Rain days in Keystone, Colorado
Keystone averages 62 rain days a year, counting days with at least 0.10 in of precipitation in the PRISM 4 km grid cell that contains it (1991-2020 normals). August is the wettest month at 7.4 rain days and December the driest at 3.5. That is 19 more than the median Colorado location (43).
Quick answers
How many rain days does Keystone get a year?
About 62: that many days in a normal year bring 0.10 in or more of rain or melted snow. That makes Keystone the 13th wettest of 149 Colorado cities and towns.
What is the wettest month in Keystone?
August, with 7.4 rain days in a normal year. To cover 9 years in 10, plan for 11.
What is the driest month?
December, with 3.5 rain days (plan for 6).
How many heavy-rain days does Keystone get?
3 a year with 0.50 in or more, most often in April (0.5).
Why these counts are lower than some weather sites': a rain day here means 0.10 in or more. Counts based on 0.01 in (NOAA's "days with precipitation") or 0.04 in (WeatherSpark) also include drizzle and trace days.
Rain days by month
The wettest three months are July-September, with 19.6 rain days combined; the driest are November-January, with 11.1. July swings the most from year to year: it averages 6.8 rain days, but covering 9 years in 10 takes 11. The most rain days in a single month since 1981 was 16, in August 1983.
| Month | Normal rain days | Plan for 9 of 10 yrs |
Heavy days ≥ 0.50 in |
Precip (in) | Record (year) |
|---|---|---|---|---|---|
| January | 3.8 | 7 | 0.1 | 1.21 | 13 (1996) |
| February | 4.4 | 7 | 0.1 | 1.23 | 10 (2020) |
| March | 5.9 | 8 | 0.3 | 1.79 | 12 (2013) |
| April | 7.0 | 10 | 0.5 | 2.26 | 13 (2011) |
| May | 5.4 | 8 | 0.3 | 1.67 | 14 (1995) |
| June | 3.8 | 7 | 0.2 | 1.24 | 11 (2003) |
| July | 6.8 | 11 | 0.4 | 2.17 | 14 (1984) |
| August | 7.4 | 11 | 0.5 | 2.28 | 16 (1983) |
| September | 5.4 | 9 | 0.4 | 1.61 | 14 (2013) |
| October | 4.6 | 6 | 0.2 | 1.43 | 11 (1984) |
| November | 3.8 | 6 | 0.2 | 1.17 | 9 (1983) |
| December | 3.5 | 6 | 0.1 | 1.16 | 11 (1983) |
| Year | 61.9 | 3.3 | 19.21 |
Rain day: at least 0.10 in. Plan for: the 90th percentile of 1991-2020 yearly counts, rounded up to a whole day. Record: 1981 to date.
The last 12 months vs normal
From November 2025 through October 2026, Keystone had 58 rain days against a normal of 61.8: a dry stretch, 3.8 days below normal. 4 of 12 months came in above normal and 8 below. The biggest departure was July 2026, with 11 rain days against a normal of 6.8. Precipitation totaled 14.62 in against 19.22 in normally.
| Month | Rain days | Normal | Difference | Precip (in) | Normal (in) |
|---|---|---|---|---|---|
| Nov 2025 | 3 | 3.8 | -0.8 | 0.49 | 1.17 |
| Dec 2025 | 4 | 3.5 | +0.5 | 1.23 | 1.16 |
| Jan 2026 | 2 | 3.8 | -1.8 | 0.79 | 1.21 |
| Feb 2026 | 6 | 4.4 | +1.6 | 0.99 | 1.23 |
| Mar 2026 | 3 | 5.9 | -2.9 | 0.90 | 1.79 |
| Apr 2026 | 5 | 7.0 | -2.0 | 1.10 | 2.26 |
| May 2026 | 8 | 5.4 | +2.6 | 2.08 | 1.67 |
| Jun 2026 | 1 | 3.8 | -2.8 | 0.30 | 1.24 |
| Jul 2026 | 11 | 6.8 | +4.2 | 2.90 | 2.17 |
| Aug 2026 | 6 | 7.4 | -1.4 | 1.12 | 2.28 |
| Sep 2026 | 5 | 5.4 | -0.4 | 1.53 | 1.61 |
| Oct 2026 | 4 | 4.6 | -0.6 | 1.19 | 1.43 |
Keystone rain days month by month
Against the median Colorado location, Keystone gets more rain days in January, February, March, April, July, August, September, October, November and December, by half a day or more; other months are within half a day.
Rain days in January
Keystone averages 3.8 rain days in January, 0.1 of them heavy, with 1.21 in of precipitation. Plan for 7 to cover 9 years in 10; the record is 13 (1996). That is 1.8 more than the median Colorado location (2.0). January 2026 had 2, 1.8 below normal.
Rain days in February
Keystone averages 4.4 rain days in February, 0.1 of them heavy, with 1.23 in of precipitation. Plan for 7 to cover 9 years in 10; the record is 10 (2020). That is 2.2 more than the median Colorado location (2.2). February 2026 had 6, 1.6 above normal.
Rain days in March
Keystone averages 5.9 rain days in March, 0.3 of them heavy, with 1.79 in of precipitation. Plan for 8 to cover 9 years in 10; the record is 12 (2013). That is 2.8 more than the median Colorado location (3.1). March 2026 had 3, 2.9 below normal.
