least 0.10 in (2.54 mm) in PRISM's daily estimate, which covers the 24 hours ending 12:00 UTC. Heavy days use 0.50 in. Normals are 1991-2020 averages. Records run from 1981 to the last complete month. Figures are for the 4 km cell containing the Census point for Grabill (41.209472, -84.968164). Data through 2026-11-24; page updated 2026-11-25. How we count rain days.

Source: PRISM Group, Oregon State University, https://prism.oregonstate.edu. These are gridded estimates, not gauge readings; conditions at a particular site can differ.