RainDayRecord

Rain days in Edgewater, Florida

Edgewater averages 97 rain days a year, counting days with at least 0.10 in of precipitation in the PRISM 4 km grid cell that contains it (1991-2020 normals). August is the wettest month at 14.5 rain days and November the driest at 4.4. That is 4 more than the median Florida location (93).

Quick answers

How many rain days does Edgewater get a year?

About 97: that many days in a normal year bring 0.10 in or more of rain or melted snow. That makes Edgewater the 117th wettest of 309 Florida cities and towns.

What is the wettest month in Edgewater?

August, with 14.5 rain days in a normal year. To cover 9 years in 10, plan for 19.

What is the driest month?

November, with 4.4 rain days (plan for 7).

How many heavy-rain days does Edgewater get?

34 a year with 0.50 in or more, most often in June (4.8).

Why these counts are lower than some weather sites': a rain day here means 0.10 in or more. Counts based on 0.01 in (NOAA's "days with precipitation") or 0.04 in (WeatherSpark) also include drizzle and trace days.

Rain days by month

The wettest three months are June-August, with 41.2 rain days combined; the driest are November-January, with 14.1. July swings the most from year to year: it averages 13.3 rain days, but covering 9 years in 10 takes 19. The most rain days in a single month since 1981 was 24, in August 2004.

05101520JanFebMarAprMayJunJulAugSepOctNovDec
Month Normal rain days Plan for
9 of 10 yrs
Heavy days
≥ 0.50 in
Precip (in) Record (year)
January 5.2 8 1.7 2.87 10 (1994)
February 4.6 7 1.6 2.36 12 (1981)
March 5.6 10 2.2 3.38 14 (1996)
April 5.0 9 1.8 2.57 13 (1991)
May 6.3 9 2.3 3.60 17 (2018)
June 13.4 18 4.8 7.04 22 (2002)
July 13.3 19 4.6 6.67 22 (1991)
August 14.5 19 4.6 7.23 24 (2004)
September 12.3 17 4.4 7.39 23 (2001)
October 7.8 12 3.1 4.87 15 (2007)
November 4.4 7 1.2 2.60 13 (1987)
December 4.5 8 1.4 2.52 17 (1997)
Year 96.8 33.6 53.09

Rain day: at least 0.10 in. Plan for: the 90th percentile of 1991-2020 yearly counts, rounded up to a whole day. Record: 1981 to date.

The last 12 months vs normal

From November 2025 through October 2026, Edgewater had 98 rain days against a normal of 96.9, close to normal overall. 5 of 12 months came in above normal and 6 below. The biggest departure was May 2026, with 11 rain days against a normal of 6.3. Precipitation totaled 50.84 in against 53.10 in normally.

MonthRain daysNormalDifferencePrecip (in)Normal (in)
Nov 2025 1 4.4 -3.4 0.77 2.60
Dec 2025 2 4.5 -2.5 2.08 2.52
Jan 2026 3 5.2 -2.2 1.22 2.87
Feb 2026 2 4.6 -2.6 1.13 2.36
Mar 2026 3 5.6 -2.6 1.18 3.38
Apr 2026 5 5.0 +0.0 2.04 2.57
May 2026 11 6.3 +4.7 4.81 3.60
Jun 2026 12 13.4 -1.4 6.92 7.04
Jul 2026 16 13.3 +2.7 8.60 6.67
Aug 2026 15 14.5 +0.5 6.61 7.23
Sep 2026 16 12.3 +3.7 8.11 7.39
Oct 2026 12 7.8 +4.2 7.37 4.87

Edgewater rain days month by month

Against the median Florida location, Edgewater gets more rain days in March, September and October and fewer in July, by half a day or more; other months are within half a day.

Rain days in January

Edgewater averages 5.2 rain days in January, 1.7 of them heavy, with 2.87 in of precipitation. Plan for 8 to cover 9 years in 10; the record is 10 (1994). January 2026 had 3, 2.2 below normal.

Rain days in February

Edgewater averages 4.6 rain days in February, 1.6 of them heavy, with 2.36 in of precipitation. Plan for 7 to cover 9 years in 10; the record is 12 (1981). February 2026 had 2, 2.6 below normal.

Rain days in March

Edgewater averages 5.6 rain days in March, 2.2 of them heavy, with 3.38 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 14 (1996). That is 0.5 more than the median Florida location (5.1). March 2026 had 3, 2.6 below normal.

