Rain days in Orange City, Florida
Orange City averages 93 rain days a year, counting days with at least 0.10 in of precipitation in the PRISM 4 km grid cell that contains it (1991-2020 normals). August is the wettest month at 14.2 rain days and December the driest at 3.9. That is close to the Florida median of 93.
Quick answers
How many rain days does Orange City get a year?
About 93: that many days in a normal year bring 0.10 in or more of rain or melted snow. That makes Orange City the 151st wettest of 309 Florida cities and towns.
What is the wettest month in Orange City?
August, with 14.2 rain days in a normal year. To cover 9 years in 10, plan for 18.
What is the driest month?
December, with 3.9 rain days (plan for 8).
How many heavy-rain days does Orange City get?
35 a year with 0.50 in or more, most often in July (6.0).
Why these counts are lower than some weather sites': a rain day here means 0.10 in or more. Counts based on 0.01 in (NOAA's "days with precipitation") or 0.04 in (WeatherSpark) also include drizzle and trace days.
Rain days by month
The wettest three months are June-August, with 41.7 rain days combined; the driest are November-January, with 12.5. July swings the most from year to year: it averages 13.8 rain days, but covering 9 years in 10 takes 20. The most rain days in a single month since 1981 was 24, in August 2004.
| Month | Normal rain days | Plan for 9 of 10 yrs |
Heavy days ≥ 0.50 in |
Precip (in) | Record (year) |
|---|---|---|---|---|---|
| January | 4.6 | 7 | 1.9 | 2.87 | 8 (2016) |
| February | 4.7 | 7 | 1.6 | 2.35 | 10 (1983) |
| March | 4.9 | 9 | 2.1 | 3.17 | 13 (2003) |
| April | 4.6 | 8 | 1.8 | 2.56 | 11 (1991) |
| May | 6.5 | 9 | 2.3 | 3.65 | 15 (2018) |
| June | 13.7 | 19 | 5.5 | 8.07 | 21 (2002) |
| July | 13.8 | 20 | 6.0 | 8.49 | 22 (2002) |
| August | 14.2 | 18 | 4.7 | 7.85 | 24 (2004) |
| September | 11.1 | 14 | 4.1 | 6.82 | 21 (1992) |
| October | 7.0 | 11 | 2.3 | 3.99 | 14 (1995) |
| November | 4.0 | 7 | 1.2 | 2.27 | 9 (1987) |
| December | 3.9 | 8 | 1.5 | 2.40 | 14 (1997) |
| Year | 93.1 | 35.1 | 54.49 |
Rain day: at least 0.10 in. Plan for: the 90th percentile of 1991-2020 yearly counts, rounded up to a whole day. Record: 1981 to date.
The last 12 months vs normal
From November 2025 through October 2026, Orange City had 94 rain days against a normal of 93, close to normal overall. 6 of 12 months came in above normal and 6 below. The biggest departure was October 2026, with 13 rain days against a normal of 7.0. Precipitation totaled 48.11 in against 54.49 in normally.
| Month | Rain days | Normal | Difference | Precip (in) | Normal (in) |
|---|---|---|---|---|---|
| Nov 2025 | 1 | 4.0 | -3.0 | 0.74 | 2.27 |
| Dec 2025 | 2 | 3.9 | -1.9 | 1.50 | 2.40 |
| Jan 2026 | 2 | 4.6 | -2.6 | 0.86 | 2.87 |
| Feb 2026 | 3 | 4.7 | -1.7 | 1.20 | 2.35 |
| Mar 2026 | 6 | 4.9 | +1.1 | 2.89 | 3.17 |
| Apr 2026 | 6 | 4.6 | +1.4 | 1.87 | 2.56 |
| May 2026 | 11 | 6.5 | +4.5 | 5.44 | 3.65 |
| Jun 2026 | 12 | 13.7 | -1.7 | 3.99 | 8.07 |
| Jul 2026 | 15 | 13.8 | +1.2 | 9.52 | 8.49 |
| Aug 2026 | 9 | 14.2 | -5.2 | 4.51 | 7.85 |
| Sep 2026 | 14 | 11.1 | +2.9 | 6.68 | 6.82 |
| Oct 2026 | 13 | 7.0 | +6.0 | 8.91 | 3.99 |
Orange City rain days month by month
Against the median Florida location, Orange City gets more rain days in June and October, by half a day or more; other months are within half a day.
Rain days in January
Orange City averages 4.6 rain days in January, 1.9 of them heavy, with 2.87 in of precipitation. Plan for 7 to cover 9 years in 10; the record is 8 (2016). January 2026 had 2, 2.6 below normal.
Rain days in February
Orange City averages 4.7 rain days in February, 1.6 of them heavy, with 2.35 in of precipitation. Plan for 7 to cover 9 years in 10; the record is 10 (1983). February 2026 had 3, 1.7 below normal.
Rain days in March
Orange City averages 4.9 rain days in March, 2.1 of them heavy, with 3.17 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 13 (2003). March 2026 had 6, 1.1 above normal.
