Rain days in Jackson, Alabama

Jackson averages 88 rain days a year, counting days with at least 0.10 in of precipitation in the PRISM 4 km grid cell that contains it (1991-2020 normals). July is the wettest month at 10.4 rain days and October the driest at 4.9. That is close to the Alabama median of 87.

Quick answers

How many rain days does Jackson get a year?

About 88: that many days in a normal year bring 0.10 in or more of rain or melted snow. That makes Jackson the 115th wettest of 257 Alabama cities and towns.

What is the wettest month in Jackson?

July, with 10.4 rain days in a normal year. To cover 9 years in 10, plan for 14.

What is the driest month?

October, with 4.9 rain days (plan for 8).

How many heavy-rain days does Jackson get?

40 a year with 0.50 in or more, most often in July (4.0).

Why these counts are lower than some weather sites': a rain day here means 0.10 in or more. Counts based on 0.01 in (NOAA's "days with precipitation") or 0.04 in (WeatherSpark) also include drizzle and trace days.

Rain days by month

The wettest three months are June-August, with 28.2 rain days combined; the driest are September-November, with 17.1. June swings the most from year to year: it averages 8.9 rain days, but covering 9 years in 10 takes 15. The most rain days in a single month since 1981 was 19, in August 2022.

05101520JanFebMarAprMayJunJulAugSepOctNovDec
Month Normal rain days Plan for
9 of 10 yrs
Heavy days
≥ 0.50 in
Precip (in) Record (year)
January 7.8 10 3.5 5.60 16 (1991)
February 7.4 10 3.9 5.31 14 (1992)
March 7.0 9 3.5 5.44 14 (1996)
April 6.1 9 3.1 4.45 11 (1982)
May 6.6 10 2.9 4.26 18 (2009)
June 8.9 15 3.7 5.69 16 (2017)
July 10.4 14 4.0 5.92 17 (1994)
August 8.9 13 3.4 5.53 19 (2022)
September 6.4 10 2.6 4.44 18 (2009)
October 4.9 8 2.2 3.70 14 (2002)
November 5.8 9 2.9 4.51 13 (1986)
December 7.3 10 3.7 5.93 13 (2015)
Year 87.6 39.7 60.78

Rain day: at least 0.10 in. Plan for: the 90th percentile of 1991-2020 yearly counts, rounded up to a whole day. Record: 1981 to date.

The last 12 months vs normal

From November 2025 through October 2026, Jackson had 85 rain days against a normal of 87.5, close to normal overall. 4 of 12 months came in above normal and 8 below. The biggest departure was May 2026, with 17 rain days against a normal of 6.6. Precipitation totaled 53.73 in against 60.78 in normally.

MonthRain daysNormalDifferencePrecip (in)Normal (in)
Nov 2025 3 5.8 -2.8 1.45 4.51
Dec 2025 8 7.3 +0.7 3.72 5.93
Jan 2026 7 7.8 -0.8 4.26 5.60
Feb 2026 6 7.4 -1.4 3.18 5.31
Mar 2026 4 7.0 -3.0 2.91 5.44
Apr 2026 5 6.1 -1.1 3.69 4.45
May 2026 17 6.6 +10.4 12.87 4.26
Jun 2026 10 8.9 +1.1 9.58 5.69
Jul 2026 7 10.4 -3.4 2.82 5.92
Aug 2026 9 8.9 +0.1 3.65 5.53
Sep 2026 6 6.4 -0.4 3.84 4.44
Oct 2026 3 4.9 -1.9 1.76 3.70

Jackson rain days month by month

Against the median Alabama location, Jackson gets more rain days in July, August and September and fewer in March and April, by half a day or more; other months are within half a day.

Rain days in January

Jackson averages 7.8 rain days in January, 3.5 of them heavy, with 5.60 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 16 (1991). January 2026 had 7, 0.8 below normal.

Rain days in February

Jackson averages 7.4 rain days in February, 3.9 of them heavy, with 5.31 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 14 (1992). February 2026 had 6, 1.4 below normal.

Rain days in March

Jackson averages 7.0 rain days in March, 3.5 of them heavy, with 5.44 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 14 (1996). That is 0.5 fewer than the median Alabama location (7.5). March 2026 had 4, 3.0 below normal.

