RainDayRecord

Rain days in McHenry, Illinois

McHenry averages 72 rain days a year, counting days with at least 0.10 in of precipitation in the PRISM 4 km grid cell that contains it (1991-2020 normals). May is the wettest month at 8.5 rain days and February the driest at 4.2. That is 3 fewer than the median Illinois location (75).

Quick answers

How many rain days does McHenry get a year?

About 72: that many days in a normal year bring 0.10 in or more of rain or melted snow. That makes McHenry the 525th wettest of 599 Illinois cities and towns.

What is the wettest month in McHenry?

May, with 8.5 rain days in a normal year. To cover 9 years in 10, plan for 12.

What is the driest month?

February, with 4.2 rain days (plan for 7).

How many heavy-rain days does McHenry get?

23 a year with 0.50 in or more, most often in June (3.1).

Why these counts are lower than some weather sites': a rain day here means 0.10 in or more. Counts based on 0.01 in (NOAA's "days with precipitation") or 0.04 in (WeatherSpark) also include drizzle and trace days.

Rain days by month

The wettest three months are April-June, with 24.2 rain days combined; the driest are December-February, with 13.5. June swings the most from year to year: it averages 8.0 rain days, but covering 9 years in 10 takes 12. The most rain days in a single month since 1981 was 16, in June 2010.

051015JanFebMarAprMayJunJulAugSepOctNovDec
Month Normal rain days Plan for
9 of 10 yrs
Heavy days
≥ 0.50 in
Precip (in) Record (year)
January 4.6 7 0.8 1.72 9 (2024)
February 4.2 7 0.9 1.69 9 (2008)
March 4.9 7 1.5 2.30 9 (2025)
April 7.7 11 2.4 3.79 11 (2026)
May 8.5 12 3.0 4.53 14 (2019)
June 8.0 12 3.1 4.78 16 (2010)
July 5.8 8 2.6 3.78 12 (1989)
August 6.8 9 2.4 3.66 12 (2026)
September 5.5 9 2.2 3.53 11 (2026)
October 6.2 10 1.8 3.22 14 (2009)
November 5.0 8 1.4 2.43 12 (1992)
December 4.7 7 0.9 1.97 12 (2008)
Year 72.0 23.0 37.40

Rain day: at least 0.10 in. Plan for: the 90th percentile of 1991-2020 yearly counts, rounded up to a whole day. Record: 1981 to date.

The last 12 months vs normal

From November 2025 through October 2026, McHenry had 75 rain days against a normal of 71.9: a wet stretch, 3.1 days above normal. 7 of 12 months came in above normal and 5 below. The biggest departure was September 2026, with 11 rain days against a normal of 5.5. Precipitation totaled 44.83 in against 37.40 in normally.

MonthRain daysNormalDifferencePrecip (in)Normal (in)
Nov 2025 4 5.0 -1.0 1.83 2.43
Dec 2025 5 4.7 +0.3 2.14 1.97
Jan 2026 1 4.6 -3.6 0.82 1.72
Feb 2026 0 4.2 -4.2 0.15 1.69
Mar 2026 6 4.9 +1.1 3.83 2.30
Apr 2026 11 7.7 +3.3 9.80 3.79
May 2026 4 8.5 -4.5 1.21 4.53
Jun 2026 11 8.0 +3.0 8.13 4.78
Jul 2026 6 5.8 +0.2 1.74 3.78
Aug 2026 12 6.8 +5.2 6.91 3.66
Sep 2026 11 5.5 +5.5 5.49 3.53
Oct 2026 4 6.2 -2.2 2.78 3.22

McHenry rain days month by month

Against the median Illinois location, McHenry gets more rain days in August and fewer in March, July and November, by half a day or more; other months are within half a day.

Rain days in January

McHenry averages 4.6 rain days in January, 0.8 of them heavy, with 1.72 in of precipitation. Plan for 7 to cover 9 years in 10; the record is 9 (2024). January 2026 had 1, 3.6 below normal.

Rain days in February

McHenry averages 4.2 rain days in February, 0.9 of them heavy, with 1.69 in of precipitation. Plan for 7 to cover 9 years in 10; the record is 9 (2008). February 2026 had 0, 4.2 below normal.

Rain days in March

McHenry averages 4.9 rain days in March, 1.5 of them heavy, with 2.30 in of precipitation. Plan for 7 to cover 9 years in 10; the record is 9 (2025). That is 1.1 fewer than the median Illinois location (6.0). March 2026 had 6, 1.1 above normal.

