Rain days in Telluride, Colorado
Telluride averages 85 rain days a year, counting days with at least 0.10 in of precipitation in the PRISM 4 km grid cell that contains it (1991-2020 normals). August is the wettest month at 9.6 rain days and June the driest at 3.1. That is 42 more than the median Colorado location (43).
Quick answers
How many rain days does Telluride get a year?
About 85: that many days in a normal year bring 0.10 in or more of rain or melted snow. That makes Telluride the 2nd wettest of 149 Colorado cities and towns.
What is the wettest month in Telluride?
August, with 9.6 rain days in a normal year. To cover 9 years in 10, plan for 14.
What is the driest month?
June, with 3.1 rain days (plan for 7).
How many heavy-rain days does Telluride get?
11 a year with 0.50 in or more, most often in October (1.3).
Why these counts are lower than some weather sites': a rain day here means 0.10 in or more. Counts based on 0.01 in (NOAA's "days with precipitation") or 0.04 in (WeatherSpark) also include drizzle and trace days.
Rain days by month
The wettest three months are July-September, with 25.3 rain days combined; the driest are May-July, with 17.2. January swings the most from year to year: it averages 7.1 rain days, but covering 9 years in 10 takes 13. The most rain days in a single month since 1981 was 23, in August 1999.
| Month | Normal rain days | Plan for 9 of 10 yrs |
Heavy days ≥ 0.50 in |
Precip (in) | Record (year) |
|---|---|---|---|---|---|
| January | 7.1 | 13 | 1.2 | 2.50 | 15 (2017) |
| February | 7.7 | 11 | 1.1 | 2.66 | 17 (2008) |
| March | 7.7 | 12 | 0.8 | 2.51 | 16 (1983) |
| April | 8.6 | 13 | 0.8 | 2.64 | 14 (1999) |
| May | 5.8 | 10 | 0.6 | 1.86 | 19 (2015) |
| June | 3.1 | 7 | 0.4 | 1.03 | 12 (1983) |
| July | 8.3 | 14 | 1.0 | 2.66 | 18 (1999) |
| August | 9.6 | 14 | 0.5 | 2.72 | 23 (1999) |
| September | 7.4 | 10 | 1.2 | 2.63 | 15 (2013) |
| October | 6.1 | 11 | 1.3 | 2.33 | 15 (1984) |
| November | 6.5 | 11 | 1.2 | 2.39 | 15 (1994) |
| December | 7.2 | 10 | 1.0 | 2.55 | 21 (1983) |
| Year | 85.0 | 11.0 | 28.47 |
Rain day: at least 0.10 in. Plan for: the 90th percentile of 1991-2020 yearly counts, rounded up to a whole day. Record: 1981 to date.
The last 12 months vs normal
From November 2025 through October 2026, Telluride had 81 rain days against a normal of 85.1: a dry stretch, 4.1 days below normal. 3 of 12 months came in above normal and 9 below. The biggest departure was July 2026, with 15 rain days against a normal of 8.3. Precipitation totaled 29.61 in against 28.48 in normally.
| Month | Rain days | Normal | Difference | Precip (in) | Normal (in) |
|---|---|---|---|---|---|
| Nov 2025 | 4 | 6.5 | -2.5 | 1.43 | 2.39 |
| Dec 2025 | 5 | 7.2 | -2.2 | 1.46 | 2.55 |
| Jan 2026 | 4 | 7.1 | -3.1 | 1.46 | 2.50 |
| Feb 2026 | 7 | 7.7 | -0.7 | 1.95 | 2.66 |
| Mar 2026 | 2 | 7.7 | -5.7 | 0.30 | 2.51 |
| Apr 2026 | 6 | 8.6 | -2.6 | 2.76 | 2.64 |
| May 2026 | 3 | 5.8 | -2.8 | 0.79 | 1.86 |
| Jun 2026 | 2 | 3.1 | -1.1 | 0.46 | 1.03 |
| Jul 2026 | 15 | 8.3 | +6.7 | 3.14 | 2.66 |
| Aug 2026 | 8 | 9.6 | -1.6 | 2.15 | 2.72 |
| Sep 2026 | 13 | 7.4 | +5.6 | 6.01 | 2.63 |
| Oct 2026 | 12 | 6.1 | +5.9 | 7.70 | 2.33 |
Telluride rain days month by month
Against the median Colorado location, Telluride gets more rain days in January, February, March, April, July, August, September, October, November and December and fewer in June, by half a day or more; other months are within half a day.
Rain days in January
Telluride averages 7.1 rain days in January, 1.2 of them heavy, with 2.50 in of precipitation. Plan for 13 to cover 9 years in 10; the record is 15 (2017). That is 5.1 more than the median Colorado location (2.0). January 2026 had 4, 3.1 below normal.
Rain days in February
Telluride averages 7.7 rain days in February, 1.1 of them heavy, with 2.66 in of precipitation. Plan for 11 to cover 9 years in 10; the record is 17 (2008). That is 5.5 more than the median Colorado location (2.2). February 2026 had 7, 0.7 below normal.
Rain days in March
Telluride averages 7.7 rain days in March, 0.8 of them heavy, with 2.51 in of precipitation. Plan for 12 to cover 9 years in 10; the record is 16 (1983). That is 4.6 more than the median Colorado location (3.1). March 2026 had 2, 5.7 below normal.
