RainDayRecord

Rain days in Mount Prospect, Illinois

Mount Prospect averages 75 rain days a year, counting days with at least 0.10 in of precipitation in the PRISM 4 km grid cell that contains it (1991-2020 normals). May is the wettest month at 8.1 rain days and February the driest at 4.7. That is close to the Illinois median of 75.

Quick answers

How many rain days does Mount Prospect get a year?

About 75: that many days in a normal year bring 0.10 in or more of rain or melted snow. That makes Mount Prospect the 290th wettest of 599 Illinois cities and towns.

What is the wettest month in Mount Prospect?

May, with 8.1 rain days in a normal year. To cover 9 years in 10, plan for 11.

What is the driest month?

February, with 4.7 rain days (plan for 8).

How many heavy-rain days does Mount Prospect get?

24 a year with 0.50 in or more, most often in May (3.2).

Why these counts are lower than some weather sites': a rain day here means 0.10 in or more. Counts based on 0.01 in (NOAA's "days with precipitation") or 0.04 in (WeatherSpark) also include drizzle and trace days.

Rain days by month

The wettest three months are April-June, with 23.3 rain days combined; the driest are December-February, with 15.1. June swings the most from year to year: it averages 7.7 rain days, but covering 9 years in 10 takes 12. The most rain days in a single month since 1981 was 16, in June 2015.

051015JanFebMarAprMayJunJulAugSepOctNovDec
Month Normal rain days Plan for
9 of 10 yrs
Heavy days
≥ 0.50 in
Precip (in) Record (year)
January 5.1 8 1.1 2.05 10 (2024)
February 4.7 8 1.1 1.95 10 (2008)
March 5.5 8 1.3 2.28 10 (1990)
April 7.5 11 2.6 3.77 12 (2009)
May 8.1 11 3.2 4.63 13 (2019)
June 7.7 12 2.8 4.44 16 (2015)
July 6.3 9 2.1 3.68 15 (1987)
August 7.3 10 2.7 4.28 16 (1987)
September 6.1 9 2.0 3.47 12 (1992)
October 6.5 10 1.9 3.37 13 (2009)
November 5.2 7 1.4 2.46 12 (1992)
December 5.3 8 1.2 2.16 14 (2008)
Year 75.4 23.5 38.54

Rain day: at least 0.10 in. Plan for: the 90th percentile of 1991-2020 yearly counts, rounded up to a whole day. Record: 1981 to date.

The last 12 months vs normal

From November 2025 through October 2026, Mount Prospect had 64 rain days against a normal of 75.3: a dry stretch, 11.3 days below normal. 3 of 12 months came in above normal and 9 below. The biggest departure was February 2026, with 0 rain days against a normal of 4.7. Precipitation totaled 41.07 in against 38.54 in normally.

MonthRain daysNormalDifferencePrecip (in)Normal (in)
Nov 2025 5 5.2 -0.2 2.24 2.46
Dec 2025 4 5.3 -1.3 1.78 2.16
Jan 2026 2 5.1 -3.1 1.81 2.05
Feb 2026 0 4.7 -4.7 0.14 1.95
Mar 2026 5 5.5 -0.5 5.10 2.28
Apr 2026 11 7.5 +3.5 7.78 3.77
May 2026 4 8.1 -4.1 1.38 4.63
Jun 2026 11 7.7 +3.3 5.43 4.44
Jul 2026 4 6.3 -2.3 3.88 3.68
Aug 2026 7 7.3 -0.3 4.10 4.28
Sep 2026 7 6.1 +0.9 3.90 3.47
Oct 2026 4 6.5 -2.5 3.53 3.37

Mount Prospect rain days month by month

Against the median Illinois location, Mount Prospect gets more rain days in August, September and October and fewer in March, May and November, by half a day or more; other months are within half a day.

Rain days in January

Mount Prospect averages 5.1 rain days in January, 1.1 of them heavy, with 2.05 in of precipitation. Plan for 8 to cover 9 years in 10; the record is 10 (2024). January 2026 had 2, 3.1 below normal.

Rain days in February

Mount Prospect averages 4.7 rain days in February, 1.1 of them heavy, with 1.95 in of precipitation. Plan for 8 to cover 9 years in 10; the record is 10 (2008). February 2026 had 0, 4.7 below normal.

Rain days in March

Mount Prospect averages 5.5 rain days in March, 1.3 of them heavy, with 2.28 in of precipitation. Plan for 8 to cover 9 years in 10; the record is 10 (1990). That is 0.5 fewer than the median Illinois location (6.0). March 2026 had 5, 0.5 below normal.

