Rain days in Bellevue, Illinois
Bellevue averages 75 rain days a year, counting days with at least 0.10 in of precipitation in the PRISM 4 km grid cell that contains it (1991-2020 normals). May is the wettest month at 9.1 rain days and January the driest at 4.6. That is close to the Illinois median of 75.
Quick answers
How many rain days does Bellevue get a year?
About 75: that many days in a normal year bring 0.10 in or more of rain or melted snow. That makes Bellevue the 290th wettest of 599 Illinois cities and towns.
What is the wettest month in Bellevue?
May, with 9.1 rain days in a normal year. To cover 9 years in 10, plan for 14.
What is the driest month?
January, with 4.6 rain days (plan for 8).
How many heavy-rain days does Bellevue get?
24 a year with 0.50 in or more, most often in May (2.9).
Why these counts are lower than some weather sites': a rain day here means 0.10 in or more. Counts based on 0.01 in (NOAA's "days with precipitation") or 0.04 in (WeatherSpark) also include drizzle and trace days.
Rain days by month
The wettest three months are April-June, with 24.7 rain days combined; the driest are December-February, with 14.3. May is also the least predictable month, with the widest gap between its average and its plan-for number. The most rain days in a single month since 1981 was 17, in May 2019.
| Month | Normal rain days | Plan for 9 of 10 yrs |
Heavy days ≥ 0.50 in |
Precip (in) | Record (year) |
|---|---|---|---|---|---|
| January | 4.6 | 8 | 1.1 | 2.13 | 9 (1997) |
| February | 4.6 | 7 | 1.1 | 2.05 | 8 (2023) |
| March | 6.3 | 10 | 1.5 | 2.71 | 13 (1982) |
| April | 7.7 | 10 | 2.6 | 3.94 | 14 (2011) |
| May | 9.1 | 14 | 2.9 | 4.85 | 17 (2019) |
| June | 7.9 | 12 | 2.8 | 4.20 | 16 (1998) |
| July | 6.5 | 9 | 2.3 | 3.64 | 15 (1992) |
| August | 6.3 | 10 | 2.5 | 3.20 | 12 (1997) |
| September | 5.3 | 7 | 2.2 | 3.65 | 12 (2019) |
| October | 6.4 | 11 | 2.2 | 3.14 | 12 (2009) |
| November | 5.8 | 10 | 1.9 | 2.79 | 15 (1992) |
| December | 5.1 | 7 | 1.1 | 2.18 | 11 (2007) |
| Year | 75.4 | 24.4 | 38.48 |
Rain day: at least 0.10 in. Plan for: the 90th percentile of 1991-2020 yearly counts, rounded up to a whole day. Record: 1981 to date.
The last 12 months vs normal
From November 2025 through October 2026, Bellevue had 72 rain days against a normal of 75.6: a dry stretch, 3.6 days below normal. 6 of 12 months came in above normal and 6 below. The biggest departure was February 2026, with 1 rain days against a normal of 4.6. Precipitation totaled 43.03 in against 38.48 in normally.
| Month | Rain days | Normal | Difference | Precip (in) | Normal (in) |
|---|---|---|---|---|---|
| Nov 2025 | 6 | 5.8 | +0.2 | 1.86 | 2.79 |
| Dec 2025 | 6 | 5.1 | +0.9 | 2.20 | 2.18 |
| Jan 2026 | 3 | 4.6 | -1.6 | 1.25 | 2.13 |
| Feb 2026 | 1 | 4.6 | -3.6 | 0.39 | 2.05 |
| Mar 2026 | 6 | 6.3 | -0.3 | 3.65 | 2.71 |
| Apr 2026 | 10 | 7.7 | +2.3 | 7.62 | 3.94 |
| May 2026 | 6 | 9.1 | -3.1 | 1.78 | 4.85 |
| Jun 2026 | 8 | 7.9 | +0.1 | 9.54 | 4.20 |
| Jul 2026 | 5 | 6.5 | -1.5 | 1.53 | 3.64 |
| Aug 2026 | 9 | 6.3 | +2.7 | 7.56 | 3.20 |
| Sep 2026 | 6 | 5.3 | +0.7 | 3.49 | 3.65 |
| Oct 2026 | 6 | 6.4 | -0.4 | 2.16 | 3.14 |
Bellevue rain days month by month
Every month in Bellevue is within half a rain day of the median Illinois location.
Rain days in January
Bellevue averages 4.6 rain days in January, 1.1 of them heavy, with 2.13 in of precipitation. Plan for 8 to cover 9 years in 10; the record is 9 (1997). January 2026 had 3, 1.6 below normal.
Rain days in February
Bellevue averages 4.6 rain days in February, 1.1 of them heavy, with 2.05 in of precipitation. Plan for 7 to cover 9 years in 10; the record is 8 (2023). February 2026 had 1, 3.6 below normal.
Rain days in March
Bellevue averages 6.3 rain days in March, 1.5 of them heavy, with 2.71 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 13 (1982). March 2026 had 6, right on normal.
