RainDayRecord

Rain days in Mount Zion, Illinois

Mount Zion averages 76 rain days a year, counting days with at least 0.10 in of precipitation in the PRISM 4 km grid cell that contains it (1991-2020 normals). May is the wettest month at 9.0 rain days and February the driest at 4.4. That is close to the Illinois median of 75.

Quick answers

How many rain days does Mount Zion get a year?

About 76: that many days in a normal year bring 0.10 in or more of rain or melted snow. That makes Mount Zion the 278th wettest of 599 Illinois cities and towns.

What is the wettest month in Mount Zion?

May, with 9.0 rain days in a normal year. To cover 9 years in 10, plan for 12.

What is the driest month?

February, with 4.4 rain days (plan for 7).

How many heavy-rain days does Mount Zion get?

26 a year with 0.50 in or more, most often in June (3.2).

Why these counts are lower than some weather sites': a rain day here means 0.10 in or more. Counts based on 0.01 in (NOAA's "days with precipitation") or 0.04 in (WeatherSpark) also include drizzle and trace days.

Rain days by month

The wettest three months are April-June, with 24.5 rain days combined; the driest are December-February, with 14.4. October swings the most from year to year: it averages 6.3 rain days, but covering 9 years in 10 takes 10. The most rain days in a single month since 1981 was 18, in November 1985.

051015JanFebMarAprMayJunJulAugSepOctNovDec
Month Normal rain days Plan for
9 of 10 yrs
Heavy days
≥ 0.50 in
Precip (in) Record (year)
January 4.9 7 1.3 2.29 10 (2005)
February 4.4 7 1.2 2.04 9 (2022)
March 6.0 9 1.6 2.69 13 (1985)
April 7.8 11 2.8 4.10 14 (1994)
May 9.0 12 2.9 4.70 16 (1996)
June 7.7 10 3.2 4.74 14 (1998)
July 6.9 10 2.6 3.90 14 (1993)
August 5.9 9 2.1 3.18 12 (1982)
September 5.3 8 2.1 3.17 13 (1993)
October 6.3 10 2.3 3.28 14 (2021)
November 6.1 9 2.2 3.17 18 (1985)
December 5.1 8 1.4 2.38 12 (1990)
Year 75.5 25.6 39.64

Rain day: at least 0.10 in. Plan for: the 90th percentile of 1991-2020 yearly counts, rounded up to a whole day. Record: 1981 to date.

The last 12 months vs normal

From November 2025 through October 2026, Mount Zion had 63 rain days against a normal of 75.4: a dry stretch, 12.4 days below normal. 2 of 12 months came in above normal and 10 below. The biggest departure was February 2026, with 1 rain days against a normal of 4.4. Precipitation totaled 42.77 in against 39.64 in normally.

MonthRain daysNormalDifferencePrecip (in)Normal (in)
Nov 2025 5 6.1 -1.1 2.23 3.17
Dec 2025 5 5.1 -0.1 1.72 2.38
Jan 2026 3 4.9 -1.9 0.93 2.29
Feb 2026 1 4.4 -3.4 0.59 2.04
Mar 2026 9 6.0 +3.0 7.26 2.69
Apr 2026 6 7.8 -1.8 6.82 4.10
May 2026 7 9.0 -2.0 3.22 4.70
Jun 2026 7 7.7 -0.7 6.90 4.74
Jul 2026 5 6.9 -1.9 5.45 3.90
Aug 2026 8 5.9 +2.1 4.05 3.18
Sep 2026 4 5.3 -1.3 1.54 3.17
Oct 2026 3 6.3 -3.3 2.06 3.28

Mount Zion rain days month by month

Every month in Mount Zion is within half a rain day of the median Illinois location.

Rain days in January

Mount Zion averages 4.9 rain days in January, 1.3 of them heavy, with 2.29 in of precipitation. Plan for 7 to cover 9 years in 10; the record is 10 (2005). January 2026 had 3, 1.9 below normal.

Rain days in February

Mount Zion averages 4.4 rain days in February, 1.2 of them heavy, with 2.04 in of precipitation. Plan for 7 to cover 9 years in 10; the record is 9 (2022). February 2026 had 1, 3.4 below normal.

