RainDayRecord

Rain days in Bisbee, Arizona

Bisbee averages 40 rain days a year, counting days with at least 0.10 in of precipitation in the PRISM 4 km grid cell that contains it (1991-2020 normals). July is the wettest month at 10.1 rain days and April the driest at 0.5. That is 13 more than the median Arizona location (27).

Quick answers

How many rain days does Bisbee get a year?

About 40: that many days in a normal year bring 0.10 in or more of rain or melted snow. That makes Bisbee the 9th wettest of 85 Arizona cities and towns.

What is the wettest month in Bisbee?

July, with 10.1 rain days in a normal year. To cover 9 years in 10, plan for 15.

What is the driest month?

April, with 0.5 rain days (plan for 1).

How many heavy-rain days does Bisbee get?

8 a year with 0.50 in or more, most often in July (1.9).

Why these counts are lower than some weather sites': a rain day here means 0.10 in or more. Counts based on 0.01 in (NOAA's "days with precipitation") or 0.04 in (WeatherSpark) also include drizzle and trace days.

Rain days by month

The wettest three months are July-September, with 23.6 rain days combined; the driest are April-June, with 2.8. July is also the least predictable month, with the widest gap between its average and its plan-for number. The most rain days in a single month since 1981 was 17, in July 2021.

051015JanFebMarAprMayJunJulAugSepOctNovDec
Month Normal rain days Plan for
9 of 10 yrs
Heavy days
≥ 0.50 in
Precip (in) Record (year)
January 2.7 5 0.6 1.04 11 (1993)
February 2.7 5 0.5 0.90 8 (1998)
March 1.9 4 0.3 0.72 7 (2020)
April 0.5 1 0.1 0.21 5 (2004)
May 0.8 2 0.1 0.25 8 (1992)
June 1.5 3 0.2 0.47 9 (2000)
July 10.1 15 1.9 3.70 17 (2021)
August 9.3 13 1.8 3.48 16 (2022)
September 4.2 8 1.0 1.78 10 (1983)
October 1.8 3 0.4 0.80 8 (2000)
November 1.5 3 0.2 0.74 6 (2019)
December 2.8 7 0.5 1.01 9 (1997)
Year 39.8 7.6 15.09

Rain day: at least 0.10 in. Plan for: the 90th percentile of 1991-2020 yearly counts, rounded up to a whole day. Record: 1981 to date.

The last 12 months vs normal

From November 2025 through October 2026, Bisbee had 51 rain days against a normal of 39.8: a wet stretch, 11.2 days above normal. 7 of 12 months came in above normal and 5 below. The biggest departure was July 2026, with 15 rain days against a normal of 10.1. Precipitation totaled 18.18 in against 15.10 in normally.

MonthRain daysNormalDifferencePrecip (in)Normal (in)
Nov 2025 2 1.5 +0.5 0.54 0.74
Dec 2025 1 2.8 -1.8 0.25 1.01
Jan 2026 7 2.7 +4.3 2.93 1.04
Feb 2026 0 2.7 -2.7 0.26 0.90
Mar 2026 1 1.9 -0.9 0.21 0.72
Apr 2026 0 0.5 -0.5 0.00 0.21
May 2026 2 0.8 +1.2 0.71 0.25
Jun 2026 2 1.5 +0.5 0.60 0.47
Jul 2026 15 10.1 +4.9 4.47 3.70
Aug 2026 9 9.3 -0.3 3.76 3.48
Sep 2026 9 4.2 +4.8 3.69 1.78
Oct 2026 3 1.8 +1.2 0.76 0.80

Bisbee rain days month by month

Against the median Arizona location, Bisbee gets more rain days in June, July, August and September, by half a day or more; other months are within half a day.

Rain days in January

Bisbee averages 2.7 rain days in January, 0.6 of them heavy, with 1.04 in of precipitation. Plan for 5 to cover 9 years in 10; the record is 11 (1993). January 2026 had 7, 4.3 above normal.

Rain days in February

Bisbee averages 2.7 rain days in February, 0.5 of them heavy, with 0.90 in of precipitation. Plan for 5 to cover 9 years in 10; the record is 8 (1998). February 2026 had 0, 2.7 below normal.

Rain days in March

Bisbee averages 1.9 rain days in March, 0.3 of them heavy, with 0.72 in of precipitation. Plan for 4 to cover 9 years in 10; the record is 7 (2020). March 2026 had 1, 0.9 below normal.

