Rain days in Kremmling, Colorado

Kremmling averages 38 rain days a year, counting days with at least 0.10 in of precipitation in the PRISM 4 km grid cell that contains it (1991-2020 normals). August is the wettest month at 4.5 rain days and January the driest at 2.3. That is 4 fewer than the median Colorado location (43).

Quick answers

How many rain days does Kremmling get a year?

About 38: that many days in a normal year bring 0.10 in or more of rain or melted snow. That makes Kremmling the 88th wettest of 149 Colorado cities and towns.

What is the wettest month in Kremmling?

August, with 4.5 rain days in a normal year. To cover 9 years in 10, plan for 8.

What is the driest month?

January, with 2.3 rain days (plan for 5).

How many heavy-rain days does Kremmling get?

3 a year with 0.50 in or more, most often in April (0.5).

Why these counts are lower than some weather sites': a rain day here means 0.10 in or more. Counts based on 0.01 in (NOAA's "days with precipitation") or 0.04 in (WeatherSpark) also include drizzle and trace days.

Rain days by month

The wettest three months are July-September, with 12.2 rain days combined; the driest are November-January, with 7.0. August is also the least predictable month, with the widest gap between its average and its plan-for number. The most rain days in a single month since 1981 was 14, in May 1995.

0510JanFebMarAprMayJunJulAugSepOctNovDec
Month Normal rain days Plan for
9 of 10 yrs
Heavy days
≥ 0.50 in
Precip (in) Record (year)
January 2.3 5 0.1 0.75 6 (2017)
February 2.4 4 0.2 0.76 6 (2025)
March 2.6 4 0.1 0.78 6 (2024)
April 4.0 6 0.5 1.21 8 (2011)
May 4.3 6 0.4 1.38 14 (1995)
June 2.8 5 0.2 0.90 9 (2009)
July 4.2 6 0.1 1.31 10 (1983)
August 4.5 8 0.2 1.29 9 (1997)
September 3.5 6 0.4 1.24 10 (2013)
October 3.0 5 0.3 0.96 7 (1984)
November 2.4 4 0.1 0.73 8 (1983)
December 2.3 4 0.1 0.73 9 (1983)
Year 38.3 2.7 12.03

Rain day: at least 0.10 in. Plan for: the 90th percentile of 1991-2020 yearly counts, rounded up to a whole day. Record: 1981 to date.

The last 12 months vs normal

From November 2025 through October 2026, Kremmling had 26 rain days against a normal of 38.3: a dry stretch, 12.3 days below normal. 3 of 12 months came in above normal and 9 below. The biggest departure was June 2026, with 0 rain days against a normal of 2.8. Precipitation totaled 7.91 in against 12.04 in normally.

MonthRain daysNormalDifferencePrecip (in)Normal (in)
Nov 2025 1 2.4 -1.4 0.30 0.73
Dec 2025 2 2.3 -0.3 0.49 0.73
Jan 2026 1 2.3 -1.3 0.30 0.75
Feb 2026 0 2.4 -2.4 0.53 0.76
Mar 2026 3 2.6 +0.4 0.48 0.78
Apr 2026 3 4.0 -1.0 0.88 1.21
May 2026 5 4.3 +0.7 1.09 1.38
Jun 2026 0 2.8 -2.8 0.15 0.90
Jul 2026 2 4.2 -2.2 0.75 1.31
Aug 2026 4 4.5 -0.5 1.40 1.29
Sep 2026 4 3.5 +0.5 0.84 1.24
Oct 2026 1 3.0 -2.0 0.70 0.96

Kremmling rain days month by month

Against the median Colorado location, Kremmling gets fewer in March, April, May, June and July, by half a day or more; other months are within half a day.

Rain days in January

Kremmling averages 2.3 rain days in January, 0.1 of them heavy, with 0.75 in of precipitation. Plan for 5 to cover 9 years in 10; the record is 6 (2017). January 2026 had 1, 1.3 below normal.

Rain days in February

Kremmling averages 2.4 rain days in February, 0.2 of them heavy, with 0.76 in of precipitation. Plan for 4 to cover 9 years in 10; the record is 6 (2025). February 2026 had 0, 2.4 below normal.

Rain days in March

Kremmling averages 2.6 rain days in March, 0.1 of them heavy, with 0.78 in of precipitation. Plan for 4 to cover 9 years in 10; the record is 6 (2024). That is 0.5 fewer than the median Colorado location (3.1). March 2026 had 3, right on normal.