Rain days in April

McHenry averages 7.7 rain days in April, 2.4 of them heavy, with 3.79 in of precipitation. Plan for 11 to cover 9 years in 10; the record is 11 (2026). April 2026 had 11, 3.3 above normal.

Rain days in May

McHenry averages 8.5 rain days in May, 3.0 of them heavy, with 4.53 in of precipitation. Plan for 12 to cover 9 years in 10; the record is 14 (2019). May 2026 had 4, 4.5 below normal.

Rain days in June

McHenry averages 8.0 rain days in June, 3.1 of them heavy, with 4.78 in of precipitation. Plan for 12 to cover 9 years in 10; the record is 16 (2010). June 2026 had 11, 3.0 above normal.

Rain days in July

McHenry averages 5.8 rain days in July, 2.6 of them heavy, with 3.78 in of precipitation. Plan for 8 to cover 9 years in 10; the record is 12 (1989). That is 0.9 fewer than the median Illinois location (6.7). July 2026 had 6, right on normal.

Rain days in August

McHenry averages 6.8 rain days in August, 2.4 of them heavy, with 3.66 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 12 (2026). That is 0.5 more than the median Illinois location (6.3). August 2026 had 12, 5.2 above normal.

Rain days in September

McHenry averages 5.5 rain days in September, 2.2 of them heavy, with 3.53 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 11 (2026). September 2026 had 11, 5.5 above normal.

Rain days in October

McHenry averages 6.2 rain days in October, 1.8 of them heavy, with 3.22 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 14 (2009). October 2026 had 4, 2.2 below normal.

Rain days in November

McHenry averages 5.0 rain days in November, 1.4 of them heavy, with 2.43 in of precipitation. Plan for 8 to cover 9 years in 10; the record is 12 (1992). That is 0.7 fewer than the median Illinois location (5.7). November 2025 had 4, 1.0 below normal.

Rain days in December

McHenry averages 4.7 rain days in December, 0.9 of them heavy, with 1.97 in of precipitation. Plan for 7 to cover 9 years in 10; the record is 12 (2008). December 2025 had 5, right on normal.

Using these numbers in a construction schedule

For McHenry, the normal column is the expected count: 72 days over a full year, 48 of them from April through October. Put those days in the schedule as non-work days or float before the job starts, not after it slips.

Average or plan-for? An average is exceeded about half the time. If May work has no float, carry 12 weather days for it rather than 8.5: McHenry had that many or fewer in 9 of 10 years from 1991 to 2020. Use the normals across a long job and the plan-for figure only for months on the critical path.

Heavy days. McHenry averages 23 days a year with 0.50 in or more, most often in June (3.1). Those are the days most likely to stop earthwork, paving and concrete outright.

Claiming time for abnormal weather. Under AIA A201-2017 §15.1.6.2, a claim for extra time because of adverse weather has to show the conditions were abnormal for the period, could not have been reasonably anticipated, and had an adverse effect on the scheduled work. The normals above show what could be anticipated in McHenry; the claim also needs the day-by-day record for your site and dates. With the last 12 months running 3.1 rain days above normal, it is worth pulling that record now.

Price a rain-day report for a site in McHenry. Enter your dates to see actual rain days against this normal for free. The full PDF ($99) adds the daily record, a month-by-month comparison and a method statement you can attach to a schedule update or claim.

Check rain days near McHenry

What the weather delay claim report includes

Nearby

McHenry is in McHenry County, which averages 74 rain days a year across the county. McHenry gets 2 fewer rain days a year than that county-wide average.

The nearest larger city, Palatine (20 mi away), averages 76 rain days a year: McHenry gets 4 fewer.

Closest other areas in Illinois:

All Illinois cities and counties

Related guides

Method and source

A rain day is a day with at least 0.10 in (2.54 mm) in PRISM's daily estimate, which covers the 24 hours ending 12:00 UTC. Heavy days use 0.50 in. Normals are 1991-2020 averages. Records run from 1981 to the last complete month. Figures are for the 4 km cell containing the Census point for McHenry (42.336278, -88.291519). Data through 2026-11-24; page updated 2026-11-25. How we count rain days.

Source: PRISM Group, Oregon State University, https://prism.oregonstate.edu. These are gridded estimates, not gauge readings; conditions at a particular site can differ.