Rain days in April
Telluride averages 8.6 rain days in April, 0.8 of them heavy, with 2.64 in of precipitation. Plan for 13 to cover 9 years in 10; the record is 14 (1999). That is 4.0 more than the median Colorado location (4.6). April 2026 had 6, 2.6 below normal.
Rain days in May
Telluride averages 5.8 rain days in May, 0.6 of them heavy, with 1.86 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 19 (2015). May 2026 had 3, 2.8 below normal.
Rain days in June
Telluride averages 3.1 rain days in June, 0.4 of them heavy, with 1.03 in of precipitation. Plan for 7 to cover 9 years in 10; the record is 12 (1983). That is 0.8 fewer than the median Colorado location (3.9). June 2026 had 2, 1.1 below normal.
Rain days in July
Telluride averages 8.3 rain days in July, 1.0 of them heavy, with 2.66 in of precipitation. Plan for 14 to cover 9 years in 10; the record is 18 (1999). That is 3.2 more than the median Colorado location (5.1). July 2026 had 15, 6.7 above normal.
Rain days in August
Telluride averages 9.6 rain days in August, 0.5 of them heavy, with 2.72 in of precipitation. Plan for 14 to cover 9 years in 10; the record is 23 (1999). That is 4.7 more than the median Colorado location (4.9). August 2026 had 8, 1.6 below normal.
Rain days in September
Telluride averages 7.4 rain days in September, 1.2 of them heavy, with 2.63 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 15 (2013). That is 3.9 more than the median Colorado location (3.5). September 2026 had 13, 5.6 above normal.
Rain days in October
Telluride averages 6.1 rain days in October, 1.3 of them heavy, with 2.33 in of precipitation. Plan for 11 to cover 9 years in 10; the record is 15 (1984). That is 3.0 more than the median Colorado location (3.1). October 2026 had 12, 5.9 above normal.
Rain days in November
Telluride averages 6.5 rain days in November, 1.2 of them heavy, with 2.39 in of precipitation. Plan for 11 to cover 9 years in 10; the record is 15 (1994). That is 4.1 more than the median Colorado location (2.4). November 2025 had 4, 2.5 below normal.
Rain days in December
Telluride averages 7.2 rain days in December, 1.0 of them heavy, with 2.55 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 21 (1983). That is 5.3 more than the median Colorado location (1.9). December 2025 had 5, 2.2 below normal.
Using these numbers in a construction schedule
For Telluride, the normal column is the expected count: 85 days over a full year, 49 of them from April through October. Put those days in the schedule as non-work days or float before the job starts, not after it slips.
Average or plan-for? An average is exceeded about half the time. If August work has no float, carry 14 weather days for it rather than 9.6: Telluride had that many or fewer in 9 of 10 years from 1991 to 2020. Use the normals across a long job and the plan-for figure only for months on the critical path.
Heavy days. Telluride averages 11 days a year with 0.50 in or more, most often in October (1.3). Those are the days most likely to stop earthwork, paving and concrete outright.
Claiming time for abnormal weather. Under AIA A201-2017 §15.1.6.2, a claim for extra time because of adverse weather has to show the conditions were abnormal for the period, could not have been reasonably anticipated, and had an adverse effect on the scheduled work. The normals above show what could be anticipated in Telluride; the claim also needs the day-by-day record for your site and dates.
Price a rain-day report for a site in Telluride. Enter your dates to see actual rain days against this normal for free. The full PDF ($99) adds the daily record, a month-by-month comparison and a method statement you can attach to a schedule update or claim.
Check rain days near TellurideNearby
Telluride is in San Miguel County, which averages 61 rain days a year across the county. Telluride gets 24 more rain days a year than that county-wide average.
The nearest larger city, Grand Junction (89 mi away), averages 30 rain days a year: Telluride gets 55 more.
Closest other areas in Colorado:
- Mountain Village, Colorado: 75 rain days / yr, 2 mi
- San Juan County, Colorado: 104 rain days / yr, 14 mi
- Ouray County, Colorado: 74 rain days / yr, 15 mi
- Ridgway, Colorado: 48 rain days / yr, 15 mi
- Hinsdale County, Colorado: 83 rain days / yr, 25 mi
- San Miguel County, Colorado: 61 rain days / yr, 34 mi
- Montrose, Colorado: 34 rain days / yr, 37 mi
- Dolores County, Colorado: 62 rain days / yr, 40 mi
All Colorado cities and counties
Related guides
- AIA A201 Weather Delay Claims (ยง15.1.6.2): The Three Tests, With Real Numbers
- How Many Weather Days to Put in a Construction Schedule (Normal vs Plan-For)
- How to Document Weather Delays on a Construction Project (Checklist + Daily Log)
Method and source
A rain day is a day with at least 0.10 in (2.54 mm) in PRISM's daily estimate, which covers the 24 hours ending 12:00 UTC. Heavy days use 0.50 in. Normals are 1991-2020 averages. Records run from 1981 to the last complete month. Figures are for the 4 km cell containing the Census point for Telluride (37.940233, -107.818152). Data through 2026-11-24; page updated 2026-11-25. How we count rain days.
Source: PRISM Group, Oregon State University, https://prism.oregonstate.edu. These are gridded estimates, not gauge readings; conditions at a particular site can differ.