Rain days in April

Kremmling averages 4.0 rain days in April, 0.5 of them heavy, with 1.21 in of precipitation. Plan for 6 to cover 9 years in 10; the record is 8 (2011). That is 0.6 fewer than the median Colorado location (4.6). April 2026 had 3, 1.0 below normal.

Rain days in May

Kremmling averages 4.3 rain days in May, 0.4 of them heavy, with 1.38 in of precipitation. Plan for 6 to cover 9 years in 10; the record is 14 (1995). That is 1.3 fewer than the median Colorado location (5.6). May 2026 had 5, 0.7 above normal.

Rain days in June

Kremmling averages 2.8 rain days in June, 0.2 of them heavy, with 0.90 in of precipitation. Plan for 5 to cover 9 years in 10; the record is 9 (2009). That is 1.1 fewer than the median Colorado location (3.9). June 2026 had 0, 2.8 below normal.

Rain days in July

Kremmling averages 4.2 rain days in July, 0.1 of them heavy, with 1.31 in of precipitation. Plan for 6 to cover 9 years in 10; the record is 10 (1983). That is 0.9 fewer than the median Colorado location (5.1). July 2026 had 2, 2.2 below normal.

Rain days in August

Kremmling averages 4.5 rain days in August, 0.2 of them heavy, with 1.29 in of precipitation. Plan for 8 to cover 9 years in 10; the record is 9 (1997). August 2026 had 4, 0.5 below normal.

Rain days in September

Kremmling averages 3.5 rain days in September, 0.4 of them heavy, with 1.24 in of precipitation. Plan for 6 to cover 9 years in 10; the record is 10 (2013). September 2026 had 4, 0.5 above normal.

Rain days in October

Kremmling averages 3.0 rain days in October, 0.3 of them heavy, with 0.96 in of precipitation. Plan for 5 to cover 9 years in 10; the record is 7 (1984). October 2026 had 1, 2.0 below normal.

Rain days in November

Kremmling averages 2.4 rain days in November, 0.1 of them heavy, with 0.73 in of precipitation. Plan for 4 to cover 9 years in 10; the record is 8 (1983). November 2025 had 1, 1.4 below normal.

Rain days in December

Kremmling averages 2.3 rain days in December, 0.1 of them heavy, with 0.73 in of precipitation. Plan for 4 to cover 9 years in 10; the record is 9 (1983). December 2025 had 2, right on normal.

Using these numbers in a construction schedule

For Kremmling, the normal column is the expected count: 38 days over a full year, 26 of them from April through October. Put those days in the schedule as non-work days or float before the job starts, not after it slips.

Average or plan-for? An average is exceeded about half the time. If August work has no float, carry 8 weather days for it rather than 4.5: Kremmling had that many or fewer in 9 of 10 years from 1991 to 2020. Use the normals across a long job and the plan-for figure only for months on the critical path.

Heavy days. Kremmling averages 3 days a year with 0.50 in or more, most often in April (0.5). Those are the days most likely to stop earthwork, paving and concrete outright.

Claiming time for abnormal weather. Under AIA A201-2017 §15.1.6.2, a claim for extra time because of adverse weather has to show the conditions were abnormal for the period, could not have been reasonably anticipated, and had an adverse effect on the scheduled work. The normals above show what could be anticipated in Kremmling; the claim also needs the day-by-day record for your site and dates.

Price a rain-day report for a site in Kremmling. Enter your dates to see actual rain days against this normal for free. The full PDF ($99) adds the daily record, a month-by-month comparison and a method statement you can attach to a schedule update or claim.

Check rain days near Kremmling

What the weather delay claim report includes

Nearby

Kremmling is in Grand County, which averages 75 rain days a year across the county. Kremmling gets 36 fewer rain days a year than that county-wide average.

The nearest larger city, Boulder (60 mi away), averages 45 rain days a year: Kremmling gets 7 fewer.

Closest other areas in Colorado:

All Colorado cities and counties

Related guides

Method and source

A rain day is a day with at least 0.10 in (2.54 mm) in PRISM's daily estimate, which covers the 24 hours ending 12:00 UTC. Heavy days use 0.50 in. Normals are 1991-2020 averages. Records run from 1981 to the last complete month. Figures are for the 4 km cell containing the Census point for Kremmling (40.056542, -106.378216). Data through 2026-11-24; page updated 2026-11-25. How we count rain days.

Source: PRISM Group, Oregon State University, https://prism.oregonstate.edu. These are gridded estimates, not gauge readings; conditions at a particular site can differ.