Rain days in April

Edgewater averages 5.0 rain days in April, 1.8 of them heavy, with 2.57 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 13 (1991). April 2026 had 5, right on normal.

Rain days in May

Edgewater averages 6.3 rain days in May, 2.3 of them heavy, with 3.60 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 17 (2018). May 2026 had 11, 4.7 above normal.

Rain days in June

Edgewater averages 13.4 rain days in June, 4.8 of them heavy, with 7.04 in of precipitation. Plan for 18 to cover 9 years in 10; the record is 22 (2002). June 2026 had 12, 1.4 below normal.

Rain days in July

Edgewater averages 13.3 rain days in July, 4.6 of them heavy, with 6.67 in of precipitation. Plan for 19 to cover 9 years in 10; the record is 22 (1991). That is 0.8 fewer than the median Florida location (14.1). July 2026 had 16, 2.7 above normal.

Rain days in August

Edgewater averages 14.5 rain days in August, 4.6 of them heavy, with 7.23 in of precipitation. Plan for 19 to cover 9 years in 10; the record is 24 (2004). August 2026 had 15, 0.5 above normal.

Rain days in September

Edgewater averages 12.3 rain days in September, 4.4 of them heavy, with 7.39 in of precipitation. Plan for 17 to cover 9 years in 10; the record is 23 (2001). That is 1.0 more than the median Florida location (11.3). September 2026 had 16, 3.7 above normal.

Rain days in October

Edgewater averages 7.8 rain days in October, 3.1 of them heavy, with 4.87 in of precipitation. Plan for 12 to cover 9 years in 10; the record is 15 (2007). That is 1.7 more than the median Florida location (6.1). October 2026 had 12, 4.2 above normal.

Rain days in November

Edgewater averages 4.4 rain days in November, 1.2 of them heavy, with 2.60 in of precipitation. Plan for 7 to cover 9 years in 10; the record is 13 (1987). November 2025 had 1, 3.4 below normal.

Rain days in December

Edgewater averages 4.5 rain days in December, 1.4 of them heavy, with 2.52 in of precipitation. Plan for 8 to cover 9 years in 10; the record is 17 (1997). December 2025 had 2, 2.5 below normal.

Using these numbers in a construction schedule

For Edgewater, the normal column is the expected count: 97 days over a full year, 73 of them from April through October. Put those days in the schedule as non-work days or float before the job starts, not after it slips.

Average or plan-for? An average is exceeded about half the time. If August work has no float, carry 19 weather days for it rather than 14.5: Edgewater had that many or fewer in 9 of 10 years from 1991 to 2020. Use the normals across a long job and the plan-for figure only for months on the critical path.

Heavy days. Edgewater averages 34 days a year with 0.50 in or more, most often in June (4.8). Those are the days most likely to stop earthwork, paving and concrete outright.

Claiming time for abnormal weather. Under AIA A201-2017 §15.1.6.2, a claim for extra time because of adverse weather has to show the conditions were abnormal for the period, could not have been reasonably anticipated, and had an adverse effect on the scheduled work. The normals above show what could be anticipated in Edgewater; the claim also needs the day-by-day record for your site and dates.

Price a rain-day report for a site in Edgewater. Enter your dates to see actual rain days against this normal for free. The full PDF ($99) adds the daily record, a month-by-month comparison and a method statement you can attach to a schedule update or claim.

Check rain days near Edgewater

What the weather delay claim report includes

Nearby

Edgewater is in Volusia County, which averages 94 rain days a year across the county. Edgewater gets 3 more rain days a year than that county-wide average.

The nearest larger city, Port Orange (12 mi away), averages 87 rain days a year: Edgewater gets 10 more.

Closest other areas in Florida:

All Florida cities and counties

Related guides

Method and source

A rain day is a day with at least 0.10 in (2.54 mm) in PRISM's daily estimate, which covers the 24 hours ending 12:00 UTC. Heavy days use 0.50 in. Normals are 1991-2020 averages. Records run from 1981 to the last complete month. Figures are for the 4 km cell containing the Census point for Edgewater (28.956811, -80.941188). Data through 2026-11-24; page updated 2026-11-25. How we count rain days.

Source: PRISM Group, Oregon State University, https://prism.oregonstate.edu. These are gridded estimates, not gauge readings; conditions at a particular site can differ.