Rain days in April

Mount Prospect averages 7.5 rain days in April, 2.6 of them heavy, with 3.77 in of precipitation. Plan for 11 to cover 9 years in 10; the record is 12 (2009). April 2026 had 11, 3.5 above normal.

Rain days in May

Mount Prospect averages 8.1 rain days in May, 3.2 of them heavy, with 4.63 in of precipitation. Plan for 11 to cover 9 years in 10; the record is 13 (2019). That is 0.6 fewer than the median Illinois location (8.7). May 2026 had 4, 4.1 below normal.

Rain days in June

Mount Prospect averages 7.7 rain days in June, 2.8 of them heavy, with 4.44 in of precipitation. Plan for 12 to cover 9 years in 10; the record is 16 (2015). June 2026 had 11, 3.3 above normal.

Rain days in July

Mount Prospect averages 6.3 rain days in July, 2.1 of them heavy, with 3.68 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 15 (1987). July 2026 had 4, 2.3 below normal.

Rain days in August

Mount Prospect averages 7.3 rain days in August, 2.7 of them heavy, with 4.28 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 16 (1987). That is 1.0 more than the median Illinois location (6.3). August 2026 had 7, right on normal.

Rain days in September

Mount Prospect averages 6.1 rain days in September, 2.0 of them heavy, with 3.47 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 12 (1992). That is 0.6 more than the median Illinois location (5.5). September 2026 had 7, 0.9 above normal.

Rain days in October

Mount Prospect averages 6.5 rain days in October, 1.9 of them heavy, with 3.37 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 13 (2009). That is 0.5 more than the median Illinois location (6.0). October 2026 had 4, 2.5 below normal.

Rain days in November

Mount Prospect averages 5.2 rain days in November, 1.4 of them heavy, with 2.46 in of precipitation. Plan for 7 to cover 9 years in 10; the record is 12 (1992). That is 0.5 fewer than the median Illinois location (5.7). November 2025 had 5, right on normal.

Rain days in December

Mount Prospect averages 5.3 rain days in December, 1.2 of them heavy, with 2.16 in of precipitation. Plan for 8 to cover 9 years in 10; the record is 14 (2008). December 2025 had 4, 1.3 below normal.

Using these numbers in a construction schedule

For Mount Prospect, the normal column is the expected count: 75 days over a full year, 50 of them from April through October. Put those days in the schedule as non-work days or float before the job starts, not after it slips.

Average or plan-for? An average is exceeded about half the time. If May work has no float, carry 11 weather days for it rather than 8.1: Mount Prospect had that many or fewer in 9 of 10 years from 1991 to 2020. Use the normals across a long job and the plan-for figure only for months on the critical path.

Heavy days. Mount Prospect averages 24 days a year with 0.50 in or more, most often in May (3.2). Those are the days most likely to stop earthwork, paving and concrete outright.

Claiming time for abnormal weather. Under AIA A201-2017 §15.1.6.2, a claim for extra time because of adverse weather has to show the conditions were abnormal for the period, could not have been reasonably anticipated, and had an adverse effect on the scheduled work. The normals above show what could be anticipated in Mount Prospect; the claim also needs the day-by-day record for your site and dates.

Price a rain-day report for a site in Mount Prospect. Enter your dates to see actual rain days against this normal for free. The full PDF ($99) adds the daily record, a month-by-month comparison and a method statement you can attach to a schedule update or claim.

Check rain days near Mount Prospect

What the weather delay claim report includes

Nearby

Mount Prospect is in Cook County, which averages 77 rain days a year across the county. Mount Prospect gets 2 fewer rain days a year than that county-wide average.

The nearest larger city, Elgin (20 mi away), averages 74 rain days a year: Mount Prospect gets 1 more.

Closest other areas in Illinois:

All Illinois cities and counties

Related guides

Method and source

A rain day is a day with at least 0.10 in (2.54 mm) in PRISM's daily estimate, which covers the 24 hours ending 12:00 UTC. Heavy days use 0.50 in. Normals are 1991-2020 averages. Records run from 1981 to the last complete month. Figures are for the 4 km cell containing the Census point for Mount Prospect (42.06473, -87.939721). Data through 2026-11-24; page updated 2026-11-25. How we count rain days.

Source: PRISM Group, Oregon State University, https://prism.oregonstate.edu. These are gridded estimates, not gauge readings; conditions at a particular site can differ.