Rain days in April
Bellevue averages 7.7 rain days in April, 2.6 of them heavy, with 3.94 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 14 (2011). April 2026 had 10, 2.3 above normal.
Rain days in May
Bellevue averages 9.1 rain days in May, 2.9 of them heavy, with 4.85 in of precipitation. Plan for 14 to cover 9 years in 10; the record is 17 (2019). May 2026 had 6, 3.1 below normal.
Rain days in June
Bellevue averages 7.9 rain days in June, 2.8 of them heavy, with 4.20 in of precipitation. Plan for 12 to cover 9 years in 10; the record is 16 (1998). June 2026 had 8, right on normal.
Rain days in July
Bellevue averages 6.5 rain days in July, 2.3 of them heavy, with 3.64 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 15 (1992). July 2026 had 5, 1.5 below normal.
Rain days in August
Bellevue averages 6.3 rain days in August, 2.5 of them heavy, with 3.20 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 12 (1997). August 2026 had 9, 2.7 above normal.
Rain days in September
Bellevue averages 5.3 rain days in September, 2.2 of them heavy, with 3.65 in of precipitation. Plan for 7 to cover 9 years in 10; the record is 12 (2019). September 2026 had 6, 0.7 above normal.
Rain days in October
Bellevue averages 6.4 rain days in October, 2.2 of them heavy, with 3.14 in of precipitation. Plan for 11 to cover 9 years in 10; the record is 12 (2009). October 2026 had 6, right on normal.
Rain days in November
Bellevue averages 5.8 rain days in November, 1.9 of them heavy, with 2.79 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 15 (1992). November 2025 had 6, right on normal.
Rain days in December
Bellevue averages 5.1 rain days in December, 1.1 of them heavy, with 2.18 in of precipitation. Plan for 7 to cover 9 years in 10; the record is 11 (2007). December 2025 had 6, 0.9 above normal.
Using these numbers in a construction schedule
For Bellevue, the normal column is the expected count: 75 days over a full year, 49 of them from April through October. Put those days in the schedule as non-work days or float before the job starts, not after it slips.
Average or plan-for? An average is exceeded about half the time. If May work has no float, carry 14 weather days for it rather than 9.1: Bellevue had that many or fewer in 9 of 10 years from 1991 to 2020. Use the normals across a long job and the plan-for figure only for months on the critical path.
Heavy days. Bellevue averages 24 days a year with 0.50 in or more, most often in May (2.9). Those are the days most likely to stop earthwork, paving and concrete outright.
Claiming time for abnormal weather. Under AIA A201-2017 §15.1.6.2, a claim for extra time because of adverse weather has to show the conditions were abnormal for the period, could not have been reasonably anticipated, and had an adverse effect on the scheduled work. The normals above show what could be anticipated in Bellevue; the claim also needs the day-by-day record for your site and dates.
Price a rain-day report for a site in Bellevue. Enter your dates to see actual rain days against this normal for free. The full PDF ($99) adds the daily record, a month-by-month comparison and a method statement you can attach to a schedule update or claim.
Check rain days near BellevueNearby
Bellevue is in Peoria County, which averages 76 rain days a year across the county. The two numbers are close but measure different things: the county figure averages all 99 of the county's grid cells, while Bellevue's is the single 4 km cell at its Census point. A site elsewhere in Peoria County can differ from both.
The nearest larger city, Peoria (5 mi away), averages 76 rain days a year, about the same as Bellevue.
Closest other areas in Illinois:
- West Peoria, Illinois: 76 rain days / yr, 2 mi
- Bartonville, Illinois: 75 rain days / yr, 3 mi
- Creve Coeur, Illinois: 75 rain days / yr, 5 mi
- Peoria, Illinois: 76 rain days / yr, 5 mi
- Marquette Heights, Illinois: 75 rain days / yr, 6 mi
- Peoria Heights, Illinois: 76 rain days / yr, 7 mi
- East Peoria, Illinois: 74 rain days / yr, 7 mi
- Hanna City, Illinois: 76 rain days / yr, 7 mi
All Illinois cities and counties
Related guides
- AIA A201 Weather Delay Claims (ยง15.1.6.2): The Three Tests, With Real Numbers
- How Many Weather Days to Put in a Construction Schedule (Normal vs Plan-For)
- How to Document Weather Delays on a Construction Project (Checklist + Daily Log)
Method and source
A rain day is a day with at least 0.10 in (2.54 mm) in PRISM's daily estimate, which covers the 24 hours ending 12:00 UTC. Heavy days use 0.50 in. Normals are 1991-2020 averages. Records run from 1981 to the last complete month. Figures are for the 4 km cell containing the Census point for Bellevue (40.687644, -89.673193). Data through 2026-11-24; page updated 2026-11-25. How we count rain days.
Source: PRISM Group, Oregon State University, https://prism.oregonstate.edu. These are gridded estimates, not gauge readings; conditions at a particular site can differ.