Rain days in April
Orange City averages 4.6 rain days in April, 1.8 of them heavy, with 2.56 in of precipitation. Plan for 8 to cover 9 years in 10; the record is 11 (1991). April 2026 had 6, 1.4 above normal.
Rain days in May
Orange City averages 6.5 rain days in May, 2.3 of them heavy, with 3.65 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 15 (2018). May 2026 had 11, 4.5 above normal.
Rain days in June
Orange City averages 13.7 rain days in June, 5.5 of them heavy, with 8.07 in of precipitation. Plan for 19 to cover 9 years in 10; the record is 21 (2002). That is 0.7 more than the median Florida location (13.0). June 2026 had 12, 1.7 below normal.
Rain days in July
Orange City averages 13.8 rain days in July, 6.0 of them heavy, with 8.49 in of precipitation. Plan for 20 to cover 9 years in 10; the record is 22 (2002). July 2026 had 15, 1.2 above normal.
Rain days in August
Orange City averages 14.2 rain days in August, 4.7 of them heavy, with 7.85 in of precipitation. Plan for 18 to cover 9 years in 10; the record is 24 (2004). August 2026 had 9, 5.2 below normal.
Rain days in September
Orange City averages 11.1 rain days in September, 4.1 of them heavy, with 6.82 in of precipitation. Plan for 14 to cover 9 years in 10; the record is 21 (1992). September 2026 had 14, 2.9 above normal.
Rain days in October
Orange City averages 7.0 rain days in October, 2.3 of them heavy, with 3.99 in of precipitation. Plan for 11 to cover 9 years in 10; the record is 14 (1995). That is 0.9 more than the median Florida location (6.1). October 2026 had 13, 6.0 above normal.
Rain days in November
Orange City averages 4.0 rain days in November, 1.2 of them heavy, with 2.27 in of precipitation. Plan for 7 to cover 9 years in 10; the record is 9 (1987). November 2025 had 1, 3.0 below normal.
Rain days in December
Orange City averages 3.9 rain days in December, 1.5 of them heavy, with 2.40 in of precipitation. Plan for 8 to cover 9 years in 10; the record is 14 (1997). December 2025 had 2, 1.9 below normal.
Using these numbers in a construction schedule
For Orange City, the normal column is the expected count: 93 days over a full year, 71 of them from April through October. Put those days in the schedule as non-work days or float before the job starts, not after it slips.
Average or plan-for? An average is exceeded about half the time. If August work has no float, carry 18 weather days for it rather than 14.2: Orange City had that many or fewer in 9 of 10 years from 1991 to 2020. Use the normals across a long job and the plan-for figure only for months on the critical path.
Heavy days. Orange City averages 35 days a year with 0.50 in or more, most often in July (6.0). Those are the days most likely to stop earthwork, paving and concrete outright.
Claiming time for abnormal weather. Under AIA A201-2017 §15.1.6.2, a claim for extra time because of adverse weather has to show the conditions were abnormal for the period, could not have been reasonably anticipated, and had an adverse effect on the scheduled work. The normals above show what could be anticipated in Orange City; the claim also needs the day-by-day record for your site and dates.
Price a rain-day report for a site in Orange City. Enter your dates to see actual rain days against this normal for free. The full PDF ($99) adds the daily record, a month-by-month comparison and a method statement you can attach to a schedule update or claim.
Check rain days near Orange CityNearby
Orange City is in Volusia County, which averages 94 rain days a year across the county. Orange City gets 1 fewer rain days a year than that county-wide average.
The nearest larger city, Deltona (5 mi away), averages 94 rain days a year, about the same as Orange City.
Closest other areas in Florida:
- Lake Helen, Florida: 92 rain days / yr, 5 mi
- DeBary, Florida: 92 rain days / yr, 5 mi
- Deltona, Florida: 94 rain days / yr, 5 mi
- DeLand, Florida: 90 rain days / yr, 6 mi
- Sanford, Florida: 86 rain days / yr, 11 mi
- Volusia County, Florida: 94 rain days / yr, 11 mi
- Lake Mary, Florida: 92 rain days / yr, 12 mi
- Winter Springs, Florida: 96 rain days / yr, 17 mi
All Florida cities and counties
Related guides
- AIA A201 Weather Delay Claims (ยง15.1.6.2): The Three Tests, With Real Numbers
- How Many Weather Days to Put in a Construction Schedule (Normal vs Plan-For)
- How to Document Weather Delays on a Construction Project (Checklist + Daily Log)
Method and source
A rain day is a day with at least 0.10 in (2.54 mm) in PRISM's daily estimate, which covers the 24 hours ending 12:00 UTC. Heavy days use 0.50 in. Normals are 1991-2020 averages. Records run from 1981 to the last complete month. Figures are for the 4 km cell containing the Census point for Orange City (28.93728, -81.283339). Data through 2026-11-24; page updated 2026-11-25. How we count rain days.
Source: PRISM Group, Oregon State University, https://prism.oregonstate.edu. These are gridded estimates, not gauge readings; conditions at a particular site can differ.