Rain days in April

Jackson averages 6.1 rain days in April, 3.1 of them heavy, with 4.45 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 11 (1982). That is 0.8 fewer than the median Alabama location (6.9). April 2026 had 5, 1.1 below normal.

Rain days in May

Jackson averages 6.6 rain days in May, 2.9 of them heavy, with 4.26 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 18 (2009). May 2026 had 17, 10.4 above normal.

Rain days in June

Jackson averages 8.9 rain days in June, 3.7 of them heavy, with 5.69 in of precipitation. Plan for 15 to cover 9 years in 10; the record is 16 (2017). June 2026 had 10, 1.1 above normal.

Rain days in July

Jackson averages 10.4 rain days in July, 4.0 of them heavy, with 5.92 in of precipitation. Plan for 14 to cover 9 years in 10; the record is 17 (1994). That is 1.0 more than the median Alabama location (9.4). July 2026 had 7, 3.4 below normal.

Rain days in August

Jackson averages 8.9 rain days in August, 3.4 of them heavy, with 5.53 in of precipitation. Plan for 13 to cover 9 years in 10; the record is 19 (2022). That is 0.8 more than the median Alabama location (8.1). August 2026 had 9, right on normal.

Rain days in September

Jackson averages 6.4 rain days in September, 2.6 of them heavy, with 4.44 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 18 (2009). That is 0.9 more than the median Alabama location (5.5). September 2026 had 6, right on normal.

Rain days in October

Jackson averages 4.9 rain days in October, 2.2 of them heavy, with 3.70 in of precipitation. Plan for 8 to cover 9 years in 10; the record is 14 (2002). October 2026 had 3, 1.9 below normal.

Rain days in November

Jackson averages 5.8 rain days in November, 2.9 of them heavy, with 4.51 in of precipitation. Plan for 9 to cover 9 years in 10; the record is 13 (1986). November 2025 had 3, 2.8 below normal.

Rain days in December

Jackson averages 7.3 rain days in December, 3.7 of them heavy, with 5.93 in of precipitation. Plan for 10 to cover 9 years in 10; the record is 13 (2015). December 2025 had 8, 0.7 above normal.

Using these numbers in a construction schedule

For Jackson, the normal column is the expected count: 88 days over a full year, 52 of them from April through October. Put those days in the schedule as non-work days or float before the job starts, not after it slips.

Average or plan-for? An average is exceeded about half the time. If July work has no float, carry 14 weather days for it rather than 10.4: Jackson had that many or fewer in 9 of 10 years from 1991 to 2020. Use the normals across a long job and the plan-for figure only for months on the critical path.

Heavy days. Jackson averages 40 days a year with 0.50 in or more, most often in July (4.0). Those are the days most likely to stop earthwork, paving and concrete outright.

Claiming time for abnormal weather. Under AIA A201-2017 §15.1.6.2, a claim for extra time because of adverse weather has to show the conditions were abnormal for the period, could not have been reasonably anticipated, and had an adverse effect on the scheduled work. The normals above show what could be anticipated in Jackson; the claim also needs the day-by-day record for your site and dates.

Price a rain-day report for a site in Jackson. Enter your dates to see actual rain days against this normal for free. The full PDF ($99) adds the daily record, a month-by-month comparison and a method statement you can attach to a schedule update or claim.

Check rain days near Jackson

What the weather delay claim report includes

Nearby

Jackson is in Clarke County, which averages 89 rain days a year across the county. Jackson gets 2 fewer rain days a year than that county-wide average.

The nearest larger city, Mobile (61 mi away), averages 92 rain days a year: Jackson gets 4 fewer.

Closest other areas in Alabama:

All Alabama cities and counties

Related guides

Method and source

A rain day is a day with at least 0.10 in (2.54 mm) in PRISM's daily estimate, which covers the 24 hours ending 12:00 UTC. Heavy days use 0.50 in. Normals are 1991-2020 averages. Records run from 1981 to the last complete month. Figures are for the 4 km cell containing the Census point for Jackson (31.532321, -87.891183). Data through 2026-11-24; page updated 2026-11-25. How we count rain days.

Source: PRISM Group, Oregon State University, https://prism.oregonstate.edu. These are gridded estimates, not gauge readings; conditions at a particular site can differ.