Rain days in March

Mount Zion averages 6.0 rain days in March, 1.6 of them heavy, with 2.69 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 13 (1985). March 2026 had 9, 3.0 above normal.

Rain days in April

Mount Zion averages 7.8 rain days in April, 2.8 of them heavy, with 4.10 in of precipitation. Plan for 11 to cover 9 years in 10; the record is 14 (1994). April 2026 had 6, 1.8 below normal.

Rain days in May

Mount Zion averages 9.0 rain days in May, 2.9 of them heavy, with 4.70 in of precipitation. Plan for 12 to cover 9 years in 10; the record is 16 (1996). May 2026 had 7, 2.0 below normal.

Rain days in June

Mount Zion averages 7.7 rain days in June, 3.2 of them heavy, with 4.74 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 14 (1998). June 2026 had 7, 0.7 below normal.

Rain days in July

Mount Zion averages 6.9 rain days in July, 2.6 of them heavy, with 3.90 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 14 (1993). July 2026 had 5, 1.9 below normal.

Rain days in August

Mount Zion averages 5.9 rain days in August, 2.1 of them heavy, with 3.18 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 12 (1982). August 2026 had 8, 2.1 above normal.

Rain days in September

Mount Zion averages 5.3 rain days in September, 2.1 of them heavy, with 3.17 in of precipitation. Plan for 8 to cover 9 years in 10; the record is 13 (1993). September 2026 had 4, 1.3 below normal.

Rain days in October

Mount Zion averages 6.3 rain days in October, 2.3 of them heavy, with 3.28 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 14 (2021). October 2026 had 3, 3.3 below normal.

Rain days in November

Mount Zion averages 6.1 rain days in November, 2.2 of them heavy, with 3.17 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 18 (1985). November 2025 had 5, 1.1 below normal.

Rain days in December

Mount Zion averages 5.1 rain days in December, 1.4 of them heavy, with 2.38 in of precipitation. Plan for 8 to cover 9 years in 10; the record is 12 (1990). December 2025 had 5, right on normal.

Using these numbers in a construction schedule

For Mount Zion, the normal column is the expected count: 76 days over a full year, 49 of them from April through October. Put those days in the schedule as non-work days or float before the job starts, not after it slips.

Average or plan-for? An average is exceeded about half the time. If May work has no float, carry 12 weather days for it rather than 9.0: Mount Zion had that many or fewer in 9 of 10 years from 1991 to 2020. Use the normals across a long job and the plan-for figure only for months on the critical path.

Heavy days. Mount Zion averages 26 days a year with 0.50 in or more, most often in June (3.2). Those are the days most likely to stop earthwork, paving and concrete outright.

Claiming time for abnormal weather. Under AIA A201-2017 §15.1.6.2, a claim for extra time because of adverse weather has to show the conditions were abnormal for the period, could not have been reasonably anticipated, and had an adverse effect on the scheduled work. The normals above show what could be anticipated in Mount Zion; the claim also needs the day-by-day record for your site and dates.

Price a rain-day report for a site in Mount Zion. Enter your dates to see actual rain days against this normal for free. The full PDF ($99) adds the daily record, a month-by-month comparison and a method statement you can attach to a schedule update or claim.

Check rain days near Mount Zion

What the weather delay claim report includes

Nearby

Mount Zion is in Macon County, which averages 76 rain days a year across the county. The two numbers are close but measure different things: the county figure averages all 100 of the county's grid cells, while Mount Zion's is the single 4 km cell at its Census point. A site elsewhere in Macon County can differ from both.

The nearest larger city, Decatur (6 mi away), averages 75 rain days a year, about the same as Mount Zion.

Closest other areas in Illinois:

All Illinois cities and counties

Related guides

Method and source

A rain day is a day with at least 0.10 in (2.54 mm) in PRISM's daily estimate, which covers the 24 hours ending 12:00 UTC. Heavy days use 0.50 in. Normals are 1991-2020 averages. Records run from 1981 to the last complete month. Figures are for the 4 km cell containing the Census point for Mount Zion (39.784016, -88.885011). Data through 2026-11-24; page updated 2026-11-25. How we count rain days.

Source: PRISM Group, Oregon State University, https://prism.oregonstate.edu. These are gridded estimates, not gauge readings; conditions at a particular site can differ.