Rain days in April
Keystone averages 7.0 rain days in April, 0.5 of them heavy, with 2.26 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 13 (2011). That is 2.4 more than the median Colorado location (4.6). April 2026 had 5, 2.0 below normal.
Rain days in May
Keystone averages 5.4 rain days in May, 0.3 of them heavy, with 1.67 in of precipitation. Plan for 8 to cover 9 years in 10; the record is 14 (1995). May 2026 had 8, 2.6 above normal.
Rain days in June
Keystone averages 3.8 rain days in June, 0.2 of them heavy, with 1.24 in of precipitation. Plan for 7 to cover 9 years in 10; the record is 11 (2003). June 2026 had 1, 2.8 below normal.
Rain days in July
Keystone averages 6.8 rain days in July, 0.4 of them heavy, with 2.17 in of precipitation. Plan for 11 to cover 9 years in 10; the record is 14 (1984). That is 1.7 more than the median Colorado location (5.1). July 2026 had 11, 4.2 above normal.
Rain days in August
Keystone averages 7.4 rain days in August, 0.5 of them heavy, with 2.28 in of precipitation. Plan for 11 to cover 9 years in 10; the record is 16 (1983). That is 2.5 more than the median Colorado location (4.9). August 2026 had 6, 1.4 below normal.
Rain days in September
Keystone averages 5.4 rain days in September, 0.4 of them heavy, with 1.61 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 14 (2013). That is 1.9 more than the median Colorado location (3.5). September 2026 had 5, right on normal.
Rain days in October
Keystone averages 4.6 rain days in October, 0.2 of them heavy, with 1.43 in of precipitation. Plan for 6 to cover 9 years in 10; the record is 11 (1984). That is 1.5 more than the median Colorado location (3.1). October 2026 had 4, 0.6 below normal.
Rain days in November
Keystone averages 3.8 rain days in November, 0.2 of them heavy, with 1.17 in of precipitation. Plan for 6 to cover 9 years in 10; the record is 9 (1983). That is 1.4 more than the median Colorado location (2.4). November 2025 had 3, 0.8 below normal.
Rain days in December
Keystone averages 3.5 rain days in December, 0.1 of them heavy, with 1.16 in of precipitation. Plan for 6 to cover 9 years in 10; the record is 11 (1983). That is 1.6 more than the median Colorado location (1.9). December 2025 had 4, 0.5 above normal.
Using these numbers in a construction schedule
For Keystone, the normal column is the expected count: 62 days over a full year, 40 of them from April through October. Put those days in the schedule as non-work days or float before the job starts, not after it slips.
Average or plan-for? An average is exceeded about half the time. If August work has no float, carry 11 weather days for it rather than 7.4: Keystone had that many or fewer in 9 of 10 years from 1991 to 2020. Use the normals across a long job and the plan-for figure only for months on the critical path.
Heavy days. Keystone averages 3 days a year with 0.50 in or more, most often in April (0.5). Those are the days most likely to stop earthwork, paving and concrete outright.
Claiming time for abnormal weather. Under AIA A201-2017 §15.1.6.2, a claim for extra time because of adverse weather has to show the conditions were abnormal for the period, could not have been reasonably anticipated, and had an adverse effect on the scheduled work. The normals above show what could be anticipated in Keystone; the claim also needs the day-by-day record for your site and dates.
Price a rain-day report for a site in Keystone. Enter your dates to see actual rain days against this normal for free. The full PDF ($99) adds the daily record, a month-by-month comparison and a method statement you can attach to a schedule update or claim.
Check rain days near KeystoneNearby
Keystone is in Summit County, which averages 82 rain days a year across the county. Keystone gets 20 fewer rain days a year than that county-wide average.
The nearest larger city, Lakewood (44 mi away), averages 45 rain days a year: Keystone gets 17 more.
Closest other areas in Colorado:
- Dillon, Colorado: 50 rain days / yr, 6 mi
- Frisco, Colorado: 58 rain days / yr, 9 mi
- Silverthorne, Colorado: 55 rain days / yr, 9 mi
- Breckenridge, Colorado: 69 rain days / yr, 9 mi
- Summit County, Colorado: 82 rain days / yr, 11 mi
- Georgetown, Colorado: 66 rain days / yr, 15 mi
- Clear Creek County, Colorado: 77 rain days / yr, 15 mi
- Winter Park, Colorado: 85 rain days / yr, 20 mi
All Colorado cities and counties
Related guides
- AIA A201 Weather Delay Claims (ยง15.1.6.2): The Three Tests, With Real Numbers
- How Many Weather Days to Put in a Construction Schedule (Normal vs Plan-For)
- How to Document Weather Delays on a Construction Project (Checklist + Daily Log)
Method and source
A rain day is a day with at least 0.10 in (2.54 mm) in PRISM's daily estimate, which covers the 24 hours ending 12:00 UTC. Heavy days use 0.50 in. Normals are 1991-2020 averages. Records run from 1981 to the last complete month. Figures are for the 4 km cell containing the Census point for Keystone (39.60685, -105.932859). Data through 2026-11-24; page updated 2026-11-25. How we count rain days.
Source: PRISM Group, Oregon State University, https://prism.oregonstate.edu. These are gridded estimates, not gauge readings; conditions at a particular site can differ.