Rain days in April

Bisbee averages 0.5 rain days in April, 0.1 of them heavy, with 0.21 in of precipitation. Plan for 1 to cover 9 years in 10; the record is 5 (2004). April 2026 had 0, 0.5 below normal.

Rain days in May

Bisbee averages 0.8 rain days in May, 0.1 of them heavy, with 0.25 in of precipitation. Plan for 2 to cover 9 years in 10; the record is 8 (1992). May 2026 had 2, 1.2 above normal.

Rain days in June

Bisbee averages 1.5 rain days in June, 0.2 of them heavy, with 0.47 in of precipitation. Plan for 3 to cover 9 years in 10; the record is 9 (2000). That is 1.0 more than the median Arizona location (0.5). June 2026 had 2, 0.5 above normal.

Rain days in July

Bisbee averages 10.1 rain days in July, 1.9 of them heavy, with 3.70 in of precipitation. Plan for 15 to cover 9 years in 10; the record is 17 (2021). That is 6.1 more than the median Arizona location (4.0). July 2026 had 15, 4.9 above normal.

Rain days in August

Bisbee averages 9.3 rain days in August, 1.8 of them heavy, with 3.48 in of precipitation. Plan for 13 to cover 9 years in 10; the record is 16 (2022). That is 4.5 more than the median Arizona location (4.8). August 2026 had 9, right on normal.

Rain days in September

Bisbee averages 4.2 rain days in September, 1.0 of them heavy, with 1.78 in of precipitation. Plan for 8 to cover 9 years in 10; the record is 10 (1983). That is 1.8 more than the median Arizona location (2.5). September 2026 had 9, 4.8 above normal.

Rain days in October

Bisbee averages 1.8 rain days in October, 0.4 of them heavy, with 0.80 in of precipitation. Plan for 3 to cover 9 years in 10; the record is 8 (2000). October 2026 had 3, 1.2 above normal.

Rain days in November

Bisbee averages 1.5 rain days in November, 0.2 of them heavy, with 0.74 in of precipitation. Plan for 3 to cover 9 years in 10; the record is 6 (2019). November 2025 had 2, 0.5 above normal.

Rain days in December

Bisbee averages 2.8 rain days in December, 0.5 of them heavy, with 1.01 in of precipitation. Plan for 7 to cover 9 years in 10; the record is 9 (1997). December 2025 had 1, 1.8 below normal.

Using these numbers in a construction schedule

For Bisbee, the normal column is the expected count: 40 days over a full year, 28 of them from April through October. Put those days in the schedule as non-work days or float before the job starts, not after it slips.

Average or plan-for? An average is exceeded about half the time. If July work has no float, carry 15 weather days for it rather than 10.1: Bisbee had that many or fewer in 9 of 10 years from 1991 to 2020. Use the normals across a long job and the plan-for figure only for months on the critical path.

Heavy days. Bisbee averages 8 days a year with 0.50 in or more, most often in July (1.9). Those are the days most likely to stop earthwork, paving and concrete outright.

Claiming time for abnormal weather. Under AIA A201-2017 §15.1.6.2, a claim for extra time because of adverse weather has to show the conditions were abnormal for the period, could not have been reasonably anticipated, and had an adverse effect on the scheduled work. The normals above show what could be anticipated in Bisbee; the claim also needs the day-by-day record for your site and dates. With the last 12 months running 11.2 rain days above normal, it is worth pulling that record now.

Price a rain-day report for a site in Bisbee. Enter your dates to see actual rain days against this normal for free. The full PDF ($99) adds the daily record, a month-by-month comparison and a method statement you can attach to a schedule update or claim.

Check rain days near Bisbee

What the weather delay claim report includes

Nearby

Bisbee is in Cochise County, which averages 38 rain days a year across the county. Bisbee gets 2 more rain days a year than that county-wide average.

The nearest larger city, Tucson (76 mi away), averages 27 rain days a year: Bisbee gets 13 more.

Closest other areas in Arizona:

All Arizona cities and counties

Related guides

Method and source

A rain day is a day with at least 0.10 in (2.54 mm) in PRISM's daily estimate, which covers the 24 hours ending 12:00 UTC. Heavy days use 0.50 in. Normals are 1991-2020 averages. Records run from 1981 to the last complete month. Figures are for the 4 km cell containing the Census point for Bisbee (31.398036, -109.931834). Data through 2026-11-24; page updated 2026-11-25. How we count rain days.

Source: PRISM Group, Oregon State University, https://prism.oregonstate.edu. These are gridded estimates, not gauge readings; conditions at a particular site can differ.